Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹48.3 LFinancial bid opened Safety works including development of central Plaza area , balance retaining walls, roads, drainage works and slope stability works in the campus of NIT Goa at Cuncolim, Goa, SH: Providing & Laying grass concrete paver block, providing & fixing S.S. railing work. | Safety works including development of central Plaza area , balance retaining walls, roads, drainage works and slope stability works in the campus of NIT Goa at Cuncolim, Goa, SH: Providing & Laying grass concrete paver block, providing & fixing S.S. railing work. | L1 | Financial bid opened | |
| 2 | L2₹56.0 L+₹7.7 L (16.0%) Safety works including development of central Plaza area , balance retaining walls, roads, drainage works and slope stability works in the campus of NIT Goa at Cuncolim, Goa, SH: Providing & Laying grass concrete paver block, providing & fixing S.S. railing work. | Safety works including development of central Plaza area , balance retaining walls, roads, drainage works and slope stability works in the campus of NIT Goa at Cuncolim, Goa, SH: Providing & Laying grass concrete paver block, providing & fixing S.S. railing work. | L2 | - | |
| 3 | - | - | - |
| Sl No | Description | Qty | Unit | SS TOTAL CONSTRUCTION INDIA PVT LTD L1 | RIZWAN AHMED L2 |
|---|---|---|---|---|---|
| 1 | CIVIL WORK | - | - | -25.1 ₹48,31,229.01 Lowest | -13.13 ₹56,03,322.62 |
Tender Value
₹64.5 L
EMD Value
₹1.3 L
Closing Date
7 Nov 2025, 3:00 pmClosed
EE&SM( C) -2
Mukesh Kaushal
Goa project Circle
Safety works including development of central Plaza area , balance retaining walls, roads, drainage works and slope stability works in the campus of NIT Goa at Cuncolim, Goa, SH: Providing & Laying grass concrete paver block, providing & fixing S.S. railing work.
131971
08/EE&SM(C)-II/Goa/2025-26
OPEN
Civil Works - Buildings
NCB
25 days
South Goa, Goa
20 documents required · 20 mandatory
₹1.3 L
Not Applicable
7 Nov 2025
4 Nov 2025
7 Nov 2025
7 Nov 2025
6 Nov 2025
stage.html
html • 0.08 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
NITsafetybalancework-03-11-2025+final+updated.pdf
document • 1.66 MB
gcc+corection+slips+nit+safety+work+ss+railing_.pdf
document • 36.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .