Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹39,200
Closing Date
30 Mar 2022, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER (SDW) XI
KILOKARI SPS JAL VIHAR LAJPAT NAGAR NEW DELHI-110024
Providing And Fixing of actuator for pump of set No. 3 at Pragati Vihar SPS.
2022_DJB_219532_1
NIT_NO_17 (2021-22) EE(SDW)-XI
Open Tender
Miscellaneous Works
Works
60 days
Pragati Vihar SPS
PLEASE REFER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹500
CURRENT ONLINE ACCOUNT LINK
₹39,200
Yes
31 Mar 2022
24 Mar 2022
30 Mar 2022
24 Mar 2022
30 Mar 2022
24 Mar 2022
120 days
Procurement of Actuator Non intrusive type intelligent designed to avoid inadvertent access to live parts. Setting of Torque Levels, Position Limits contacts etc without removal of cover and main power supply. Double Sealing, Ambient Temperature 0°C to +70 °C. Setting storage without power supply position and Torque measurement by the independent sensor, Magnetic + type/ / Hall Effect Sensor / Position measurement, Mechanical limit Switch not acceptable. Multi Turn, Piezo Sensors for Torque measurement including alarms system. Trip/ phase lost / jammed appear on the display, Digital Display LCD shall be maintained during manual operation when the Actuator is isolated from main power supply. Maintain and update the position indication during manual operation without support of main power through internal battery, Vital operational circuit’s automatically self test to ensure correct operation. Fault is diagnosed automatically using LCD display. Inhibited investigation. Data Log file downloadable by PESO Safe setting tool, software for transferring of data, accessing the data logged files. The Actuator Inbuilt Data Logger store Configuration Log following operational Data • Opening last /average torque against position • Closing last /average torque against position • Opening motor starts against position • Closing motor starts against position • Total open/closed operations • Maximum recorded opening and closing torque values • Event recorder logging operational conditions (valve, control and actuator) The data logger shall record relevant time and date information for stored data. Data log should be possible to be downloaded independent of 2 wire communication system. All Data logger data shall be in non-volatile memory and shall not get erased when no power supply is available (For the size of 1000 mm. Sluice Valve). Make:- Limitorque/ Rotork/ Auma/ Skope
Procurement of Actuator Non intrusive type intelligent designed to avoid inadvertent access to live parts. setting of Torque Levels, Position Limits contacts etc without removal of cover and main power supply. Double Sealing, Ambient Temperature 0°C to +70 °C. Setting storage without power supply position and Torque measurement by the independent sensor, Magnetic + type/ / Hall Effect Sensor / Position measurement, Mechanical limit Switch not acceptable. Multi Turn, Piezo Sensors for Torque measurement including alarms system. Trip/ phase lost / jammed appear on the display, Digital Display LCD shall be maintained during manual operation when the Actuator is isolated from main power supply. Maintain and update the position indication during manual operation without support of main power through internal battery, Vital operational circuits automatically self test to ensure correct operation. Fault is diagnosed automatically using LCD display. Inhibited investigation. Data Log file downloadable by PESO Safe setting tool, software for transferring of data, accessing the data logged files. The Actuator Inbuilt Data Logger store Configuration Log following operational Data • Opening last /average torque against position • Closing last /average torque against position • Opening motor starts against position • Closing motor starts against position • Total open/closed operations • Maximum recorded opening and closing torque va0.lues • Event recorder logging operational conditions (valve, control and actuator) The data logger shall record relevant time and date information for stored data. Data log should be possible to be downloaded independent of 2 wire communication systems. All Data logger data shall be in non-volatile memory and shall not get erased when no power supply is available (For the size of 800 mm. Sluice Valve). Make:- Limitorque/ Rotork/ Auma/Skope
Procurement of Gear Box suitable for existing Sluice Valve of size 1000mm and 800mm Make:- Limitorque/ Rotork/ Auma/skope
Procurement of adoption Kit suitable for 1000mm and 800mm dia Sluice Valve Make:- Limitorque/ Rotork/ Auma/skope
Procurement of Electrical Panel Including all required article for equipment with Measuring Transmission System. Make:- Limitorque/ Rotork/ Auma/skope
Procurement of Aluminum Armored Power Cable of size 10sq mm X 4 Make:- Grandly / Havells/Other DJB approved Make
Procurement of Copper Armored Cable of size 10 Core 1.5 sq mm Make:- Grandly / Havells /Other DJB approved Make
Fabrication and Procurement of MS Base Frame.
Dismantle of upper part of Sluice Valve of size 1000mm & 800mm cutting/ opening rusted nut and bolt with gas cutter or manual.
Fixing of Actuator on the existing Sluice Valve of size 1000mm & 800mm with the help of above adoption kit , with proper alignment , grinding, welding etc.
Installation of MS Base Frame on floor including grouting and civil work.
Laying of above cable and making the setting of Actuator Electrical Connection with Actuator and electrical Panel by using the Ferule, Packing etc
All required Safety Equipments / Articles as per NHRC Guidelines
Testing and Commissioning of Complete above work on-load and No-load including testing of level indication.
S,.D. Sales And Engineering
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .