Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st lowest₹3.3 LAccepted-Finance | 1st lowest | Accepted-Finance 1st lowest | |
| 2 | 2nd₹3.5 L+₹20,990.72 (6.42%)Accepted-Finance CAMP AT SHADIPUR SRI VIJAYA PURAM | 2nd | Accepted-Finance 2nd lowest |
Tender Value
₹3.5 L
EMD Value
₹6,979
Closing Date
2 Dec 2022, 11:00 amClosed
DFO FEPD
Divisional Forest Officer, Forest Extension and Publicity Division, Silva Complex Haddo Port Blair
Construction of underground water storage tank at MNGP under FEPD
2022_OFEPD_8190_1
FEPD/G-259/Vol-I/470
Open Tender
Construction Works
Works
45 days
Camp Office, Model Nursery Gandhi Park, Port Blair
Please refer tender documents
4 documents required · 4 mandatory
₹0
₹6,979
Yes
8 Dec 2022
22 Nov 2022
2 Dec 2022
22 Nov 2022
2 Dec 2022
22 Nov 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement: 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size).
Centering and shuttering including strutting, propping etc. and removal of form work for :Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size). Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.1426 Mtr x 0.888Kg = 1266.29 Kg x 20% wastage=253.26 Kg (1266.29 + 253.26= 1519.55)
12 mm cement plaster of mix :1:4 (1 cement: 4 fine sand)
Shri S K Biswas
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .