| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.7 LAccepted-AOC | 1 | Accepted-AOC coatedlesserthentheestimateamount | |
| 2 | Rejected-Technical | - | Rejected-Technical substantially reason |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
24 Apr 2025, 4:00 pmClosed
Blockdevelopment officer tkm
Blockdevelopment officer tkm
Construction of Waiting Shed Kariyamedai Building Perumbedu Village at Perumbedu Panchayat Thirukazhukundram Panchayat Union.
2025_RDTN_548361_1
3350/2021/A2 Dt.11.04.2025
Open Tender
Civil Works
Item Rate
120 days
Blockdevelopment officer tkm
Construction of Waiting Shed Kariyamedai Building Perumbedu Village at Perumbedu Panchayat Thirukazhukundram Panchayat Union.
3 documents required · 3 mandatory
₹0
₹5,000
Yes
26 Apr 2025
19 Apr 2025
24 Apr 2025
19 Apr 2025
24 Apr 2025
19 Apr 2025
Amount
PART I:Construction of Waiting Shed Kariyamedai Building Perumbedu Village @ Perumbedu Panchayat Thirukazhukundram Panchayat Union. Estimate Amount : Rs.5.00 Lakhs
Waiting Shed
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,
For Foundation (I Depth)
Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the TWAD Board Officers.
Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Basement
Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
For Foundation
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,.
Upto basement
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Ceiling Plastering with C.M 1:3mix 10mm thich including cost and conveyance and all labour charges etc., complete.
Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Exterior Emulsion of wall two coat Plastic Emulsion Paint including cost and conveyance and all labour charges etc., complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
JANAKIRAMAN (BID ID -1316821)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_654173.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .