Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.6 LAdmitted-Finance | -7.12% | ₹7.6 L | L1 | Admitted-Finance |
| 2 | L2₹8.1 L+₹53,954.06 (7.13%)Admitted-Finance | -0.50% | ₹8.1 L+₹53,954.06 (7.13%) | L2 | Admitted-Finance |
Tender Value
₹8.2 L
EMD Value
₹81,502
Closing Date
25 Jun 2026, 12:00 pmClosed
Chief Engineer
NAGAR NIGAM AGRA
Zone-1, Ward No. 96, Dhankot Area Rohatgi Dharamshala (19/84 to 19/95) near Fabbara Kua Sadhuram, Deendayal Verma Street and connecting lanes Construction and repair work involving CC flooring and drains in the streets.
2026_DOLBU_1161782_1
02-06-2026/NAGAR NIGAM AGRA/23-06-2026/331
Open Tender
Construction Works
Percentage
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Nagar Nigam
₹81,502
14 Aug 2026
19 Jun 2026
25 Jun 2026
19 Jun 2026
25 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling cement concrete or brick or granolithic but floor to be stone flagged or tiled floor including stacking of dismantled as directed by E/IC with in a distance of 60 meters (200 Feet). | 374.4 | Sqm | 55 | ₹20,592 |
| 2 | Dismantling cement concrete or brick or granolithic but floor to be stone flagged or tiled floor including stacking of dismantled as directed by E/IC with in a distance of 60 meters (200 Feet). | 84.6 | Cum | 140 | ₹11,844 |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam (22.40-53mm) specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. | 37.44 | Cum | 3,369.35 | ₹1,26,148.46 |
| 4 | Class-150 (Non Modulao brick work in 1 :4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the wor ( Chapter No. 06 Sr.No. 2) | 31.95 | Cum | 5,650 | ₹1,80,517.5 |
| 5 | 12mm cement plaster with cement mortar in proportion of 'l:4 cement & coarse sand of single coat for interior plastering upto flool two level including internal rounded angles chamfers, and rounded angles not exceedlng 80mm. ln girth and finished even and smooth. (Chapter No.13 Si.No.1) | 82.8 | Sqm | 200 | ₹16,560 |
| 6 | Providing and laying Cement Concrete in 1:2:4 of not less than strength of M-15 stone grit (20 mm nominal size) approved coarse sand and cement. Curing complete including of cost of form work in foundation and floors.(5-Chapter Sr.No.6 Si.No..4.1.3) | 46.8 | Cum | 6,600 | ₹3,08,880 |
| 7 | Supply & Fixing of Glass Strips for expension Joint etc all complete. (NS) On market Rate | 70 | Nos | 275 | ₹19,250 |
| 8 | Disposal of Refuse Malva mixed soil up to 8km. distance loading & unloading etc. all Complete. (None Scheduled) | 71.14 | Cum | 230.1 | ₹16,369.31 |
| 9 | Raising & re-fixing of manhole including all material labor T&P etc. all complete. (NS) | 5 | Nos | 500 | ₹2,500 |
| 10 | Supply & fixing of R.C.C. manhole frame and cover including all complete. (NS) | 5 | Nos | 2,500 | ₹12,500 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.36 MB
BOQ_2177774.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .