Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹16.1 LAccepted-AOC | ₹16.1 L | L2 | Accepted-AOC Accepted |
| 2 | L1₹16.1 LRejected-Finance | ₹16.1 L | L1 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Ranjithkumar L2 | Mrs.Sornagandhi Arulnathan L1 |
|---|---|---|---|---|---|
| 1.01 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart. (First depth of 2m ) | 58.32 | cum | 263.76 ₹15,382.48 | 263.2 ₹15,349.82 |
| 1.02 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart. (2 nd Depth) | 8.75 | cum | 263.76 ₹2,307.90 | 263.2 ₹2,303 |
| 1.03 | Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by Department officers. | 4.37 | cum | 2,328.2 ₹10,174.23 | 2,328.1 ₹10,173.80 |
| 1.04 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers. | 4.37 | cum | 6,146.6 ₹26,860.64 | 6,146.1 ₹26,858.46 |
| 1.05 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department (For footing below G.L. ( 1,50 to 4,50 below GL ) | 13.52 | cum | 9,490 ₹1.3 L | 9,489.5 ₹1.3 L |
| 1.06 | For Column and Brace upto G.L ( 0 to1,50 below GL ) | 1.75 | cum | 9,351.22 ₹16,364.64 | 9,351 ₹16,364.25 |
| 1.07 | For column and brace (I 0 to 4.50m from GL | 2.83 | cum | 9,492.28 ₹26,863.15 | 9,492.13 ₹26,862.73 |
| 1.08 | For column and brace II 4.50m to 7.32m from GL | 2.22 | cum | 9,770.18 ₹21,689.80 | 9,770 ₹21,689.40 |
| 1.09 | For column and brace III 7.32 to 10.98m from GL | 2.53 | cum | 10,048 ₹25,421.44 | 10,048 ₹25,421.44 |
| 1.10 | For column beam floor slab side wall from 10.98m to 14.64 m from GL | 11.38 | cum | 10,325.95 ₹1.2 L | 10,325.25 ₹1.2 L |
Tender Value
₹19.1 L
EMD Value
₹19,050
Closing Date
5 Dec 2025, 3:00 pmClosed
Block Development Officer BP, Kammapuram
Panchayat Union Office, Kammapuram
Construction of 30000 litres capacity OHT Ambethkar Nagar in Su.Keenanur Panchayat
2025_RDTN_626920_1
C1/0524/2025
Open Tender
Civil Works - Water Works
180 days
Panchayat Union Office, Kammapuram
As per tender
3 documents required · 3 mandatory
₹0
₹19,050
Yes
Panchayat Union Office, Kammapuram
6 Dec 2025
27 Nov 2025
5 Dec 2025
27 Nov 2025
5 Dec 2025
27 Nov 2025
1 Dec 2025
Amount
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart. (First depth of 2m )
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Deparment officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart. (2 nd Depth)
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by Department officers.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Department officers.
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Department (For footing below G.L. ( 1,50 to 4,50 below GL )
For Column and Brace upto G.L ( 0 to1,50 below GL )
For column and brace (I 0 to 4.50m from GL
For column and brace II 4.50m to 7.32m from GL
For column and brace III 7.32 to 10.98m from GL
For column beam floor slab side wall from 10.98m to 14.64 m from GL
For side wall, hance and Roof slab from 14.64 m to 18.30 m from GL
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding (For column footing and GL Brace )
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding (For Brace I )
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding (For Brace II )
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding (For Brace III )
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding (Roof slab)
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding (For Floor Beam and Bottm of Floor slab)
For column Below GL
For column GL 0 to 3.30M
For column ( 3.31m to 4.30m )
For column ( 4.31m to 5.30m).
For Column (5.31m to 6.30m )
For Column (6.31m to 7.30m )
For Column (7.31m to 8.30m )
For Column (8.31m to 9.30m )
For Column (9.31m to 10.30m )
For Column (10.31m to 11.30m )
For Column (11.31m to 11.40m )
For Side Wall, & Floor slab sides and Haunch
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Deparment officers.
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by Deparment officers
Providing MS Ladder & Hand rails arrangements in 30,000 Lits. Capacity OHT With 12.00m Staging Height SOR PG no 90
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cur
Providing GI ventilating arrangements mosquito proof nylon net with 50 mm GI pipes and cowl and as directed by Deparment officers
Supply of GI Pipes for OHT Connections 65 mm dia SOR Pg no 40
Supply and Delivery of G.M.Gate valve 65mm size SOR Pg no 45
Supply & Delivery of 65 mm G.I Tee SOR Pg no 44
Supply & Delivery of 65 mm G.I Coupling SOR Pg no 44
Supply & Delivery of 65 mm G.I bend SOR Pg no 44
Supply & Delivery of 90mm T.Coupler PVC SOR Pg no 27
Supply & Delivery of 80mm x 65mm G.I.Reducer SOR Pg no 41
Supply & Delivery of 65mm G.I.flange set SOR Pg no 44
Labour charges for fixing of G.I. Pipes & Specials for OHT pipe connections as directed by the Deparment Officers,
Refilling of the foundation with execavated soil in layers of thick including ramming watering etc., complete as directed by the Department officers
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with
Filling with good river sand into foundation and basement including cost and conveyance of all materials to work site and all labourcharges for filling, watering etc., complete.
CC 1:4:8 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying and watering etc., complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISSHBG metal from approved sources including cost and conveyance of all materials to work site and all labour charges for mixing, laying, and watering etc., complete. Above basement
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. Upto basement
Brickwork in CM 1:5 mix using country bricks of standard size including cost and conveyance of all materials to work site and including all labour charges and all incidential charges etc., complete. For Superstruture.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work. (Based on SoR 2023-24)
Plastering in CM 1:5 ,12mm thick including cost and conveyance of all materials to work site and all labour charges etc., complete.
Flooring with Granolithic flooring to 25mm thick using CC 1:2:4 mix using 20mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete.
Painting the newly plastered wall surface with two coats of Plastic Emulsion Paint outside the building over one coat of cement primer including clearing the surface in all floors etc., complete as per standard specification.
Painting two coats with ready mix paint of approved colour and trade for doors & windows including cost and conveyance of all materials and all other labour charges etc., complete.
Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding lai
Supplying and erriecting, centring for plane surfaces structures such as RCC slab, beam etc., inlcuding strutting upto 3m height using mild steel sheets of size 90cm x 60cm x and B.G 10 stiffened with M.s angles of size 25 mm x 25mm x 3mm for boarding lai
Supply and fabrication of steel including cost and conveyance of steels to worksite including labour for cutting, jointing and welding if necessary including all labour charges for dying with binding wire etc., complete.
Supplying Steel Door and windows as per standard specification
Wiring with 2 x 1.50 sqm ( 22/0.3 ) PVC insulated unsheathed single core Copper Conductor of 1100 v Grade in suitable PVC Rigid Pipe on wall and ceiling with PVC accessaries with TW Switch box with 5 A F . T . Switch with painting of suitable colour for Light Point and Fan Point ( For Electronic Regulator ) S D N o 18
Supply and fixing of 15w CFL Lamp (spiral lamp) for existing holder on wall etc complete.
Supply and fixing of 16amps DP Switch with metal clod of 500v with tube connection 32Amps and netural on suitable T.W Plug plante with supplying on reeper on Either side With PWD Earthen etc.
Supply and run of 2 of 6s.qm 84/100 pvc SC Unstrenthed on condition of 1100v grade in 25mm side GI Pipe lend with both ends with necssary angles etc
Supply and run of 2 of 6s.qm 84/103 pvc SC Unstrenthed on condition of 1100v on 7/70 GI Reducer with fuse service connection etc
Towards cost and supply of RCC Jolly of size 0.60*0.60m
Earthwork excavation and depositing on bank with an intial lesd & lift in hard stiff clay, gravelly soil, shales, murrams earth mixed soil as per SS 20 B for foundation
Sand filling with good M.sand including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Cement concrete in 1:4:8 mix using 40 mm metal used for foundation including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:3 (One cement and three M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Cement concrete in 1:2:4 mix using 20 mm metal including cost & conveyance of all materials to site and all labour charges for curing, compacting etc., complete.
Provision for Chloriner set,Ladder Lockset
Provision for QC Charges
Provision for LWF 1%
Ranjithkumar (BID ID -1525149)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
SuKeenanurOHT30000ltr.pdf
Tender Documents • 0.42 MB
BOQ_749570.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid