Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.3 LAccepted-AOC NO 18 DUVARAGAPILYAR KOIL STREET TIRUPATHUR 635601 | TIRUPATHUR | TAMIL NADU | 635601 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹45.5 L+₹18,437.38 (0.41%)Rejected-AOC | L2 | Rejected-AOC Highest Bidder |
Tender Value
₹45.9 L
EMD Value
₹46,000
Closing Date
3 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA
The Project Director DRDA
Upgradation / Strengthening/ Renewal of 2 roads including 5 years routine maintenance after completion under Package no. 29/MGSMT/2022-23 in Tirupathur Block of Tirupathur District under MGSMT 2022-23.
2023_RDTN_303424_1
E1/0802/2023
Open Tender
Civil Works
Item Rate
180 days
DRDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹46,000
13 Jul 2023
18 Apr 2023
3 May 2023
18 Apr 2023
3 May 2023
18 Apr 2023
Amount
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc compite, as per MOST specification asper SS20 A
Collection and supply of Girrty gravel for side berms and labour charges for filling etc complete
Picking up existing BT surface upto 5 to 10 cm of old metalled surface. cambering, sectioning of carriage way etc., complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery. fuel and all other incidental charges etc., complete
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SSI for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying the premix carpet with seal coat type a for 20mm thickness using 0.18 Cum of 13.2 mm IRC HBG metal and 0.09 Cum of 11.2 mm IRC HBG metal with 14.60 Kg of bitumen for pre mixing 10 Sqm of premix carpet for seal coat using 0.09 Cum of 6.70 mm chips with 9.80 Kgs of bitumen per 10 Sqm including cost and conveyance of materials to the work site and stacking them to the Dept metric gauge for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80-100 KN, power roller for premix carpet and seal coat separately including labour charges for spreading the mix for the pre mix carpet application of bitumen for the seal coat over pre mix carpet, hire charges and fuel charges for mini hot mix plant bitumen boiler power roller and all other tools and plants employed etc., complete as per
Road Marking with Hot applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision for Hectometer stone
Provision for Guard stones
Provision of sign Board Charges
Providing Name board cum Citizen Board
Routine Maintenance
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc compite, as per MOST specification asper SS20 A
Collection and supply of Girrty gravel for side berms and labour charges for filling etc complete
Picking up existing BT surface upto 5 to 10 cm of old metalled surface. cambering, sectioning of carriage way etc., complete
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery. fuel and all other incidental charges etc., complete
Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SSI for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying prime coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying TACK COAT over the WMM surface (treated with primer) using 2.50 Kg of Bituminous Emulsion RS I for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying the premix carpet with seal coat type a for 20mm thickness using 0.18 Cum of 13.2 mm IRC HBG metal and 0.09 Cum of 11.2 mm IRC HBG metal with 14.60 Kg of bitumen for pre mixing 10 Sqm of premix carpet for seal coat using 0.09 Cum of 6.70 mm chips with 9.80 Kgs of bitumen per 10 Sqm including cost and conveyance of materials to the work site and stacking them to the Dept metric gauge for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80-100 KN, power roller for premix carpet and seal coat separately including labour charges for spreading the mix for the pre mix carpet application of bitumen for the seal coat over pre mix carpet, hire charges and fuel charges for mini hot mix plant bitumen boiler power roller and all other tools and plants employed etc., complete as per
Road Marking with Hot applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Construction of 1.5m RCC Slab Culvert at Main Road km 0/010
Earth work excavation and depositing on bank with initial lead of 10m Initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete Foundation
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges for mixing laying and compacting etc. complete
RCC 1:1.5:3 mix using 20 mm ISS sine HBG metal including cost and conveyace of all materials and all labour charges,etc
Supply and fabrication of steel for RCC Items including cost and conveyance of binding wire, etc., complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded
Slab Centring
Supply and fixing of weep holes using 90mm PVC Pipes Including cost of all site etc.,
Supply and fixing of 20mm thk joints complete as per drawing including cost of all site etc.,
Supply and fixing of Tar Paper for bearing between deck slab including cost of all site etc.,
Provision for Hectometer stone
Provision for Guard stones
Provision of sign Board Charges
Providing Name board cum Citizen Board
Routine Maintenance
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Aruna Construction
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .