| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC AT CHILCHILA PO BRAHMAN CHHENDIA P S DHARAMGARH DIST KALAHANDI ODISHA | KALAHANDI | ODISHA | L1 | Accepted-AOC as per lottery | |
| 2 | L₹7.2 LRejected-AOC AT KHAIRPADAR PO PS DHARMAGARH DIST KALAHANDI | KALAHANDI | ODISHA | 766001 | L | Rejected-AOC as per lottery | |
| 3 | L₹7.2 LRejected-AOC JUNAGARM BLOCK | JUNAGADH | GUJARAT | 362001 | L | Rejected-AOC as per lottery |
Tender Value
₹8.5 L
EMD Value
₹8,500
Closing Date
21 May 2026, 5:00 pmClosed
Superintending Engineer
O/o SE, U.I. LCD -I, Kusumkhunti, Dist-Kalahandi Pin-766019
Renovation of Trough wall in between 1930m to RD 2020m of Nandagaon Minor-I.
2026_CEUIP_128830_1
SE, UILCD-I, 02 (14-31)/ 2026-27
Open Tender
Civil Works - Canal
Percentage
240 days
KUSUMKHUNTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹8,500
Yes
12 Oct 2026
7 May 2026
22 May 2026
7 May 2026
21 May 2026
7 May 2026
7 May 2026 - 21 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 50m outside the periphery of the area etc. complete as per the direction of the Engineer-in-charge. | 10,500 | Sqm | 2.8 | ₹29,400 |
| - | Earth work excavation for foundation in ordinary soil within the initial lead of 50m & initial lift of 1.50m including dressing & levelling the bed and slope and breaking the clods to maximum size 5cm to 7cm and laying in layers not exceeding 0.30m in height and etc. complete as per the direction of the Engineer-in-charge. | 80.6 | Cum | 206.1 | ₹16,611.66 |
| 3 | Filling the foundation & plinth with sand & well watered including cost, conveyance, royalty of all materials etc. complete as directed by the Engineer-in-charge. | 20.66 | Cum | 803.01 | ₹16,590.19 |
| 4 | Cement Concrete work of M15 using 20mm and down graded size CBHG chips including mixing with concrete mixture with cost, conveyance, royalty of all materials etc. complete & as per the direction of the Engineer-in-charge. | 76.14 | Cum | 5,470.23 | ₹4,16,503.31 |
| 5 | Rigid smooth centering and shuttering for concrete work including casting and dismantling after casting with cost, conveyance and taxes of materials and labour charges etc. complete as per the direction of the Engineer-in-charge. | 109.08 | Sqm | 248.57 | ₹27,114.02 |
| 6 | Form work for concrete with F1 finishing using steel shutter plates of approved specification for surfaces not prominently or permanently exposed to public view including supply of all materials, T & P, labour and transportation of all materials etc. complete as directed by the Engineer-in-charge. | 109.8 | Sqm | 803.66 | ₹88,241.87 |
| 7 | Filling the foundation & plinth with excavated material including watering and ramming etc. complete as directed by the Engineer-in-charge. | 26.87 | Cum | 114.5 | ₹3,076.62 |
| 8 | Earth work in ordinary soil with three extra lead over the initial lead of 50m and 1.5m initial lift including rough dressing and breaking of clods to maximum size 5cm to 7cm and laying in layers not exceeding 0.30m in height and etc. complete as per the direction of the Engineer-in-charge. | 1,033.13 | Cum | 241.6 | ₹2,49,604.21 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_589741.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.94 MB
DTCN14.pdf
Tender Documents • 1.73 MB
BOQ_589741.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .