Tender ID
Tender Value
₹4.1 Cr
EMD Value
₹4.9 L
Closing Date
13 Mar 2026, 6:00 pmClosed
HQ CE (AF) WAC PALAM
HQ CE (AF) WAC PALAM
PROVN OF DEFICIENT MD ACCN AT AF STN AMRITSAR CANTT
2025_MES_737375_2
CEWAC/ASR/T-02/2025-26
Open Tender
Civil Works
Lump-sum
540 days
AGE (I) AF AMRITSAR
AS PER NIT AND TENDER DOCUMENTS
8 documents required · 8 mandatory
₹2,000
AGE (I) (AF) AMRITSAR
₹4.9 L
Yes
20 Feb 2026
20 Feb 2026
16 Mar 2026
20 Feb 2026
13 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE `A' PART - I (Building Works) is not prepriced by MES and prepriced rates indicates 0.0 under column 6 signified this fact only. | |||||
| - | Construction of Married Accn building for 14 SGT and below including ground parking in four storey (G+3) with permanent specifications complete all as specified and shown on drawings. | 1 | Each Block | - | - |
| 1.02 | Construction of Married Accn building for 5 SGT and below including ground parking in three storey (G+2) with permanent specifications complete all as specified and shown on drawings. | 1 | Each Block | - | - |
| - | Lump sum price worked out by the Contractor for “SITE CLEARANCE, EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part II | 1 | Lump sum | 4,90,212.5 | ₹4,90,212.5 |
| - | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part III | 1 | Lump sum | 5,51,221.86 | ₹5,51,221.86 |
| - | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIC SUPPLY" as listed in Schedule ‘A’ Part IV | 1 | Lump sum | 20,46,641.31 | ₹20,46,641.31 |
| - | Lump sum price worked out by the Contractor for “ROAD SHOULDERS AND HARDSTANDING" as listed in Schedule ‘A’ Part V | 1 | Lump sum | 15,60,948.3 | ₹15,60,948.3 |
| - | Lump sum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part VI | 1 | Lump sum | 6,12,439.66 | ₹6,12,439.66 |
| - | Lump sum price worked out by the Contractor for “AREA DRAINAGE ” as listed in Schedule ‘A’ Part VII | 1 | Lump sum | 2,77,726.82 | ₹2,77,726.82 |
| - | Lump sum price worked out by the Contractor for “CHAIN LINK FENCING” as listed in Schedule ‘A’ Part VIII | 1 | Lump sum | 32,106.29 | ₹32,106.29 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
TENDER.pdf
Tender Documents • 10.89 MB
BOQ_844025.xls
BOQ • 0.62 MB
Binder1.pdf
Additional Documents • 13.98 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .