| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr Quoted ₹15.7 Cr | L1 | Accepted-AOC LOWEST |
| 2 | L2₹17.0 Cr+₹1.3 Cr (8.05%)Rejected-Finance 142 | ₹17.0 Cr+₹1.3 Cr (8.05%) | L2 | Rejected-Finance HIGHER AMOUNT |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹17.0 Cr
EMD Value
₹34.0 L
Closing Date
29 Nov 2019, 3:00 pmClosed
S.E. 9TH CIRCLE I. W. BAHRAICH
OFFICE OF THE S.E. 9TH CIRCLE I. W. BAHRAICH
Construction of Drainage Syphon at Km. 28.000, H.R. at Km. 24.200 and V.R.B. at Km. 21.600 and V.R.B. at Km. 31.310 of Rapti Main Canal in Distt. Shrawasti U.P.
2019_UPIDC_402140_3
04/SE/NAVAM/2019-20
Open Tender
Civil Works
Item Rate
270 days
BHINGA SHRAWASTI
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,354
EXECUTIVE ENGINEER SNK 4
₹34.0 L
9 Jan 2021
20 Nov 2019
29 Nov 2019
20 Nov 2019
29 Nov 2019
20 Nov 2019
Amount
E/w in digging foundation in all type of soil including all lead, lift, back filling and disposal of surplus earth for proper completion of work.
Laying plain cement concrete in 1:3:6 with 20 to 40 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T & P etc.With mechanical compaction required for proper compaction of work.
Laying R.C.C. 1:1:2 (M25 A20) in super structure of bridges using 4.75 mm. to 20 mm. size crushed kabrai stone grite with Hamirpur coarse sand and having F.M. not less than 2.0. including all taxes, material, labour, T&P etc. except steel with mechanical compaction required for proper completion of work.
Laying C.C. 1:2:4 using 4.75 mm. to 20 mm. size crushed kabrai stone grit with Hamirpur coarse sand and having F.M. not less than 2.0. including all taxes, material, labour, T&P etc. with machanicl compaction required for proper completion of work.
Centering and shuttering for C.C. work including all taxes cost of all material, labour, T&P etc.
Centering and shuttering for R.C.C. work in T-beam and slab including all taxes cost of all material, labour, T&P etc. required for proper completion work.
Cutting, bending, binding & placing of steel reinforcement in proper position including cost of all taxes, binding wire, steel, labour, T&P etc. required for proper completion work.
Providing & fixing P.V.C. water stopper 225mm wide including all taxes, cost of all material, labour and T & P etc.required for proper completion of work.
Supplying & driving of "Z" sheet pile including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
S/f 20 mm. thick joint filler board in construction joint including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
Dewatering with cost of power, Pol machines, pump. Well point system and operator etc. with assembling and deassembling of machine etc. required for proper completion of work.
Dry sand filling below foundation including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
Supplying and laying Ahirora Stone boulder of 40-60 Kg. including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
Supplying & Laying graded filter including all taxes, cost of all material, labour, T&P etc. for proper completion of work. (Coarse sand)
Pea Greavel
10 to 20mm natural single
Supplying & fixing P.V.C. pipe 75mm dia in weep hole including all cost of material, labour, T&P etc. required for proper completion of work.
Supplying & Laying of filter material with for weep hole including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
Back filling of earth with proper dressing & manual compaction for proper completion of work.
E/W in digging drain channel section in all type of soil including all lead, lift, royalty, back filling and disposal of surplus earth for proper completion of work.
Centering and shuttering for R.C.C. work upto 3m hight including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
Laying R.C.C. 1:1.5:3 using 4.75 mm. to 20 mm. size (M20 A20) crushed kabrai stone grit with Hamirpur coarse sand and having F.M. not less than 2.0. including all taxes, cost of all material, labour, T&P etc. except steel with mechanical compaction, required for proper completion of work.
Laying R.C.C. 1:1:2 (M25 A12) in railing using 4.75mm to 12mm size crushed kabrai stone grit with Hamirpur coarse sand having F.M. 2.0 including all taxes, cost of all material, labour, T&P etc. execpt steel with mechanical compaction required for proper completion of work.
S/f of Drainage spout pipe 100 mm. dia G.I. Pipe including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
E/W in constructing channel above 30 cumec discharge in all type of soil including all lead, lift, royalty and disposal of surplus earth to spoil banks with manual compaction and dressing to profiles with all labour T&P etc. required for proper completion of work. (E/W above spring level)
S.O.B. Brick on edge soling on diversion/ramps including preparation of subgrade and filling joints with local sand including all taxes, cost of all labour, T&P etc. required for proper completion of work.
Dismantling of S.O.B. Brick on edge soling from diversion including stacking with royalty and cost of all material, labour, T&P etc. required for proper completion of work.
P/F of steel expension joint including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
S/f elastomeric bearing including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
S/F Wheel guard stone including cost of all material, labour, T&P. by manufacturing at site including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
Two coat of bitumen paintings with two layer of tarfelt again followed by two coats of bitumen painting including all taxes, cost of material, labour and T&P, etc. required for proper completion of work.
P/F diamond seal including all taxes, cost of all material, labour, T&P etc. required for proper completion of work.
M/S SHIV SHAKTI CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .