Loading…
Loading…
Tender Value
₹39.3 L
EMD Value
₹39,289
Closing Date
17 Jul 2026, 5:30 pm
Addl.C.E.O
Z.P.LATUR
ST BT TO KHOPEGAON TO KAVHA ROAD (VR-127) TQ LATUR DIST LATUR
2026_LATUR_1313627_1
ZPL/W/E-T/86/2025-26
Open Tender
Civil Works
180 days
TQ LATUR
Please refer Tender documents.
4 documents required · 4 mandatory
₹580
₹39,289
2 Jul 2026
2 Jul 2026
20 Jul 2026
2 Jul 2026
17 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | 1 | Cu.M. | - | - |
| 2 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | - | Sqm | - | - |
| 3 | Dismantling of existing B.T. Surface (flexible Pavement) to a depth of 50 mm.by cold milling with Writgen or similar type machine including loading of dismantled material by automatic conveyor belt to transport vehicle at site excluding lead charges | 1 | Sqm | - | - |
| 4 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | - | Cu.M. | - | - |
| 5 | Supplying trap/granite/quartzite /gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements)
a)80 mm Metal, By breaking Boulders (Hand broken). | - | Cu.M. | 1 | - |
| 6 | Supplying trap/granite/quartzite /gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete . (Prior approval of sample stack of broken metal by the Ex. Engineer is necessary the date of approval will form part of the measurements)
(a)40 mm Metal, By breaking Boulders (Hand broken). | 0.6 | Cu.M. | 1 | ₹0.6 |
| 7 | Supplying soft murum at the road site, including conveying and stacking complete. | 1 | Cu.M. | - | - |
| 8 | Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . | 0.6 | Cu.M. | - | - |
| 9 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | 1 | Cu.M. | - | - |
| 10 | Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete. | - | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.58 MB
Tendernotice_2.pdf
PDF • 3.48 MB
DDBELOW.pdf
Other Document • 0.08 MB
BOQ_2252742.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid