Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
26 Aug 2026, 6:00 pmDue tomorrow
GE Utility Electric Supply
GE Utility Electric Supply DELHI CANTT-10
REPAIR AND MAINTENANCE TRANSFORMERS VCB OCB RMU BATTERY CHARGER RELAY AND CONNECTED ITEMS AT DHAULA KUAN PARTII 5 RMC URI ENCLAVE RR COLONY 61 CAVALARY TODAPUR PERIRA ENCLAVE 1 WEC EETSU
2026_MES_782826_1
GE ELECT/TOKEN-36/2026-2027
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE Utility Electric Supply
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
GE Utility Electric Supply
₹96,000
5 Aug 2026
5 Aug 2026
28 Aug 2026
5 Aug 2026
26 Aug 2026
19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Disconnecting electrically and mechanically indoor/outdoor transformers inside the substation or outdoor type on outside plinth upto 630 KVA capacity, carefully for major/minor repairs complete all as specified and directed by the Engr-in-Charge. | 7 | Each Job | - | - |
| - | Material & Labour for lifting of core assembly by opening of top cover and other items for checking of faults/repair and lowering / refixing the same in its original position after inspection to make it ready for transportation to carry out rewinding work in workshop including transportation of unservicieable transformer upto 630 KVA capacity to workshop ( rate is deemed to be inclusive of transportation , T&P and men power ) complete all as specified and directed by the Engr-in-Charge. | 7 | Each Job | - | - |
| - | Material & Labour for transportation of transformer of capacity upto 630 KVA from MES Yard to site location using Hydra/Crane and truck as per requirement to replace defective transformer including installation, testing and connecting at site and to deposit the same to MES Yard after receipt and installation of repaired transformer at site complete all as specified and directed by the Engr-in-Charge.
Note:- Contractor must arrange for transportation and installation for replacement of transformer at site immediately after receipt of verbal/telephonic/written complaint from JE/Engr-in-Charge within 1 day. Any delay beyond 1 day post receipt of complaint shall be penalized @ Rs 2500/- per day and shall be recovered from next due RAR. | 7 | Each Job | - | - |
| - | Taking out the unserviceable copper winding from transformer of capacity upto 250 KVA after opening top cover, and carrying out the following work complete all as specified and directed by the Engr-in-Charge :-
(a) Dismantling of all attachment viz breather assembly, conservator, oil temperature gauge, HT/LT bushing etc. and keeping aside for reuse.
(b) Taking out the core with winding assembly.
(c) Removing of complete winding from core and dismantling the core, cleaning of core laminate sheet and keeping aside for reuse
(d) Cleaning of complete transformer tank oil fins, removing of sludge, and making the inside surface of tank dry by blowing of hot air as directed and specified.
(e) Painting of outside surfaces of transformer complete by means of spray machine as directed. | 3 | Each Job | - | - |
| - | All as per item No 4.00 here-in -before but capacity of transformer 315 to 630 KVA. Note for Item No 4 & 5 : - In case the defective transformer not repaired & installed at site within the specified period of 15 days from the date of handing over of defective transformer/complaint to contractor, a penalty recovery @ Rs 2500/- per day will be charged from his dues. | 4 | Each Job | - | - |
| - | (a) Repairs to the transformer of capacity upto 250 KVA as follows :-
(i) Rewinding of HT/LT leg coil complete using copper wire /strip of appropriate gauge, size and turn as per existing with double paper coated insulation including all requisite insulating materials like packing sleeves, separator, tapes etc. heating, varnishing the core and winding assembly after framing up top and bottom steel structure of transformer all as specified and directed.
(ii) Replacement of all insulating materials other than incorporated for rewinding of HT/LT coils as per existing.
(iii) Fixing only HT procelain bushing with studs, nuts, washers 3 Nos. and LT procelain bushing with studs, nuts, and washers 4 Nos. and connection with primary and secondary windings and reconnecting with the main terminals as required and directed.
(iv) Fixing only breather assembly, conservator, oil temperature gauge after proper cleaning, minor repairs etc. as required and directed.
(v) Replacement of all unserviceable gasket from top cover, HT/LT bushing with new one by using rubberised gasket sheet 4.0mm/6.0mm thick duly pasted with suitable adhesive .
(vi) Replacement of unserviceable bolts with new one and fixing of existing serviceable bolts, nuts, washers of different sizes and tightening properly.
(vii) Repositioning of core and winding assembly inside the tank, assembling complete unit and making the transformer ready for filling oil and subsequent testing as directed.
(viii) Filling/topping up of new transformer oil of required quantities .
(b) M& L for transportation of repaired transformer to the original position (from where taken-down), disconnecting the alternative transformer, taking down the same, Re-installation of repaired indoor/outdoor transformer on 4/6 pole structure/plinth/inside sub station, connecting electrically and mechanically, testing and commissioning complete all as specified and directed.
(c) The following routine test as per IS 2026 (Part I) -1977 shall be carried out at repairing workshop/manufacturer having NABL Lab accredition and valid calibration of test equipments.
(i) Measurement of winding resistance.
(ii) Measurement of voltage ratio and check of voltage vector relationship.
(iii) Measurement of impedance voltage/short circuit impedance (principal tapping) and load loss .
(iv) Measurement of no load loss and current.
(v) Measurement of insulation resistance.
(vi) Dielectric tests
(d) The contractor shall give written warranty of one year from the date of sucessfull testing and installation of transformer. The contractor shall submit test report from repair workshop/manufacturer for above mentioned test.
Note :-HT/LT leg coils copper wire/strip and transformer oil required shall be measured and paid separately under relevant items of this Schedule here-in-after as supply only. | 3 | Each Job | - | - |
| - | All as per item No 6 here-in -before but capacity of transformer 315 to 630 KVA complete all as specified and directed by the Engr-in-Charge. | 4 | Each Job | - | - |
| - | Supply only HT coils with super enamelled copper wire /DPC of high quality duly matching with the existing guage and impedance complete all as specified and directed by the Engr-in-Charge. | 250 | KG | - | - |
| - | Supply only LT coils with super enamelled copper wire strip/DPC of high quality duly matching with the existing guage and impedance complete all as specified and directed by the Engr-in-Charge. | 250 | KG | 1 | ₹250 |
| - | M&L for ON load Centrifuging and dehydration including filteration and cleaning of transformer oil by dehydration machine of 11/0.433 KV transformer installed at various site on plinth/4/6 pole structure of any capacity and topping up deficient transformer oil including testing of samples before and after dehydration and filteration complete all as specified and directed by the Engr-in-Charge.
Note :- Deficient quantity of Transformer oil required for top up shall be measured and paid separately under item No 11 here-in -after as supply only. | 15,000 | Per Litre | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
TD36.pdf
Tender Documents • 0.70 MB
BOQ_877052.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].