Loading…
Loading…
Tender Value
Refer Docs
Closing Date
17 Oct 2026, 11:59 pmClosed
Bangalore International Airport Limited
Published by the portal on this tender, for queries and grievance redressal.
SITC of Kitchen Equipment for Combo Hotel
17 Oct 2026
13 Oct 2026
13 Oct 2026
9 Oct 2026 - 10 Oct 2026
Technical Specification
Frame Capacity in kW
Power Module Capacity in kW
Max Number of Power Modules
Max Number of frames in parallel
Input Characteristics:
Rated Voltage tolerance without battery sharing according with load rate
Rated Frequency
Current Harmonic Distortion (THDi) @full load & <1%THDv
Input Power factor at rated Voltage (from 25% to 100% load)
Input Protection
Delay of Progressive start of rectifier (Power walk in start delay)
Battery Characteristics:
No of Lead cells/Battery Blocks
Rated Battery Voltage
Ripple Current with Recharged Battery (%)
Float voltage (2.26V/cell, Configurable)
Recharge Voltage(2.3V/cell, Configurable)
Maximum Output Voltage (Vdc)
End of Discharge Voltage Vdc (1.75V/cell, Configurable)
Voltage Compensation with reference to the battery room/cabinet temperature (Vper deg C)
Maximum Current to charge battery (Amp)
Output Characteristics:
Rated Frequency
Voltage Variation - Static Load
Voltage Variation - Dynamic Loads
Recovery Time within +/-1%
Voltage Distortion at linear load
Voltage Distortion at nonlinear load
Frequency stability with inverter synchronized to the by-pass mains
Frequency stability with inverter not synchronized to the by-pass mains
Speed of Frequency Variation / Slew Rate
Dis-symmetry of the phase’s voltage with balanced or unbalanced load
Voltage phase shift with balanced and unbalanced load
Overload capacity at 40deg C
Output performance classification (According to IEC / EN62040-3)
Load Power Factor
Short Circuit Withstand
Inverter Efficiency
Efficiency Characteristics:
Efficiency @ 100% load
Efficiency @ 75% load
Efficiency @ 50% load
Efficiency @ 25% load
Bypass Characteristics:
Rated Frequency
Rated Frequency Tolerance
Switching onto by-pass with Inverter synchronized (UPS in “Normal Mode”)
Switching onto by-pass with non-synchronized Inverter (UPS in “Normal Mode”)
Switching from by-pass to Inverter-Eco Mode
Overload capacity on by-pass line (kVA)
Communication Characteristics:
Monitoring of Local Area Network
Building Management System
Emergency Power Off (EPO)
Environmental Characteristics:
Maximum Temperature for 8 hours a day
Average Temperature for 24 hours
Recommended Battery Temperature
Range of Relative Humidity
Maximum Operating Altitude
Storage Temperature
Acoustic noise at 1m from panel front (Ref ISO3746)
Mechanical Characteristics:
Dimension in mm - Frame
Dimension in mm - Module
Weight in Kgs - Frame without power module
Weight in Kgs - Module
Ingress Protection of Cabinet
Input Characteristics:
Rated input voltage
Input voltage tolerance band - without battery sharing with load.
Rated input frequency
Total harmonic distortion of current ITHD (With mains VTHD < 1%)
Input power factor at rated voltage. (From 25% to 100% load)
Delay of progressive start of rectifier (Power Walk-in Start delay)
Battery Characteristics:
Number of lead cells / Battery blocks
Rated battery voltage
Ripple current with recharged battery (%)
Float voltage (2.26 V/cell., configurable)
Recharge Voltage (2.3 V/cell., configurable)
Maximum output voltage (Vdc)
End of discharge voltage Vdc (1.75 V/cell, configurable)
Voltage compensation with reference to the battery room/cabinet temperature (V per °C)
Maximum current to charge battery (A)
Output Characteristics:
Rated power (kVA)
Rated active power (kW)
Nominal Current (A)
Rated output voltage
Rated frequency
Static variation
Dynamic variation
Recovery time within ±1%
Crest current factor (as per EN 62040-3)
Voltage distortion at linear load
Voltage distortion at non-linear load
Frequency stability with inverter synchronized to the by-pass mains
Frequency stability with inverter not synchronized to the by-pass mains.
Speed of frequency variation /Slew Rate (settable)
Dissymmetry of the phase’s voltage with balanced or unbalanced load.
Voltage phase shift with balanced and unbalanced load.
Overload capacity
Battery mode efficiency (%) at full load
Bypass Characteristics:
Rated voltage tolerance
Rated frequency
Rated frequency tolerance
Switching onto by-pass with Inverter synchronized (UPS in “Normal Mode”)
Switching onto by-pass with non-synchronized Inverter (UPS in “Normal Mode”)
Switching from by-pass to Inverter (UPS in DIM)
Efficiency Characteristics:
Efficiency AC/AC (System on line)
Efficiency system in DIM mode (ECO mode)
Environmental Characteristics:
Ambient temperature for the UPS
Maximum temperature for 8 hours a day
Average temperature for 24 hours
Recommended battery temperature
Range of relative Humidity
Maximum Operating Altitude
Storage temperature
Acoustic noise at 1 m from panel front (Ref ISO 3746)
Mechanical Characteristics:
Dimensions (WxDxH) (mm)
Degree of protection for enclosure
Cabinet steel thickness
HMI Characteristics
Parameters in HMI
Communication characteristics:
UPS & BATTERY MAKE DETAILS
SL NO DESCRIPTION MAKE 1 MAKE 2 MAKE 3 MAKE 4 MAKE 5 MAKE 6 MAKE 7 MAKE 8 MAKE 9 MAKE 10
1 UPS DELTA FUJI ELECTRIC EATON VERTIV SCHNEIDER SOCOMEC NUMERIC LEGRAND FUJI RIELLO
2 BATTERY EXIDE AMARA RAJA ENEROCKET
Project CONROAD
Subject LIGHT FIXTURES QTY
LOCATION 15W LED SURFACE MOUNTING LED ROUND (STAIRCASE & TOILET) 20W SURFACE / WALL MOUNTING LED LIGHT (PARKING) 40W SURFACE MOUNTING LED LIGHT (DRIVEWAY & ROOM) 15W LED SURFACE/RECESSED LIGHT FIXTURE FOR (LIFT &CORRIDORS) EXHAUST FAN 6/16A SOCKET
LOWER GROUND FLOOR 16 100 4 8 31
UPPER GROUND FLOOR (B1) 59 14
UPPER GROUND FLOOR (B2) 21 6
UPPER GROUND FLOOR (B3) 21 6
UPPER GROUND FLOOR (B6) 69 18
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Anexx-04- 202501 BACL EHS Management Plan.pdf
Guideline • 1.55 MB
Anexx-04-Employer Requirements Final 140520241.pdf
Guideline • 9.90 MB
Anexx- 02 - BOQ, spec & drawings_Anexx- 02 - BOQ, spec & drawings_Electrical Technical Spec - UPS & Battery.pdf
Guideline • 0.27 MB
Anexx- 02 - BOQ, spec & drawings_Anexx- 02 - BOQ, spec & drawings_Layout_BAHL CH WD 204A-R2 GF- MEZ 1 - BLOCK WORK DRAWING - 29-09-2025.dwg
Guideline • 1.85 MB
Anexx- 02 - BOQ, spec & drawings_Anexx- 02 - BOQ, spec & drawings_Layout_BAHL CH WD AR 202B -05-09-2025- Basement-1 04.10.2025.dwg
Guideline • 3.95 MB
Anexx- 02 - BOQ, spec & drawings_Anexx- 02 - BOQ, spec & drawings_Layout_BAHL-CH-WD-AR-214A - R0 - GINGER BLOCK WORK - 25-09-2025.dwg
Guideline • 15.03 MB
Anexx- 02 - BOQ, spec & drawings_Anexx- 02 - BOQ, spec & drawings_Layout_BAHL-CH-WD-AR-214A- vivanta ups room.dwg
Guideline • 18.18 MB
Anexx- 02 - BOQ, spec & drawings_Anexx- 02 - BOQ, spec & drawings_TDS Format.xlsx
Guideline • 0.02 MB
Anexx- 02 - BOQ, spec & drawings_Anexx- 02 - BOQ, spec & drawings_Technical Specification_Electrical Technical Spec - UPS & Battery.pdf
Guideline • 0.27 MB
Anexx- 02 - BOQ, spec & drawings_Anexx- 02 - BOQ, spec & drawings_UPS Make List.xls
Guideline • 0.09 MB
Compliances.pdf
Guideline • 0.42 MB
Letter of Declaration.docx
Guideline • 0.34 MB
Documents to be Furnished.pdf
Guideline • 0.13 MB
Retention Bank Guarantee Format.docx
Guideline • 0.04 MB
Advance Bank Guarantee Format.docx
Guideline • 0.04 MB
Performance Bank Guarantee Format.docx
Guideline • 0.04 MB
Insurance.pdf
Guideline • 0.92 MB
RFQ Kitchen Equip.docx
Guideline • 0.39 MB
Anexx-04 202501 BACL EHS Management Plan.pdf
Guideline • 1.55 MB
Anexx-04-Employer Requirements Final 140520241_2.pdf
Guideline • 9.90 MB
Annex 01_ Preambles and scope of work.docx
Guideline • 0.04 MB
Annex 03 Timelines- SITC- Kitchen equipment.docx
Guideline • 0.02 MB
RFX0000781 -Guidelines.docx
Guideline • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .