| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | L1 | Accepted-AOC found lowest one bidder | |
| 2 | L2₹11.9 L+₹1.8 L (17.3%)Rejected-Finance | L2 | Rejected-Finance quoted high rates | |
| 3 | L3₹11.9 L+₹1.8 L (17.4%)Rejected-Finance | L3 | Rejected-Finance quoted high rates | |
| 4 | L4₹16.1 L+₹6.0 L (59.7%)Rejected-Finance | L4 | Rejected-Finance quoted high rates | |
| 5 | L5₹16.7 L+₹6.6 L (65.2%)Rejected-Finance | L5 | Rejected-Finance quoted high rates |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
26 Feb 2021, 2:00 pmClosed
Executive Engineer
Rural Engineering Wing Leh
Const.of earthen green house having polycarbonates sheet on south west side (100x28) vegetable farm at Sumoor.
2021_RDD_2349_2
NIT 190 UTLeh REW of 2020-21
Open Tender
Civil Works - Others
Item Rate
120 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
Executive Engineer
₹24,000
Yes
5 Jul 2021
20 Feb 2021
1 Mar 2021
20 Feb 2021
26 Feb 2021
20 Feb 2021
Amount
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
Random Rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1 :6:12 ( 1 Cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with cement mortar 1:6 (1 Cement: 6 coarse sand)
Providing and laying damp-proof course 50 rnm thick with cement concrete 1:2:4 (1 cement : 2 co.:Hse sand 4 graded stone aggregate 20mm nominal size Crushed
sun dried brick masonary laid in mud mortor incl cost of brick
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately):Second class kail wood
Providing and fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centring, shuttering and complete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size)
Steel work in built up tubular round, square or rectangular including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer including welding and bolting with special shaped washers etc.completeHot finished welded type tubes
providing and fixing local for roofy incl placing complete job
providing and laying 12mm thick water proofing board for roofing and 100mm thick mud phuska with polythene sheet complete job
15mm Cement plaster on the rough side of single or half brick wall of mix1 : 4 ( 1 cement : 4 coarse sand)
providing and fixing polycarbonated 3 layer sheet incl placing in position complete job
carriage of stone from an average lead upto 5 km by M.T
carriage of cement from an average lead upto 130 km by M.T
carriage of sand bajree from an average lead upto 20 km by M.T
Valley Engineering Works
M/S MOTUP WANGIAL
M/S PHUNTSOG RAFSTAN
M/S TSERING WANGAIL GOVT CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .