Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹13.5 L+₹43,502.55 (3.34%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹14.1 L+₹1.1 L (8.30%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹14.3 L+₹1.3 L (9.95%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹14.8 L+₹1.7 L (13.1%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
29 Jul 2026, 4:00 pmClosed
Executive Engineer PWD R and B Division Kathua
Executive Engineer PWD R and B Division Kathua
Refer to BOQ
2026_PWDJK_316387_1
E-NIT No 56/2026-27/4061-65/G Dated 16.07.2026
Open Tender
Civil Works
Percentage
90 days
Kathua
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer PWD R and B Division Kathua
₹50,000
Executive Engineer PWD R and B Division Kathua
7 Aug 2026
17 Jul 2026
30 Jul 2026
17 Jul 2026
29 Jul 2026
17 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms , incl. disposal or filling of excavated earth wherever required as per the directions of Engineer-in-charge . | 29.2 | Cum | 256.85 | ₹7,500.02 |
| 2 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material in cement mortar, all leads & lifts. | 0.25 | Cum | 1,458.45 | ₹364.61 |
| 3 | Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment) | 1,016.4 | Cum | 281.3 | ₹2,85,913.32 |
| 4 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, lead upto 50 meter and lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil | 159.4 | Sqm | 91.75 | ₹14,624.95 |
| 5 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth incl. all leads and lifts as directed by Engineer-in-Charge.All kinds of soil : | 6.8 | Cum | 187.3 | ₹1,273.64 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 24.88 | Cum | 4,826.5 | ₹1,20,083.32 |
| 7 | Providing and laying in position cement concrete of specified grade inclu. curing excluding the cost of centring & shuttering-All work upto plinth level 1:4:8 (1 cement: 4 fine sand : 8 graded stone aggregate 40mm nominal size) | 0.19 | Cum | 5,202.9 | ₹988.55 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level 1:3:6 (1 cement: 3 coarse sand : 6 graded stone agg. 20mm nominal size) | 44.75 | Cum | 5,733.6 | ₹2,56,578.6 |
| 9 | Providing & laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete | 8.35 | Sqm | 346.7 | ₹2,894.94 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1.1 | Cum | 6,591.25 | ₹7,250.38 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_1031359.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .