Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.0 LAccepted-AOC | 1 | Accepted-AOC L-1 | |
| 2 | 2₹10.9 L+₹90,656 (9.09%)Rejected-AOC | 2 | Rejected-AOC L-2 | |
| 3 | 3₹10.9 L+₹92,844 (9.31%)Rejected-AOC | 3 | Rejected-AOC L-3 | |
| 4 | 4₹11.0 L+₹1.1 L (10.7%)Rejected-AOC | 4 | Rejected-AOC L-4 | |
| 5 | 5₹11.8 L+₹1.8 L (18.5%)Rejected-AOC 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | 5 | Rejected-AOC L-5 |
Tender Value
₹13.8 L
EMD Value
₹14,000
Closing Date
10 Nov 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
ETC-II, UPPTCL, PARESHAN BHAWAN, VIBHUTI KHAND, GOMTI NAGAR, LUCKNOW-226010
WORK
2020_UPTCL_527567_1
SHORT TERM E-TENDER NO. ETC-II/L/57/2020-21
Open Tender
Electrical Works
Item Rate
60 days
SAROJININAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
SE, ETC-II, UPPTCL, LUCKNOW
₹14,000
19 Jul 2021
4 Nov 2020
11 Nov 2020
4 Nov 2020
10 Nov 2020
4 Nov 2020
120 days
Amount
Dismantling & shifting of old 200 MVA Tr. RTCC Panel including disconnection of Earthing & Control Cables with identification and shifting to storage place.
Drain out of the complete Transformer oil of 200 MVA T/F from Radiators, Conservator & Main Tank in 209 Ltrs. Capacity Oil drums and their shifting to storage place.
Dismantling of Water and Air pipe lines of Mulsifire system of 200 MVA T/F and shifting to storage place including proper stacking.
Safe dismantling of accessories/ mountings of old 200 MVA T/F after removal of earthing & opening of cable connections including HV, MV & LV Bushings,Turrets, Radiators, Conservator tank, oil pipe lines, Marshaling box, Tap Changer panel, etc. and proper blanking of all openings using proper size Gaskets along with nuts & bolts to complete the job satisfactorily including proper stacking at storage place with all cost of Gaskets, Nut & Bolts, T&P,Crane etc.
Shifting of Main tank of damaged 200 MVA T/F (Aditya make) from plinth to Storage place including necessary turning as needed:
a) Upto 20 Mtrs distance
b) Additional shifting of 20 Mtrs. ( each 5 Meter per job)
Shifting of Main tank of New 200 MVA T/F (BHEL make) on plinth from Storage place upto 20 Mtr. distance
Safe carriage of 50 kL & 20 kL Oil Storage Tanks for Centrifuging of New Tr. Oil from Storage place at 400 kV to Site at 220 kV Switcyard. ( To & fro, 1 Job each)
Providing of Dry Air at the time opening of blanking plate for erection/ inspection of 200 MVA Transformer main tank and filling of Dry Air of dew point -50°C or better for completion of Work. The work shall include connecting pipe as required and measuring of Dew Point values of Dry Air.
Complete safe erection of new 200 MVA T/F (BHEL make) including all Bushings, their turrets, Radiators, Conservator Tank, connecting oil pipe lines, Tap changer, Marshalling Box and associated pipe line etc. to complete the job satisfactorily and flushing of the Radiator Banks using Hot prepared Oil along with attending the oil leakage if any for satisfactory completion of work.
Complete evacuation of 200 MVA Transformer Main tank and providing & filling of Dry N2 of dew point -50°C or better in vacuum up to pressure of 0.25 Kg/Cm² and then again evacuating the Transformer tank after required time interval (approx. 24/48 Hrs.) using centrifuging machine. The work shall include connecting pipe of machine as required and measuring Dew Point values of Dry Nitrogen before & after every cycle till the required value is achieved. (01 Job for each cycle)
Creating complete vacuum inside the 200 MVA transformer tank & stand test upto 24 Hrs. before filling the oil step by step in 200 MVA T/F.
Filling approx. 70 KL T/F new oil in 50 kL / 20 oil tankers from 209 Ltr. drums using centrifuging machine for increasing the BDV value before filling in 200 MVA T/F including shifting of Oil drums from storage place to & fro.
Hot Oil Circulation of approx. 70 KL T/F oil of 200 MVA T/F in Main Tank, Radiators or Oil Tanker by connecting 12 KLPH Centrifuging Machine with New Filters for dehydration of OIl, Windings etc. and taking & recording BDV values of oil and IR values of transformer windings periodically till the required value is reached including filling & Topping up of oil in Main Tank, Radiators, Conservator Tank, OLTCs etc. as per direction of Supervising Engineer/ standard practices.
Fresh earthing with 75x10/50x6mm M.S flat of 200 MVA T/F body at two points, and of neutral bushing of T/F including painting by green paint in two coats (Flat shall be arrange by the Department.)
Connection & necessary addition laying of control cables including termination in between Turrets, WTI, OTI, Buchholz relays, PRV, Cooling fans,Oil pumps, OLTC, Marshaling box etc with proper ferruling as per drawing/ site requirement.
Erection of New 200 MVA Tr. RTCC Panel including Earthing & connection of existing Control Cables already identified along with shifting from storage place.
Connecting of jumpers of 220 kV &132 kV side Transformer Bushings of 200 MVA T/F with Jack Bus/ LAs using different type connectors and clamps/PG clamps etc.and all other associated works to complete the job.
Pre-erection testing of Transformer Bushings, Turret CTs and other accessories with Standard Testing Equipments with valid calibration certificates. Following tests are to be done- 1. Tan-delta and capacitance measurement at standard as well as variable freuencies of 03 Nos. HV, 03 Nos. IV and 03 Nos. LV Bushings. (Using Omicron/ Megger Kit) 2. Insulation resistance, Continuity, Polarity, CT ratio and Knee point voltage measurement of all the Turret CTs. Test reports are to be compiled and submitted in required format as per the satisfaction of competent authority.
Pre-commissioning testing of Transformer Windings, Bushings, Turret CTs and other accessories including LV Testing of Transformer with Standard Testing Equipments with valid calibration certificates. Following tests are to be completed- a. Tan-delta and capacitance measurement at standard as well as variable freuencies of 03 Nos. HV, 03 Nos. IV and 03 Nos. LV Bushings. (Using Omicron/ Megger Kit). b. LV testing of transformer including magnetisation current test, magnetic balance test, measurement of winding resistance (Omicron Kit), vector group, insulation resistance mesurement, core insulation test, voltage ratio test, short circuit test, open ciruit test. Test reports are to be compiled and submitted in required format as per the satisfaction of competent authority.
Sampling and testing of transformer oil at CPRI or any other NABL accredited testing lab including cost of transportation of samples in standard sampling bottles (adequate number of bottles to be arranged by contractor). Samples to be taken at following intervals (as per actual requirement)- 1. Before filling in transformer main tank & OLTCs - 02 samples . 2. Before charging - 05 samples from top and bottom of Main tank, R, Y & B Phase OLTC respectively. Following tests are to be conducted for each sample- 1. Breakdown voltage 2. Moisture Content, 3. Tan Delta of Oil, 4. Resistivity, 5. Interfacial Tension, 6. Particle Count, 7. Dissolved Gas Analysis.
Safe packing & stacking along with shifting of 220 KV, 132 KV & 11 KV Bushings of Dismantled T/F, Turrets, Radiators, Cooling Fans, Pumps etc. to store place including with all cost of packing Materials, Crane, Vehicle etc.
Ajanta Engineering works
Preeti Enterprises
Omurmila Constructions
Katyani Construction Co.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .