| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st Lowest₹3.4 LAccepted-Finance FLAT 1 HIT SCHEME NO II BLOCK 2 TYPE IV ICHAPUR HOWRAH WEST BENGAL 711101 | HOWRAH | HOWRAH | WEST BENGAL | 711101 | ₹3.4 L | 1st Lowest | Accepted-Finance 1st Lowest |
| 2 | 2nd Lowest₹3.4 L+₹1,014.90 (0.30%)Rejected-Finance BAHIRTAFA JADURBERIA ULUBERIA HOWRAH 711316 | HOWRAH | HOWRAH | WEST BENGAL | 711101 | ₹3.4 L+₹1,014.90 (0.30%) | 2nd Lowest | Rejected-Finance 2nd Lowest |
| 3 | 3rd Lowest₹3.4 L+₹6,089.42 (1.81%)Rejected-Finance 295 3 2 NETAJI SUBHASH ROAD HOWRAH 711101 | HOWRAH | HOWRAH | WEST BENGAL | 711101 | ₹3.4 L+₹6,089.42 (1.81%) | 3rd Lowest | Rejected-Finance 3rd Lowest |
Tender Value
₹3.4 L
EMD Value
₹6,766
Closing Date
3 Aug 2026, 11:00 amClosed
The Assistant Engineer Uluberia Sub Div,PHE Dte
BAGNAN, KHADINAN, HOWRAH
Road restoration work at Barikpara, Bhunyapara near Chand Sporting Club Additional Laying of HDPE pipe line of Surikhali PWSS of Uluberia-II Block under Uluberia Sub-Division, under Howrah Division, P.H.E. Dte.
2026_PHED_1032803_4
WBPHED/AE/USD/NIET-02 OF 2026-2027
Open Tender
CIVIL WORKS
Percentage
30 days
Bagnan, Khadinan
Please refer Tender documents.
6 documents required · 6 mandatory
₹6,766
6 Aug 2026
20 Jul 2026
5 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | 54.1 | cum | 119.27 | ₹6,452.51 |
| 2 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 32.5 | cum | 711.81 | ₹23,133.82 |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 216.4 | Sq.m | 357 | ₹77,254.8 |
| 4 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 27 | Sq.m | 722 | ₹19,494 |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
a) Pakur Variety | 15.01 | cum | 6,046.83 | ₹90,762.92 |
| 6 | Supplying HDPE (Materials grade PE-100) pipes conforming to IS 4984- 1995 with latest revision & amendments if any with necessary HDPE specials (excluding cost of CIDF valves) including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder,road sub-grade and aits flank but excluding moorum laterite or sand stone / hard rock cutting with chisel required including cutting road flank/ brick pavement etc. without damaging the exisiting telephone/electrical cable line etc.(in case of damage of any type of cable line by the agency at the time of execution necessary damage charge as applicable by the respective authority will have to be brone by the agency at his own cost)upto the depth (av.) so as to maintain 1.10m.earth cushion from top of the pipe upto G.L. including loading unloading carrying lowering laying fitting fixing carefully pipes, valves and specials with the all types of jointing materials in trenches maintaining proper levels and alignment jointing the pipes and specials by butt welding/ adopting suitable method (But weld jointing with help of hydraulic tack and trimming machines, Hitter etc. for reaching at necessary melting point of HDPE pipe so that joint can be monolithic) so as to facilitate the maintenance of pipe line locally as per conventional method in future.(A) Pressure Rating : PN 6 (ii) Laying of pipe line including cost of pipe & fittings/ specials but excluding cost of valves.b) 75mm ( OD ) | 198 | Mtr. | 252 | ₹49,896 |
| 6.01 | c) 75mm ( OD ) | 48 | Mtr. | 331 | ₹15,888 |
| 7 | Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3, if contractor used water from deptt. source).B) For UPVC/HDPE Pipe b) 75mm ( OD ) | 198 | Mtr. | 3.15 | ₹623.7 |
| 7.01 | c) 90mm ( OD ) | 48 | Mtr. | 3.6 | ₹172.8 |
| 8 | Cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the same pipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/Itrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor) (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source).B) For UPVC/HDPE Pipe b) 75mm ( OD ) | 198 | Mtr. | 0.69 | ₹136.62 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
SpecificationConstBuilding.pdf
Tender Documents • 0.17 MB
ImportantDocuments.pdf
Tender Documents • 0.15 MB
BOQ_2536509.xls
BOQ • 0.31 MB
WBF2911.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .