Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.8 Cr
EMD Value
₹3.8 L
Closing Date
16 Dec 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
EXECUTIVE ENGINEER RDSD SIMDEGA
RDSD SIMDEGA
Construction of 6 No Additional Class room in Boys Residential upgraded high school Hatinghore under block Bano, District Simdega.Gr 01
2026_RDSPL_121452_1
RDD/SD/SIMDEGA/06/2026-27
Open Tender
Civil Works - Buildings
Works
Hatinghore Bano
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹3.8 L
Yes
26 Nov 2026
26 Nov 2026
18 Dec 2026
26 Nov 2026
16 Dec 2026
26 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item - A) and disposal of excavated earth obtained to a distance up to 50 m, including all lifts, with leveling, ramming the foundation trenches, removing roots of trees/shrubs, all complete as per approved design and per building specification and direction of E/I. | 408.07 | cum | 239.02 | ₹97,536.89 |
| 2 | Extra for earth work in hard soil as per specification and direction of E/I (vide classification of soil item - B) | 226.31 | cum | 24.42 | ₹5,526.49 |
| 3 | Earth filling in foundation trenches and plinth in layers not exceeding 150 mm thick, watered, rammed fully compacted and fine dressed with earth obtained from excavation, lead up to 50 m and lift of 1.5 m; complete as per specification and direction of E/I (measurement of compacted volume). | 236.29 | cum | 87.03 | ₹20,564.32 |
| 4 | Filling in foundation trenches and plinth in layers not exceeding 150 mm thick, well watered, rammed fully compacted and fine dressed with earth obtained after cutting within a lead of 50 m and lift of 1.5 m; complete as per specification and direction of E/I (measurement of compacted volume). | 216.94 | cum | 202.9 | ₹44,017.13 |
| 5 | Providing coarse clean sand to filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes; complete as per building specification and direction of E/I (measurement of compacted volume). | 86.15 | cum | 697.24 | ₹60,067.23 |
| 6 | Providing designation 75B brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. | 50.05 | cum | 7,329.9 | ₹3,66,861.49 |
| 7 | Providing designation 75B brick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints costs of screening materials, scaffolding, raking out joints to 15mm depth curing taxes and royalty all complete as per building specification and direction of E/I. | 194.03 | cum | 7,540.58 | ₹14,63,098.74 |
| 8 | Providing and laying 125mm thick reinforced designation 75A brick work in (1:4) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including the cost of screening carriage of materials, scaffolding, raking out joints to 15mm depth, curing, taxes and royalty (but excluding the cost of reinforcement )all complete as per building specification and direction of E/I. | 91.2 | SQM | 1,038.08 | ₹94,672.9 |
| 9 | Providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20mm nominal size) | 2.97 | SQM | 6,033 | ₹17,918.01 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level. | 31.1 | cum | 5,267.12 | ₹1,63,807.43 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
Tendernotice_2.pdf
PDF • 0.65 MB
BOQ_164375.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .