Tender Value
₹45.6 L
EMD Value
₹90,000
Closing Date
14 Jul 2026, 6:00 pm
EE WR Division Dausa
EE WR Division Dausa
Renovation of Anicut Gram Kharandi Post Nangal Chapa
2026_WRDAS_571812_4
NIT 02/2026-27_MJSA
Open Tender
Civil Works
240 days
under jurisdiction of EE Dausa Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
as per nit
₹90,000
Yes
29 Jun 2026
29 Jun 2026
15 Jul 2026
29 Jun 2026
14 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete) | 420.9 | Sqm | 160 | ₹67,344 |
| 2 | Side shuttering including propping etc. complete (to achieve finish F 2 for :Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. | 239.43 | Sqm | 220 | ₹52,674.6 |
| 3 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) | 343.81 | Cum | 140 | ₹48,133.4 |
| 4 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) | 13,795.99 | Kg. | 89 | ₹12,27,843.11 |
| 5 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Ordinary | 19,440 | Sqm | 1.45 | ₹28,188 |
| 6 | Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 75 mm | 37.76 | Sqm | 480 | ₹18,124.8 |
| 7 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil | 1,356.03 | Cum | 95 | ₹1,28,822.85 |
| 8 | Add extra over item No. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un- loading wherever required | 166.53 | Cum | 8.5 | ₹1,415.51 |
| 9 | Dry boulder filling in required profile with filling of voids etc. complete including all lead & lifts, and well finished surface | 137.25 | Cum | 1,286 | ₹1,76,503.5 |
| 10 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement sand mortar 1:5
Masonry work in superstructure | 27.33 | Cum | 4,589 | ₹1,25,417.37 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.54 MB
BOQ_1017505.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid