Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | I₹1.3 CrAccepted-AOC H NO 50 GANDHIBASTI ROAD NATUN SARANIA PO CHANDMARI PS CHANDMARI KAMRUP M | KAMRUP | ASSAM | 781030 | ₹1.3 Cr | I | Accepted-AOC Based on technical evaluation and Assessed Available bid Capacity the work has been allotted to the bidder. |
| 2 | Not Admitted-Fee/PreQual/Technical MANGALDAI | BARPETA | ASSAM | 781308 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Finance W NO 10 BHEBARGIHAT P O P S MANGALDOI DIST DARRANG PIN 784125 | MANGALDOI | DARRANG | ASSAM | 784125 | - | - | Not Admitted-Finance Others-Based on technical evaluation and Assessed Available Bid Capacity the bidder has been not Admitted |
| Sl No | Description | Qty | Unit | M/S ELITE AGENCY L1 |
|---|---|---|---|---|
| 1.00Civil work | ||||
| 2.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 414.8 | Sqm | 20 ₹8,296 Lowest |
| 3.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | 123.26 | Cum | 190 ₹23,419.4 Lowest |
| 4.00 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used . 20.2.1 450 mm dia piles | 1,632 | Mtr | 2,263.98 ₹36,94,815.36 Lowest |
| 5.00 | Steel reinforcement for R.C.C. work ready to use “cut and bend” rebars of approved make from factory/workshop to construction site including placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or
more. | 21,435.55 | Kg | 89 ₹19,07,763.95 Lowest |
| 6.00 | Steel reinforcement for R.C.C. work ready to use “cut and bend” rebars of approved make from factory/workshop to construction site including placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 15,133.32 | Kg | 89 ₹13,46,865.48 Lowest |
| 7.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 124.78 | Cum | 8,500 ₹10,60,630 Lowest |
| 8.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 130.42 | Cum | 9,500 ₹12,38,990 Lowest |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass
concrete | 106.34 | Sqm | 350 ₹37,219 Lowest |
| 10.00 | Columns, Pillars, Piers, Abutments, Posts and Struts | 33.26 | Sqm | 580 ₹19,293.12 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
7 Jul 2026, 2:00 pmClosed
Executive Officer,MMB
Executive Officer, Mangaldai Municipal Board Darrang Mangaldai
Construction of RCC Ground floor commercial shopping complex at ward no 05 mangaldai town under 15 CFC
2026_UDD_52838_1
MMB/1211/2026/2089 dt 22/06/2026
Open Tender
Civil Works - Others
Item Rate
180 days
Ward No. 5, Mangaldai Town
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
₹2.9 L
Yes
17 Aug 2026
22 Jun 2026
7 Jul 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil work | - | - | - | - |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | Sqm | 100 | - |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | - | Cum | 100 | - |
| 4 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used . 20.2.1 450 mm dia piles | - | Mtr | 10 | - |
| 5 | Steel reinforcement for R.C.C. work ready to use “cut and bend” rebars of approved make from factory/workshop to construction site including placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or
more. | 1 | Kg | 10 | ₹9.99 |
| 6 | Steel reinforcement for R.C.C. work ready to use “cut and bend” rebars of approved make from factory/workshop to construction site including placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1 | Kg | 10 | ₹9.99 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | - | Cum | 10 | - |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | Cum | 10 | ₹9.99 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass
concrete | - | Sqm | 10 | - |
| 10 | Columns, Pillars, Piers, Abutments, Posts and Struts | - | Sqm | 10 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.84 MB
ChilaraitechnicalBid.pdf
Tender Documents • 1.50 MB
BOQ_83353.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .