Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹4.8 L (3.51%)Admitted-Finance 599 GTB ENCLAVE DDA JANTA FLATS NEAR GTB HOSPITAL VILLAGE TOWN GTB ENCLAVE CITY DELHI EAST DELHI 110093 INDIA | NORTH EAST DELHI | DELHI | 110093 | ₹1.4 Cr+₹4.8 L (3.51%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹14.0 L (10.2%)Admitted-Finance 3 A E 55 OBRA COLONY OBRA SONBHADRA UTTAR PRADESH 231219 | SONBHADRA | UTTAR PRADESH | 231219 | ₹1.5 Cr+₹14.0 L (10.2%) | L3 | Admitted-Finance |
| 4 | L4₹1.7 Cr+₹32.1 L (23.4%)Admitted-Finance ADARSH NAGAR AURIMORE ANPARA SONEBHADRA UTTAR PRADESH PIN 231225 | SONBHADRA | UTTAR PRADESH | 231225 | ₹1.7 Cr+₹32.1 L (23.4%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Electrotec Controls L4 | M/S A.K.CONSTRUCTION L1 | M/s SUN WORLD PROCESS ENGINEERING L3 | Syndicate Engineers L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | SAFE FLAME SCANNERS (Details of scope of work in annexure -1 Part-B) | 384 | JOB | 330 ₹1,26,720 | 230 ₹88,320 Lowest | 284 ₹1,09,056 | 250 ₹96,000 |
| 2.00 | HEA Igniter (Details of scope of work in annexure -1 Part-B) | 288 | JOB | 308 ₹88,704 | 170 ₹48,960 Lowest | 265 ₹76,320 | 200 ₹57,600 |
| 3.00 | 240 VAC/220 VDC solenoid actuators for oil, steam, air & scavenge valve and 240VAC solenoid operated gate (Details of scope of work in annexure -1 Part-B ) | 552 | JOB | 205 ₹1,13,160 | 120 ₹66,240 Lowest | 183 ₹1,01,016 | 150 ₹82,800 |
| 4.00 | SADC (SECONDARY AIR DAMPER CONTROL) (Details of scope of work in annexure -1 Part-B ) | 120 | JOB | 153 ₹18,360 | 130 ₹15,600 | 135 ₹16,200 | 100 ₹12,000 Lowest |
| 5.00 | Burner Tilting mechanism (Details of scope of work in annexure -1 Part-B ) | 96 | JOB | 263 ₹25,248 | 170 ₹16,320 Lowest | 231 ₹22,176 | 170 ₹16,320 Lowest |
| 6.00 | HP Bypass & LP Bypass system (Details of scope of work in annexure -1 Part-B ) | 48 | JOB | 470 ₹22,560 | 250 ₹12,000 Lowest | 419 ₹20,112 | 300 ₹14,400 |
| 7.00 | Gravimetric RC Feeders (Details of scope of work in annexure -1 Part-B) | 144 | JOB | 408 ₹58,752 | 210 ₹30,240 Lowest | 356 ₹51,264 | 250 ₹36,000 |
| 8.00 | Max – DCS System (Details of scope of work in annexure -1 Part-B) | 96 | JOB | 875 ₹84,000 | 250 ₹24,000 Lowest | 771 ₹74,016 | 450 ₹43,200 |
| 9.00 | Pneumatics Actuator(Details of scope of work in annexure -1 Part-B) | 700 | JOB | 215 ₹1,50,500 | 100 ₹70,000 Lowest | 188 ₹1,31,600 | 120 ₹84,000 |
| 10.00 | Solenoid valves (Details of scope of work in annexure -1 Part-B) | 600 | JOB | 175 ₹1,05,000 | 80 ₹48,000 Lowest | 149 ₹89,400 | 100 ₹60,000 |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
27 Oct 2025, 12:00 pmClosed
SE OMC-III, CTPS,PTPP, Parichha
office of SE OMC-III, CTPS,PTPP, Parichha- 284305
Round the clock routine/preventive/breakdown maintenance of Max-DNA DCS System, Yokogawa DDCMIS system,associated C and I equipments in boiler, TG and BOP area including SWAS, gas analyzers and condition monitoring system of unit-5and6, 2x250MW,PTPP
2025_RVUNL_1077100_1
W-PAR/C/OMC3/CIMD1/6000009745
Open Tender
Power/Energy Projects/Products
Lump-sum
730 days
CTPS, PTPP, Parichha
Refer to tender document
2 documents required · 2 mandatory
₹2,360
Refer to tender document
₹3.3 L
29 Nov 2025
24 Sept 2025
28 Oct 2025
25 Sept 2025
27 Oct 2025
25 Sept 2025
Amount
SAFE FLAME SCANNERS (Details of scope of work in annexure -1 Part-B)
HEA Igniter (Details of scope of work in annexure -1 Part-B)
240 VAC/220 VDC solenoid actuators for oil, steam, air & scavenge valve and 240VAC solenoid operated gate (Details of scope of work in annexure -1 Part-B )
SADC (SECONDARY AIR DAMPER CONTROL) (Details of scope of work in annexure -1 Part-B )
Burner Tilting mechanism (Details of scope of work in annexure -1 Part-B )
HP Bypass & LP Bypass system (Details of scope of work in annexure -1 Part-B )
Gravimetric RC Feeders (Details of scope of work in annexure -1 Part-B)
Max – DCS System (Details of scope of work in annexure -1 Part-B)
Pneumatics Actuator(Details of scope of work in annexure -1 Part-B)
Solenoid valves (Details of scope of work in annexure -1 Part-B)
POWER CYLINDER (Details of scope of work in annexure -1 Part-B)
UPS & BATTERY SYSTEM( Details of scope of work in annexure -1 Part-B)
Field Instruments associated to Max-DCS system (Details of scope of work in annexure -1 Part-B)
Hydrastep and its ckt. (BHEL vision -20M for drum level) ( Details of scope of work in annexure -1 Part-B)
Turbovisory A)Vibration probes B)Differential C) Expansion probes D)Axial shift probes E)Speed sensor Details of scope of work in annexure -1 Part-B)
Turbine control A) Turbine interlock and protection B) EHTC( Details of scope of work in annexure -1 Part-B)
Round the clock routine maintenance of SG/TG/C&I
SAFE FLAME SCANNERS CALIBRATION (Details of scope of work in annexure -1 Part-C)
CHECKING OF IGNITOR SPARK TIP/CORNER (Details of scope of work in annexure -1 Part-C )
HP Bypass & LP Bypass system (Details of scope of work in annexure -1 Part-C).
Gravimetric RC Feeders Calibration Assistant and Checking (Details of scope of work in annexure -1 Part-C).
Pneumatics Actuator (Details of scope of work in annexure -1 Part-C)
Solenoid valves (Details of scope of work in annexure -1 Part-C)
POWER CYLINDER (Details of scope of work in annexure -1 Part-C)
Field Instruments associated to Max-DCS system (Details of scope of work in annexure -1 Part-C)
REPLACEMENT OF ELECTRODES IN HYDRASTEP ( Details of scope of work in annexure -1 Part-C)
LIMIT SWITCH MAINTENANCE (Details of scope of work in annexure -1 Part-C)
Routine/preventive maintenance of electrical actuators of Unit 5&6 in 2X250MW, CTPS, Parichha
Checking, servicing/repairing of Limit Switches, push buttons, ON/OFF contacts and checking of control cable & power cable as and when required
Breakdown maintenance of electrical actuator
Overhauling of actuator Motors 12 KW
Overhauling of actuator Motors 5.2 KW
Overhauling of actuator Motors 0.1 KW
Overhauling of actuator Motors 3.3 KW
Overhauling of actuator Motors 7.5 KW
Overhauling of actuator Motors 5.0 KW
Overhauling of actuator Motors 4.0 KW
Overhauling of actuator Motors. 2.2 KW
Overhauling of actuator Motors 0.06 KW
Overhauling of actuator Motors 1.1/1.2 KW
Overhauling of actuator Motors 0.55/0.25 kw
Rewinding of Induction motors 0.4 KV, 3 Phase AC 12/14.7 KW
Rewinding of Induction motors 0.4 KV, 3 Phase AC 5.2 KW
Rewinding of Induction motors 0.4 KV, 3 Phase AC 3.3 KW
Rewinding of Induction motors 0.4 KV, 3 Phase AC 7.5 kw
Rewinding of Induction motors 0.4 KV, 3 Phase AC 4.0 kw
Rewinding of Induction motors 0.4 KV, 3 Phase AC. 2.2 kw
Rewinding of Induction motors 0.4 KV, 3 Phase AC. 1.1/1.2 kw
Rewinding of Induction motors 0.4 KV, 3 Phase AC 0.55/0.25 kw
Servicing/seal kit replacement of power cylinder
Round the clock running maintenance of field instruments installed in Ash handling and Main plant related to Auto control Loops, Interlock & protection of auxiliaries in Yokogawa DDCMIS system, CW/ACW Pump House, Dosing system, Compressor house, Hart management system, GPS Master Clock, Unit control panel with Annunciation system and Vibration system of 6.6kv auxiliaries and Routine, preventive & Breakdown maintenance work of PLC, instruments installed in Main plant and BTG area, DM plant, FO pump house, CW treatment Plant, chlorination Plant, Cooling Tower, Ash handling Plant, PT plant, Raw water, ET Plant, AC and ventilation system including Electrical & Pneumatic actuators of offside plant with its UPS system and CEMS, SWAS system Gas Analyzers (O2, H2 purity, Dust Monitor, CO, Sox, NOx) and Chemical Dosing system for unit No. 5 & 6 in 2x250MW, CTPS, Parichha
Field Instruments associated to YOKOGAWA DDCMIS system (Details scope of work in annexure -1 Part-B)
VMS SYSTEM (Details scope of work in annexure -1 Part-B)
Auxiliaries control A) Auxiliary interlock and protection B) Auto control loops (Details scope of work in annexure -1 Part-B)
ANNUNCIATION SYSTEM & UNIT CONTROL PANELS (Details scope of work in annexure -1 Part-B)
Field Instruments associated to YOKOGAWA DDCMIS (Details scope of work in annexure -1 Part-C)
Stroke Controllers (Details scope of work in annexure -1 Part-C)
REPLACEMENT OF VIBRATION PROBE OF VMS (Details scope of work in annexure -1 Part-C)
REPLACEMENT OF SLAVE CLOCK / CABLE JOINTING (Details scope of work in annexure -1 Part-C)
Syndicate Engineers (BID ID -5630769)
M/s SUN WORLD PROCESS ENGINEERING (BID ID -5631078)
M/S Electrotec Controls (BID ID -5622480)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
etender.pdf
Tender Documents • 1.37 MB
BOQ_1968273.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .