Loading…
Loading…
Tender Value
₹11.9 L
EMD Value
₹23,860
Closing Date
21 Sept 2026, 6:00 pm5d left
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON REGAL LANE LAL CHOWK
Construction of lane from Dr. Nadeems house to Ghulam Mohammad Wagnoos house at Bagwanpora.
2026_HAUDD_323095_3
NOTICE INVITING ETENDER No. 32 of 2026-2027 Dated 01.09.2026 RRWD SMC
Open Tender
Civil Works
Percentage
60 days
Wagnoos house at Bagwanpora.
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹602
FA/CAO AC NO 0216010200000007
₹23,860
1 Sept 2026
1 Sept 2026
22 Sept 2026
2 Sept 2026
21 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Engagement of Labourers for site clearance | 4 | No. | 553 | ₹2,212 |
| - | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 Sqm on plan including disposal of excavated earth, lead upto 50 meter and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil : | 153.34 | Sqm | 91.75 | ₹14,068.95 |
| - | Providing and laying GSB/Black cutting/ Stone Soling including compacting, water spreading to template and consolidation with power road roller of 8 to 10 Tonne capacity etc complete. Including carriage upto site of work for all materials complete. | 67.28 | Cum | 850 | ₹57,188 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 42.4 | Cum | 5,202.9 | ₹2,20,602.96 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 67.28 | Cum | 7,104.35 | ₹4,77,980.67 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more | 2,821.64 | Kgs | 123.2 | ₹3,47,626.05 |
| - | Raising of Manholes as per site requirement | 10 | No. | 1,500 | ₹15,000 |
| - | Manufacturing supplying and fixing retro reflective overhead signage boards made up of 2mm thick aluminum sheet, face to be fully covered with high intensity and encapsulated lens type heat activated retro reflective sheeting conforming to type-III of ASTM-D-4956-01 as approved by Engineer-in-charge; letters, borders etc. as per IRC : 67-2001 in silver white with blue colour background and with high intensity grade, pasted on substrate by pressure sensitive adhesive backing which shall be activated by applying pressure conforming to class -II of ASTM-D-4956- 01 and fixing the same to the plate of structural frame work by means of suitable sized aluminum alloys, rivets or bolts and nuts @ 300mm c/c all along the periphery as well as in two vertical rows along with theft resistant measures including the cost of painting with two or more coats of epoxy paint in grey colour on the back side of aluminum sheet including appropriate priming coat. The rate includes the cost of rounding off the corners, lowering down the structural frame work from the gantry, fixing and erecting the same in position all complete as per drawing, specification and direction of Engineer-in-charge (Structural frame work including M.S. plate to be provided separately. Rectangular area of the sheet only shall be measured for payment). Overhead informatory road signage. | 0.74 | Sqm | 6,016.65 | ₹4,452.32 |
| - | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete: Hot finished welded type tubes | 18 | Kgs | 156.95 | ₹2,825.1 |
| - | Carriage of material by mechanical Transport.
Sand/Aggregates | 148.08 | Cum | 344.49 | ₹51,012.08 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_1086370.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .