Loading
Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
17 Jul 2023, 3:00 pmClosed
PR & CC
The tender is invited for CARRYING OUT MAJOR TANK REPAIR WORKS AND PAINTING OF TANK
23000023-HD-11370
23000023-HD-11370
Open Tender
Churu, Rajasthan
₹0
₹10 L
17 Jul 2023
24 Jun 2023
17 Jul 2023
17 Jul 2023
24 Jun 2023 - 12 Jul 2023
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | Dismant of Struc Steel& Plates | Dismant of Struc Steel& Plates — AS PER SCOPE OF WORK AND TERMS AND CONDITIONS ATTACHED. | - | Metric Ton |
| 2 | Dismant of foam seal(dia 40mtr | Dismant of foam seal(dia 40mtr | - | Each |
| 3 | Dimant&re-install RIM seal | Dimant&re-install RIM seal | - | Each |
| 4 | Dimant&re-install TAS equipmen | Dimant&re-install TAS equipmen | - | Each |
| 5 | Supply of Steel plates | Supply of Steel plates — PLATE; DESIGN TYPE:PLAIN; MATERIAL:MILD STEEL; MATERIAL SPEC:IS 2062 GRADE E250 BR; INSPECTION CERTIFICATE:REQUIRED; THICKNESS:6 MM; SIZE:L 6300 X B 1500 MM; DRAWN PROCESS:HOT ROLLED | - | Metric Ton |
| 6 | Fabrication of Steel plates | Fabrication of Steel plates — AS PER SCOPE OF WORK AND TERMS AND CONDITIONS ATTACHED. | - | Metric Ton |
| 7 | Fabrication-appurten(Dia40mtr) | Fabrication-appurten(Dia40mtr) — AS PER SCOPE OF WORK AND TERMS AND CONDITIONS ATTACHED. | - | Metric Ton |
| 8 | Supply&Fab of struc steel | Supply&Fab of struc steel — S/F/P OF STRUCTURE STEEL: SUPPLY, FABRICATION AND ERECTION OF STRUCTURE/GRATING IN POSITION; BOLTED AND/OR WELDED STRUCTURAL STEEL WORKS AT ALL LEVELS; INCLUDING ALL BUILT-UP SECTIONS/COMPOUND SECTIONS MADE OUT OF ROLLED SECTIONS AND/OR PLATES IN TRUSSES; RAFTERS; PURLIN; WIND TIES; COLUMN; PORTALS; PLATFORMS; STAIRCASES; LADDERS; STOPPERS; BRACKETS SAG RODS; SUPPORTS FOR EQUIPMENT AND ACCESSORIES; HAND RAILINGS POSTS CUTTING TO REQUIRED SIZE AS PER APPROVED DRAWINGS; STRAIGHTENING IF REQUIRED BOLTING/WELDING OF JOINTS, NOTE:1. ALL STRUCTURAL STEEL SHALL OF APPROVED MAKE STEEL (AS PER HPCL APPROVED LIST), 2. PAINTING SPECIFICATIONS: THE COST INCLUDES SURFACE PREPARATION BY MANUAL CLEANING. PRIMER COAT: AFTER SURFACE PREPARATION ONE COAT OF INORGANIC ZINC SILICATE AT 65 MICRONS. INTERMEDIATE COAT: ONE COAT OF EPOXY HIGH BUILT MIO AT 100 MICRONS. TOP FINISH COAT:2 COATS OF ACRYLIC ALIPHATIC POLYURETHANE AT 30 MICRONS PER COAT. TOTAL DFT 225 MICRONS MINIMUM. THE RATE INCLUDES THE COST OF MATERIALS, CONSUMABLES, LABOUR, TOOLS, TRANSPORTATION, LOADING, UNLOADING, MACHINERY, SAFETY REQUIREMENT, INCIDENTAL CHARGES, IF ANY, ALL COMPLETE. 3. PREPARING DRAWING OF STRUCTURAL STEEL IS IN VENDOR COPE, DRAWING APPROVAL NEED TO BE TAKEN FROM LOCATION-IN-CHARGE. NOTE: SUPPLY OF ALL REQUIRED MACHINERIES LIKE. HYDRA, JCB, BREAKER, AND TOOLS-TACKLES ETC. WILL BE IN VENDOR SCOPE. | - | Kilograms |
| 9 | Supply&Fab of leg support | Supply&Fab of leg support | - | Each |
| 10 | PCC Work | PCC Work — AS PER SCOPE OF JOB ATTACHED. | - | Cubic Meters |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
23000023-HD-11370.pdf
TENDER_DOCUMENT • 14.57 MB
Download all tender documents and submit your bid