Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Fee/PreQual/Technical/Finance | -0.05% | ₹12.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹12.5 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹12.5 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹12.7 LAdmitted-Fee/PreQual/Technical/Finance | +1.30% | ₹12.7 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.5 L
EMD Value
₹12,500
Closing Date
11 Jun 2026, 6:00 pmClosed
Executive Engineering UPSIC KANPUR
Executive Engineering UPSIC KANPUR
Construction of CC Road Ward -09 Heera Lal Compound Bajaria Scooter House of 103/02 Arif To House no 103/02B Junaind or Pappu Glowry Gali Gupta market 103/03B Sisamau vidhan Sabha Kanpur Nagar
2026_MSME_1157003_2
466/EE4/26-27
Open Tender
Civil Works
Percentage
120 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Executive Engineering UPSIC KANPUR
₹12,500
24 Jun 2026
4 Jun 2026
12 Jun 2026
4 Jun 2026
11 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of granular sub base by providing well graded material ,spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotovator at OMC , and compacting with smooth wheel roller to achieve the desired density | 84.8 | cumt | 3,129.3 | ₹2,65,364.64 |
| 2 | Brick work with common burnt clay (Non Modular) Bricks of class-150 in foundation and plinth in: cement mortar 1:4 | 17.65 | cumt | 6,548.6 | ₹1,15,582.79 |
| 3 | Laying of cc Road Slab Consisting 1:1.5:3 Cement Coarse Sand and Stone Ballast of 20 -40 mm gauge ….. Complete item | 110.61 | cum | 7,199.8 | ₹7,96,369.88 |
| 4 | Carriage of materials by manual labour including loading unloading and stacking for lead less than 0.50km | - | - | - | - |
| 5 | CC1:1.5:3 | 103.97 | cum | 236.19 | ₹24,556.67 |
| 6 | Stone ballast | 51.98 | cum | 226.17 | ₹11,756.32 |
| 7 | brick work 1:6 | - | - | - | - |
| 8 | Coarse sand | 4.97 | cum | 226.17 | ₹1,124.06 |
| 9 | brick | 8,887.2 | nos | 0.53 | ₹4,710.22 |
| 10 | Supply and Fixing of expension joint…..Complete item | 180.8 | Rmt | 90 | ₹16,272 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
TermsandConditionTenderCivilWorks.pdf
Tender Documents • 0.05 MB
BOQ_2167999.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].