Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LRejected-Finance | ₹10.9 L | L1 | Rejected-Finance Bid Withdrawn |
| 2 | L2₹11.6 L+₹63,601.77 (5.82%)Rejected-Finance | ₹11.6 L+₹63,601.77 (5.82%) | L2 | Rejected-Finance Denied working in L1 rate |
| 3 | L2₹11.6 L+₹63,601.77 (5.82%)Rejected-Finance | ₹11.6 L+₹63,601.77 (5.82%) | L2 | Rejected-Finance Denied working in L1 rate |
Tender Value
₹11.6 L
EMD Value
₹11,570
Closing Date
29 Apr 2026, 5:00 pmClosed
Unit Head, O/o the GM (El.), CHEP, Chiplima
O/o the GM (El.), CHEP, At/PO-Chiplima, Via-C.A. Chiplima, Dist.-Sambalpur-768025
Annual Upkeeping and Cleaning of Residential Colony of CHEP, Chiplima
2026_OHPCL_128175_1
CHEP-03/2026-27 (Sl. No.2)
Open Tender
Civil Works - Others
Percentage
365 days
Residential Colony of CHEP, Chiplima
As per DTCN
2 documents required · 2 mandatory
₹6,000
₹11,570
Yes
14 Jul 2026
18 Apr 2026
30 Apr 2026
18 Apr 2026
29 Apr 2026
18 Apr 2026
18 Apr 2026 - 24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Daily cleaning with broom stick over earth, cement concrete road surface including cost of labours, T&P charges etc as per direction of Engineer-in-Charge. (except Sunday and National holidays). (5153.60 Sqft. X 294 days in a year) | - | Sqft | - | - |
| - | Weekly cleaning with broom stick over earth, cement concrete road surface including cost of labours, T&P charges etc as per direction of Engineer-in-Charge. (except Sunday and National holidays). (75878.50 Sqft. X 52 times in a year) | - | Sqft | - | - |
| - | Bi-monthly disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-Charge, beyond 50 m initial lead, for all leads including all lifts involved.
(151.74 Cum X 6 times in a year) | - | Cum | 1 | - |
| - | Quarterly cleaning of shrub jungles, uprooting of stumps and small bushes and tree below 1 mtr grith on pre-measurement including staking of waste materials and proper disposal of the same including cost of labours, T&P charges etc complete in all respect as per direction of Engineer-in-Charge. (28713.17 Sqm X 4 times in a year) | - | Sqm | - | - |
| - | Bi-Monthly Cleaning maintenance of old sewerage lines and manholes with disposal of Malba includes complete dewatering and cleaning, flushing of inter connecting pipes, equipment, channels, bottom sludge cleaning, properly disposal of sludge as per direction of engineering-in-charge upto a suitable distance including all machinary, manpower and complete to the satisfactry of Engineer-in-Charge. (1402.50 Rmtr. X 6 times in a year) | - | Rmtr. | - | - |
| - | Yearly Cleaning of septic tank removal of dirt and disposal of the same away from the township areas as and when required including cost of labours, T&P charges etc complete in all respect as per direction of Engineer-in-Charge. (9142.11 Cft. X 1 time in a year) | - | Cft. | - | - |
| - | Yearly Earth work excavation for temporary drainage systems in different locations in ordinary soil within 50 mtrs. initial lead and 1.5 mtrs. initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.30 mtrs in depth & as per direction of Engineer-in-charge.
(19.25 Cum X 1 time in a year) | - | Cft. | 1 | - |
| - | Quarterly cleaning of top roof of building including staking of waste materials and proper disposal of the same including cost of labours, T & P Charges etc. complete in all respect as per direction of Engineer-in-Charge. (122532.19 Sqft. X 4 times in a year) | - | Sqft. | 1 | - |
| - | Daily cleaning with phool jhadu over mosaic, cement marbel floor, tile floor including cost of labours, T&P charges etc as per direction of Engineer-in-Charge.
(3659.73 Sqft. X 294 days in a year) | - | Sqft. | - | - |
| - | Daily cleaning with long head mop soaked with scented phenyl over cement floor, mosaic floor, marbel floor, tile floor including cost of labours, T&P charges etc complete in all respect as per direction of Engineer-in-Charge. (except Sundays & National Holidays) (3659.78 Sqft. X 294 days in a year) | - | Sqft. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
cancelled_1.pdf
pdf • 1.33 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
DTCN2.pdf
Tender Documents • 0.27 MB
BOQ_587927.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .