Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-Finance | L1 | Accepted-Finance as the bidder is L1 | |
| 2 | L2₹21.2 L+₹6.5 L (43.8%)Accepted-Finance | L2 | Accepted-Finance as the bidder is L2 | |
| 3 | L3₹21.3 L+₹6.5 L (44.1%)Accepted-Finance | L3 | Accepted-Finance as the bidder is L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
7 Dec 2020, 3:00 pmClosed
Executive Engineer REW Div. Ramban
Office of the Executive Engineer REW Div. Ramban
Construction of Foot Bridge at Upper Kumarpora, Panchayat Bohardar-B, Block Ramsoo, District Ramban.. (CD and Pyt.)
2020_RDPR_110041_2
e-NIT No. 08 of REW RAMBANof 2020 21 dt 25 11 20
Open Tender
Civil Works
Item Rate
90 days
Ramban
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW Div. Ramban
₹50,000
19 Dec 2020
26 Nov 2020
7 Dec 2020
26 Nov 2020
7 Dec 2020
26 Nov 2020
Amount
work in excavation by manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 1 m and lift up to 1.5m,disposed earth to be levelled and neatly dressed. All kinds of soil : Including all leads, lift and carriage complete
Providing and laying in position cement concrete 1 Cement: 5 fine sand: 10 graded stone aggregate 40 mm nominal size excluding the cost of centering and shuttering - All work up to plinth leve. Including all leads, lift and carriage complete
Providing and laying in position RCC 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size). Crushed excluding the cost of centering, shuttering, finishing and reinforcement, all work upto plinth level. Including all leads, lift and carriage complete
Providing and laying in position cement concrete 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20mm nominal size). Crushed, with 30 % boulders. excluding the cost of centering, shuttering, finishing and reinforcement, in walls any thickness , Columns, Pillars, Piers, Abutments, Posts and Struts. Including all leads, lift and carriage complete
Providing and laying in position cement concrete 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20mm nominal size). Crushed, excluding the cost of centering, shuttering, finishing and reinforcement, in walls any thickness , Columns, Pillars, Piers, Abutments, Posts and Struts. Including all leads, lift and carriage complete
Providing and laying specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement, all work upto plinth level. 1:1.5:3 (1 cement: 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). crushed.Including all leads, lift and carriage complete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . TMT bars.Including all leads, lift and carriage complete. Including all leads, lift and carriage complete
Centering and shuttering including strutting, propping etc. and removal of formwork for Foundations, footings, bases of columns, etc. Including all leads, lift and carriage complete
Centering and shuttering including strutting, propping etc. and removal of formwork for Columns, Pillars, Piers, Abutments, Posts and Struts.Including all leads, lift and carriage complete
Centering and shuttering including strutting, propping etc. and removal of formwork for Edges of slabs and breaks in floors and walls above 20 cms wide.Including all leads, lift and carriage complete
Dry random Masonry Laid with hard stone in foundation and plinth: using nallah stone without bond stone.Including all leads, lift and carriage complete
Dumping/ filling of stone boulder horiontal.Including all leads, lift and carriage complete
Supply, Fabrication, Erection, Lunching, Railing and Painting two coats of synthetic enamal paint over a coat of approved steel primer of Steel foot bridge all complete.Including all leads, lift and carriage complete.
ABDUL QAYOOM
Rehmatullah Naik
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .