Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 CrAccepted-AOC 885 RADHAPURAM MAIN ROAD VADAKKANKULAM 627116 TIRUNELVELI DISTRICT | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627116 | ₹1.6 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.6 Cr+₹4.5 L (2.86%)Rejected-AOC | ₹1.6 Cr+₹4.5 L (2.86%) | 2 | Rejected-AOC L2 |
| 3 | 3₹1.7 Cr+₹9.2 L (5.87%)Rejected-AOC | ₹1.7 Cr+₹9.2 L (5.87%) | 3 | Rejected-AOC L3 |
| 4 | 4₹1.7 Cr+₹10.5 L (6.70%)Rejected-AOC | ₹1.7 Cr+₹10.5 L (6.70%) | 4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | S.A.V.Constructions L1 | A.SARATHA L3 | Thiraviam Suresh L4 | M/S.J D PHILOMIN PALASTER DHAS L2 |
|---|---|---|---|---|---|---|---|
| 1.00Schedule-A (CIVIL Works) | |||||||
| 2.00 | Earth work excavation by mechanical means(hydraulic excavator) / manual means for foundation, trenches etc., in all types of soils below ground level including shoring, strutting, bailing / pumping of water, leveling, ramming the bottom of excavation, refilling with selected excavated materials in the sides of the foundation in layers, consolidating and disposing off the surplus earth at places as directed with in a lead of 2 Kms all as per drawings and specifications. - up to 1.5m ht | 850 | Cu.M | 150 ₹1,27,500 Lowest | 198 ₹1,68,300 | 200 ₹1,70,000 | 180 ₹1,53,000 |
| 3.00 | Providing and laying plain cement concrete 1:3:6, using 40 mm and down graded stone aggregate at all height including mechanical mixing, leveling, compaction, vibrating, finishing smooth the exposed surfaces of concrete, curing etc complete as per drawings and standard specifications. | 45 | Cu.M | 3,600 ₹1,62,000 Lowest | 3,746 ₹1,68,570 | 4,000 ₹1,80,000 | 4,320 ₹1,94,400 |
| 4.00 | Providing and laying plain cement concrete 1:2:4, using 20 mm and down graded stone aggregate at all height including mechanical mixing, leveling, compaction, vibrating, finishing smooth the exposed surfaces of concrete, curing etc complete as per drawings and standard specifications. | 68 | Cu.M | 4,200 ₹2,85,600 | 4,335 ₹2,94,780 | 4,000 ₹2,72,000 Lowest | 4,500 ₹3,06,000 |
| 5.00 | Filling in basement with selected earth in layers of not more than 150 mm thick, each layer well rammed, watered and consolidated as per specifications. Selected earth shall be brought from a maximum lead of 2 km with in the Site. | 310 | Cu.M | 100 ₹31,000 | 105 ₹32,550 | 100 ₹31,000 | 95 ₹29,450 Lowest |
| 6.00 | Providing Pre-construction anti-termite treatment using chlorpyriphos emulsifiable concentrate 20 % with 1 % concentration as per specifications. Note: The contractor shall furnish from the agency carrying out this work under this item a written guarantee in favour of NPCIL for the satisfactory performance of the treatment for a period of ten years. | 400 | SqM | 100 ₹40,000 Lowest | 108 ₹43,200 | 100 ₹40,000 Lowest | 108 ₹43,200 |
| 7.00 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC , carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm ) having CBR Value-30, as per clause 401 of MORT & H specifications complete in all respects . | 78 | Cu.M | 900 ₹70,200 | 855 ₹66,690 | 800 ₹62,400 | 792 ₹61,776 Lowest |
| 8.00Providing and constructing Random Rubble masonry in CM 1:6 using hard granite stones including hammer dressing the stones, providing bond stones as per specifications ,raking out the joints, scaffolding,curing etc.,complete as per specifications. | |||||||
| 9.00 | In foundation and basement | 75 | Cu.M | 3,000 ₹2,25,000 Lowest | 3,303 ₹2,47,725 | 3,200 ₹2,40,000 | 3,420 ₹2,56,500 |
| 10.00 | Providing and laying M20/M25 Design mix concrete with cement content up to 350kg/Cum using 20mm and down graded stone aggregates including Mixing, Ramming, Compaction, leveling, curing, placing at all lifts, including scaffolding and Finishing smooth all exposed faces complete as per specification. | 340 | Cu.M | 5,000 ₹17,00,000 Lowest | 5,606.6 ₹19,06,244 | 5,500 ₹18,70,000 | 5,400 ₹18,36,000 |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
7 Jul 2025, 5:00 pmClosed
Chief Engineer E and US
KKNPP
Construction of Additional Class Room Buildings to Hindu Middle School, Sanganapuram and St Xavier Middle School, Perumanal at Radhapuram Taluk, Tirunelveli district.
2025_NPCIL_238347_1
NPCIL/KKNPP/AD/CSR ACTIVITIES/PT/2025/86
Open Tender
Civil Works - Buildings
Works
365 days
Radhapuram Taluk
Pre Qualification Details available in Tender document
3 documents required · 3 mandatory
₹0
₹4.4 L
CMM Works Group
7 Nov 2025
17 Jun 2025
9 Jul 2025
17 Jun 2025
7 Jul 2025
27 Jun 2025
17 Jun 2025 - 24 Jun 2025
25 Jun 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .