Loading…
Loading…
Tender ID
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹11.0 L+₹59,782.84 (5.72%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹11.7 L+₹1.2 L (11.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹12.0 L+₹1.6 L (14.9%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹12.4 L+₹2.0 L (18.7%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹19.8 L
EMD Value
₹39,600
Closing Date
16 Feb 2026, 4:00 pmClosed
Executive Engineer PWD(RandB) Division Satwari
ffice of the Executive Engineer PWD(RandB) Division Satwari
Road from bodrdrank to kukerian via bhagatpur sandwan and allied links.
2026_PWDJK_301353_7
Short e-NIT No. 102 of 2025-26 Dated 24-01-2026
Open Tender
Civil Works
Percentage
30 days
Marh
As per eNIT
2 documents required · 2 mandatory
₹600
Executive Engineer PWD(RandB) Division Satwari
₹39,600
Satwari
2 Mar 2026
24 Jan 2026
17 Feb 2026
24 Jan 2026
16 Feb 2026
24 Jan 2026
27 Jan 2026
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge in all kinds of soil
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 aggregate 40mm nominal size
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Hot rolled deformed bars
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases for columns etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platforms.
Centering and shuttering including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls
Carriage of sand within an avg. lead 10 KM MT
Carriage of Stone Aggregate within an avg. lead 10 KM MT
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_977807.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .