| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹46.2 LAdmitted-Finance | ₹46.2 L | L1 | Admitted-Finance |
| 2 | L2₹46.6 LAdmitted-Finance | ₹46.6 L | L2 | Admitted-Finance |
| 3 | L3₹46.6 LAdmitted-Finance | ₹46.6 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Invalid |
| 5 | Rejected-Technical | - | - | Rejected-Technical Invalid |
| Sl No | Description | Qty | Unit | Arbind Enterprise L2 | M/S Sunita Devi L1 | Dixit Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00SCHEDULE ‘A’ PART-I (SCHEDULE OF ITEMS) | ||||||
| 1.01 | Dismantling old unsv steel tank of any type and capacity from existing site including structure alongwith connecting accessories complete all as specified and as directed by Engr-in-Charge. | 1 | Each Job | 3,014.1 ₹3,014.10 | 2,985 ₹2,985 | 3,060 ₹3,060 |
| 1.02 | Supply and Installation of SFMC tank of 108000 ltr capacity with ISI marked complete all as specified and as directed by Enge-in-Charge. | 1 | Each | 18,09,451.08 ₹18.1 L | 18,35,000 ₹18.4 L | 18,16,701.6 ₹18.2 L |
| 1.03 | Supply and Installation of SFMC tank of 50000 ltr capacity with ISI marked complete all as specified and as directed by Enge-in-Charge. | 1 | Each | 8,52,393.95 ₹8.5 L | 8,35,000 ₹8.3 L | 8,45,707 ₹8.5 L |
| 1.04 | Fabrication and erection of 50000 ltr structure without PCC work complete all as specified and as directed by Engr-in-Charge. | 1 | Each Job | 10,79,345.63 ₹10.8 L | 10,49,118.05 ₹10.5 L | 10,75,477.8 ₹10.8 L |
| 1.05 | Fabrication and erection of 108000 ltr structure without column foundation complete all as specified and as directed by Engr-in-Charge. | 1 | Each Job | 7,99,724.34 ₹8.0 L | 7,82,099.85 ₹7.8 L | 8,01,750.6 ₹8.0 L |
| 1.06 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated all kinds of soil and disposal of surplus excavated soil as directed,within a lead of 50 m | 15 | Cum | 4,314 ₹4,314 | 4,272.3 ₹4,272.30 | 4,379.7 ₹4,379.70 |
| 1.07 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources. | 10 | Cum | 63,557.8 ₹63,557.80 | 62,944.2 ₹62,944.20 | 64,525.7 ₹64,525.70 |
| 1.08 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement all work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural
sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources. | 5 | Cum | 42,017.55 ₹42,017.55 | 41,611.9 ₹41,611.90 | 42,657.4 ₹42,657.40 |
| 1.09 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from
natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources | 2 | Cum | 20,465.84 ₹20,465.84 | 20,268.24 ₹20,268.24 | 20,776 ₹20,776 |
Tender Value
Refer Docs
EMD Value
₹90,000
Closing Date
14 Jan 2026, 10:30 amClosed
Commandant ARC and MC
Assam Rifles Constr and Maint Company
Repair/ replacement of old PS tank to SFMC water stroage tank 50000 ltr cap and 100000 ltr cap at ARASU, Happy Valley
2026_ARMHA_892154_2
ENG/III-235/2025-26/65 dt 01 Jan 2025
Open Tender
Civil Works
270 days
Laitkor
As per Tender Documents
2 documents required · 2 mandatory
₹1,000
Commandant ARC and MC
₹90,000
3 Mar 2026
1 Jan 2026
15 Jan 2026
1 Jan 2026
14 Jan 2026
1 Jan 2026
1 Jan 2026 - 14 Jan 2026
SCHEDULE ‘A’ PART-I (SCHEDULE OF ITEMS)
Dismantling old unsv steel tank of any type and capacity from existing site including structure alongwith connecting accessories complete all as specified and as directed by Engr-in-Charge.
Supply and Installation of SFMC tank of 108000 ltr capacity with ISI marked complete all as specified and as directed by Enge-in-Charge.
Supply and Installation of SFMC tank of 50000 ltr capacity with ISI marked complete all as specified and as directed by Enge-in-Charge.
Fabrication and erection of 50000 ltr structure without PCC work complete all as specified and as directed by Engr-in-Charge.
Fabrication and erection of 108000 ltr structure without column foundation complete all as specified and as directed by Engr-in-Charge.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated all kinds of soil and disposal of surplus excavated soil as directed,within a lead of 50 m
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement all work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns, etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for columns, Pillars, Piers, Abutments, Posts and Struts
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete all as specified.
Providing and fixing bolts including nuts and washers complete all as specified.
SCHEDULE ‘A’ PART-II (SCHEDULE OF CREDIT)
Old U/S point wiring including switches (Rate should be quoted Rs 20.00 per Kgs or more)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_937770.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid