Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-AOC | ₹14.4 L Quoted ₹12.2 L | L1 | Accepted-AOC Below |
| 2 | L2₹12.4 L+₹12,482.70 (1.02%)Rejected-Finance ONIYA DHANGHATA ONVIL ALI NAGAR SANT KABIR NAGAR UP 272176 | SANT KABIR NAGAR | SANT KABIR NAGAR | UTTAR PRADESH | 272176 | ₹12.4 L+₹12,482.70 (1.02%) | L2 | Rejected-Finance Reject |
Tender Value
₹11.9 L
EMD Value
₹60,000
Closing Date
22 Jul 2026, 12:00 pmClosed
EE RED SKN
RED Office Vikash Bhawan SKN
Gram Gajpur mein Dinesh Singh ke ghar se Vinod Singh ke ghar tak 240 meter naali nirman karya
2026_REDUP_1170071_1
436/RED/NIVIDA/2026-27 DT 30.06.2026
Open Tender
Civil Works
Percentage
90 days
SANT KABIR NAGAR
Please Refer Tender Doc
2 documents required · 2 mandatory
₹944
₹60,000
Yes
21 Aug 2026
17 Jul 2026
22 Jul 2026
17 Jul 2026
22 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of Foundation in ordinary soil including lift 1.5 cm lead 3 cm removal and disposal of surplus earth as directed by E/I | 129.6 | Cum | 114 | ₹14,774.4 |
| 2 | Sand Filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km from the site of work and including watering dressing etc .Rate to include cost of materials ,labour and T&P etc. required for proper completion of work . | 28.8 | Cum | 831.25 | ₹23,940 |
| 3 | concrete with 4cm gauge brick ballast ,sand of 1.25 F.M. and cement in prportion of 8:4:1 in foundation and under floors including supply of all amterials labours and tools and plants etc. required for proper completion for the work . | 21.6 | Cum | 4,042.25 | ₹87,312.6 |
| 4 | R.C.C. Work in 1:1.5:3 with cement ,coarse sand and 20 mm stone grit providing and fixing necessary centring and shuttering and its removal but excluding cost steel and its cutting and binding etc.complete in slab | 80.16 | Cum | 8,364.75 | ₹6,70,518.36 |
| 5 | Mild Steel or Iron in plain work such as in reinforced brick work (when not including in overall rates )wrought to required shape as necessary including depending for proper completion of the work and including supply of steel its wastage .bend hooks and authorised overlapping shall be measured | 62.9 | Cum | 6,792.5 | ₹4,27,248.25 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.83 MB
BOQ_2195509.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .