Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹14.2 L
EMD Value
₹14,200
Closing Date
28 Jul 2025, 12:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF THE SE EUDC NUMAISH CAMP MZN
Work of shifting HT/LT line against full deposit scheme in the area of EUDD-Civil Line, Muzaffarangar
2025_PVVNL_1058977_1
16/EUDC MZN/2025-26
Open Tender
Electrical Works
Lump-sum
90 days
IN THE AREA OF EUDD-CIVIL LINE MUZAFFARNAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EUDC MZN
₹14,200
29 Jul 2025
21 Jul 2025
28 Jul 2025
21 Jul 2025
28 Jul 2025
21 Jul 2025
Amount
Carrage of following line materials from ESC to work site inculding safe loading and unloading at both ends as per site condition :-
ST Pole 13 mtr Long
ST Pole 11 mtr Long
ST Pole 9 mtr Long
Earthing set complete
33/11 KV X-arms V-Type
GI- wire 6/4/8/10 SWG for garuding
ACSR dog conductor
ACSR Rabbit conductor
LT ABC Cable (3x95+1x70+1x16) Sqmm.
LT Distribution Box 1 Phase
LT Distribution Box 3 Phase
LT AL XLPE Cable 1CX240 SQMM
LT AL XLPE Cable 1CX120 SQMM
Stay Set Complete
11 KV Polymeric pin insulator
11 KV Polymeric disc insulator with fitting
33 KV Polymeric pin insulator
33 KV Polymeric disc insulator with fitting
11 KV D/O Fuse set
11 KV TPMO switch
MS channel/angle
T-Off channel
Top channel 100x50x2240
Dropper channel 100x50x2240
Top channel 125x65x3200
Errection of Single Support of ST Pole 11 Mtr Long and fixing all accessories as per norms (Nut, bolts, stone pad, Peirceing connector, Ten Buckeel, MID span jointing sleeve and clamps will be provided by contractor as per required)
Errection of Single Support of ST Pole 9 Mtr Long and fixing all accessories as per norms (Nut, bolts, stone pad and clamps will be provided by contractor as per required)
Errection of Single Support of ST Pole 13 Mtr Long and fixing all accessories as per norms (Nut, bolts, stone pad, F-Bracket, MID span jointing sleeve and clamps will be provided by contractor as per required)
Errection of Double Pole Structure of ST Pole 11 Mtr Long and fixing all accessories as per norms (Nut, bolts, stone pad, Peirceing connector, Ten Buckeel, MID span jointing sleeve and clamps will be provided by contractor as per required)
Laying of ACSR Rabbit Condouctor
Laying of ACSR Dog Condouctor
Febrication of MS channel/angle
Providing and fixing of G.I. barbed wire
Installation and commissioning of LT distribution box 1 phase
Installation and commissioning of LT distribution box 3 phase
Laying of LT AL XLPE CABLE 1CX240 SQMM
Laying of LT AL XLPE CABLE 1CX120 SQMM
Errection fo 11 KV Fuse Set
Errectiono f 11 KV TPMO switch
Guarding of 11 KV Line with (Holding clamp with bolts and nut, EYE bolt will be bprovided by contractor)
Laying of LT ABC Cable (3x95+1x70+1x16) Sqmm. (Nut, bolts and clamps will be provided by contractor)
Errection of earthing complete as Per Norms.
Opening and reconnecting of LT consumer cable
Errection of stay complete and Grouting of stay rods including all work of excavation, cement concreet in size .60x.60x.30mm in ration 1:4:4 (Cement, sand, 40mm brick ballast) as per drg. including back filling & proper ramming etc. with fixing tightening & nuzzling of stay set with the pole (all material provided by contractor).
Grouting of Pole with cement, sand, bricks CC ratio1:4:4 as per RESPO norms (all material provided by contractor).
Dismentiling of 250 KVA transformer form plinth and disconnection of LT and HT side.
Dismentiling of 100 KVA transformer form D/P and safely carriage to new site.
Dismentiling of 25 KVA transformer form D/P and safely carriage to new site.
Making of Plinth of size (6'x6'x6') for placing transformer. Plinth constructed by 2:3:5 cement, sand and first class bricks and plinth covered by plaster with 1:3 cement and sand for smooth working all complete the works. (all materials provided by contractor).
Providing of earth electrode for chemical earthing pipe in pipe type proper hot dip Galvanization die 50mm length 3 mtr-32mm x 6mm terminal connection hole dia 8mm. The cavity between the pipe & pipe if filled with conductive mixture for hermetically filling inside the cavity i.r. between secondary conductor & Primary conductor & Primary conductor, crystalling compound is to be injected in the electrode assembly. It is a combination of high conductivity metal alloys, copper & aluminium power, conductivive carbon/ cement and bonding material etc. The electrode should be sealed from both the ends.
Making of fiber Fancing for 250 KVA transformer (all material will be provided by contractor)
Errection of 250 KVA transformer on plinth and re-connection of LT and HT side.
Errection of 100 KVA transformer on D/P and connection of LT and HT side (Lugs will be provided by contractor)
Errection of 25KVA transformer on D/P and connection of LT and HT side (Lugs will be provided by contractor)
Cutting and choping of tree branches
Providing and fixing of danger board with clamp.
Providing and fixing of number plate with clamp.
Providing of alluminium paint and painting of electric poles
Providing of Red oxide paint and paintng of electric poles
Dismentiling of following materials and carrage of materials from site to JE Store inculding safe loading and unloading at both ends as per site condition -
STP Pole With fitting
Dismentliing of PCC Pole with fitting
ABC cable
AB Conductor
Dog conductor
M/S ABID CONTRACTOR (BID ID -5382432)
A.K.ELECTRICALS (BID ID -5383917)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .