Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 LAccepted-AOC | ₹20.4 L | L1 | Accepted-AOC Tender Finalized |
| 2 | L2₹20.6 LRejected-Finance | ₹20.6 L | L2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | Subbiah L1 | Ponraj L2 |
|---|---|---|---|---|---|
| 1.00Construction of Retaining wall | |||||
| 1.01 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 232.5 | Cum | 197.6 ₹45,942 | 207 ₹48,127.50 |
| 1.02 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 23.25 | Cum | 5,297 ₹1.2 L | 5,297 ₹1.2 L |
| 1.03 | Supply and errecting centring including all cost and conveyence and all labour charges for sides.etc complete | 651 | Sqm | 365 ₹2.4 L | 385 ₹2.5 L |
| 1.04 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum | 292.95 | Cum | 5,567 ₹16.3 L | 5,587 ₹16.4 L |
| 1.05 | Provision of weep hole arrangement | 24 | Rm | 192 ₹4,608 | 202 ₹4,848 |
Tender Value
₹24.4 L
Closing Date
11 Mar 2026, 5:00 pmClosed
Panchayat Office, Kasthurirengapuram
Panchayat Office, Kasthurirengapuram
Construction of Retaining Wall at Palavoor Esakkiammankovil West Side to Ponnathi OHT in Kasthurirengapuram Panchayat
2026_RDTN_671828_2
Kasthurirengapuram Mines-1
Open Tender
Civil Works
Panchayat Office, Kasthurirengapuram
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
13 Mar 2026
10 Mar 2026
11 Mar 2026
10 Mar 2026
11 Mar 2026
10 Mar 2026
Construction of Retaining wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supply and errecting centring including all cost and conveyence and all labour charges for sides.etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Provision of weep hole arrangement
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_808522.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_808522.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid