Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-Finance | ₹4.1 L | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹4.6 L+₹51,669.87 (12.5%)Rejected-Finance | ₹4.6 L+₹51,669.87 (12.5%) | L2 | Rejected-Finance 2nd Lowest |
| 3 | L3₹5.2 L+₹1.1 L (25.8%)Rejected-Finance 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | ₹5.2 L+₹1.1 L (25.8%) | L3 | Rejected-Finance 3rd Lowest |
| 4 | L3₹5.2 L+₹1.1 L (25.8%)Rejected-Finance | ₹5.2 L+₹1.1 L (25.8%) | L3 | Rejected-Finance 3rd Lowest |
| 5 | L4₹5.6 L+₹1.4 L (35.0%)Rejected-Finance | ₹5.6 L+₹1.4 L (35.0%) | L4 | Rejected-Finance 4th Lowest |
Tender Value
₹6.2 L
EMD Value
₹12,400
Closing Date
9 Sept 2026, 11:00 amClosed
Executive Engineer Chamba Division HPPWD Chamba
Executive Engineer Chamba Division HPPWD Chamba
Repair of Sainik Rest House at Chamba (SH Replacement of roofing partly, P/F Deodar wood ceiling , painting on roofing etc.)
2026_PWD_142526_3
No. WA-II-2026-27- 17971-18020 dated 29.08.2026
Open Tender
Civil Works - Others
Percentage
60 days
Chamba
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹12,400
14 Sept 2026
2 Sept 2026
9 Sept 2026
2 Sept 2026
9 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead and lift as per direction of Engineer - in - charge.including carriage of materials within all leads, lifts and other incidentals and as directed by the Engineer-in-Charge. The rate including octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government. | 50 | Per Cubic metre | 148.89 | ₹7,444.5 |
| 2.01 | Dismantling of wooden boardings, in lining of wall and partition including frame work and stacking the material within 50 metres lead and lift as per direction of Engineer - in - charge.including carriage of materials within all leads, lifts and other incidentals and as directed by the Engineer-in-Charge. The rate including octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government. | - | Per Cubic metre | 76.8 | - |
| 3.01 | Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead and lift as per direction of Engineer - in - charge.including carriage of materials within all leads, lifts and other incidentals and as directed by the Engineer-in-Charge. The rate including octroi, royality, Malkana, toll tax, GST or any other taxes imposed by the Government. | 1 | Per Cubic metre | 2,813 | ₹2,810.19 |
| 4.01 | Providing second class deodar wood work in frames of doors, windows, clerestory windows and other frames wrought, framed and fixed in position complete including carriage of materials within all leads, lifts and other incidentals as directed by the Engineer-in-Charge. The rate is including octroi, royality,Malkana,toll tax, GST or other taxes imposed by the Government. | - | Per Cubic metre | 1,30,000 | - |
| 5.01 | Providing and fixing 25 mm thick (twenty five millimetre ) deodar wooden plank ceiling with tongued and grooved jointing and wood screws complete within all leads and lifts and as per the direction of the engineer-in-charge and other incidentals. The rate including octroi, royality,Malkana,toll tax, GST tax or other taxes imposed by the Government. | 1 | Per Square metre | 4,115 | ₹4,110.89 |
| 6.01 | Providing and fixing plain square edged cover fillets (beading) 15mmx12mm (fifty into twelve millimetre )section with wood screws in ceiling and lining including mitring at junctions complete within all leads and lifts and as per the direction of the engineer-in-charge and other incidentals. The rate including octroi, royality,Malkana,toll tax, GST tax or other taxes imposed by the Government. | 1 | Per running metre | 210 | ₹209.79 |
| 7.01 | Providing and fixing 250 x25 mm thick ( Two hundred fifty isto twenty five millimetre ) deodar wooden plank ceiling with tongued and grooved jointing and wood screws complete within all leads and lifts and as per the direction of the engineer-in-charge and other incidentals. The rate including octroi, royality,Malkana,toll tax, GST tax or other taxes imposed by the Government. | 1 | Per running metre | 850 | ₹849.15 |
| 8.01 | Providing and fixing TATA steel corrugated 0.63 mm thick ( zero point sixty three millimetre) G.I. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm( eight millimetre) diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.including carriage of materials within all leads, lifts and other incidentals and as directed by the Engineer -in-Charge. The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | - | Per Square metre | 1,005 | - |
| 9.01 | Providing and fixing TATA steel corrugated 0.63 mm thick ( zero point sixty three millimetre) ridges or hips of width 60 cm( sixty centimetre) overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm( eight millimetre) dia G.I. limpet and bitumen washers complete including carriage of materials within all leads, lifts and other incidentals and as directed by the Engineer -in-Charge. The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 1 | Per running metre | 661 | ₹660.34 |
| 10.01 | Providing and fixing TATA steel corrugated 0.63 mm thick ( zero point sixty three millimetre) valleys of 90 cm(ninety centimetre) wide overall in plain G.S. sheet fixed with polymer coated J, or L hooks, bolts and nuts 8 mm( eight millimetre) dia G.I. limpet and bitumen washers complete including carriage of materials within all leads, lifts and other incidentals and as directed by the Engineer -in-Charge. The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 1 | Per running metre | 762 | ₹761.24 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_211780.xls
BOQ • 0.32 MB
Biddocument.pdf
Tender Documents • 4.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .