Loading…
Loading…
Tender Value
₹4.6 L
EMD Value
₹9,294
Closing Date
17 Jun 2026, 11:00 am7d left
SDO/KCSD-X
K.C.S.D.-X, KOTULPUR, BANKURA
Civil Works
2026_IWD_1026605_1
WBIW/SDO/KCSD-X/eNIT-01e/26-27
Open Tender
CIVIL WORKS
60 days
Kotulpur
Please refer to Tender Documents
4 documents required · 4 mandatory
₹9,294
Yes
9 Jun 2026
9 Jun 2026
18 Jun 2026
9 Jun 2026
17 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 0.0 | Cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 1 | Sq.m. | 2.38 | ₹2.38 | 0.0 |
| 0.0 | Water Bound Macadam Sub Base Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5 th Revision). (ii) For Construction of Sub Base by consolidating Laterite (90 mm to 45 mm):
Note: Add cost at site of 1.45 m³ of materials to arrive at the complete rate. | - | Cu.m. | 1,526.37 | - | 0.0 |
| 0.0 | Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification. Note: Add cost at site of the materials to arrive at the complete rate. The compaction factor may be taken as 0.67. (The payment is to be made on the basis of the finished compacted volume of moorum.) | 0.8 | Cu.m. | 1,146.77 | ₹917.42 | 0.0 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
Tendernotice_2.pdf
PDF • 1.15 MB
BOQ_2522023.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid