Executive Engineer TED
OFFICE OF THE EXECUTIVE ENGINEER TAKDAH ENGINEERING DIVISION 6TH MILE NAYA BUSTY, DARJEELING
Package 2 Recovery and reconstruction of road at Different location at Takdah Glenburn Samasty under Takdah Engineering Division, GTA.
2026_GTA_995554_2
GTA/EE/TED/NIeT-15(1st Call)/e-Tender/2025-26
Open Tender
CIVIL WORKS
Percentage
270 days
Takdah
As per NieT
4 documents required · 4 mandatory
₹0
₹4.3 L
Yes
4 Jun 2026
29 Jan 2026
23 Feb 2026
29 Jan 2026
19 Feb 2026
29 Jan 2026
(A) REOVERY AND RECONSTRUCTION OF ROAD AT YANKU DABAIPANI UNDER TAKDAH ENGINEERING DIVISION Earth work in excavation of foundation trenches or drains,in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches,levelling, dressing and ramming the bottom,bailing out water as required complete.(b) Depth of excavation dditional depth beyond 1500 mm and up to 3000mm but not requiring shoring.
Labour for laying 150 mm to 200 mm boulder soling including rough `-- Do -- -- Do - without rolling but including ramming.
Cost of Stone Boulder 150 mm of N. Bengal variety delivered and stack at site
Plum concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150mm and above,placed in position as directed excluding shuttering if any.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-Charge
Providing and laying of Filter media with granular materials / stone crushed aggregates / brick aggregates / river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to all complete.
Providing weep hole (100mm) A.C. in walls including packing brick bats or boulder of approved quality and size at the backsides of walls etc all complete.
(B) REOVERY AND RECONSTRUCTION OF ROAD AT SINGRITAM VIR GAON UNDER TAKDAH ENGINEERING DIVISION Earth work in excavation of foundation trenches or drains,in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom,bailing out water as required complete .(b) Depth of excavation dditional depth beyond 1500 mm and up to 3000mm but not requiring shoring.
Labour for laying 150 mm to 200 mm boulder soling including rough `-- Do -- -- Do - without rolling but including ramming.
Cost of Stone Boulder 150 mm of N. Bengal variety delivered and stack at site
Plum concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150mm and above,placed in position as directed excluding shuttering if any.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-Charge
Providing and laying of Filter media with granular materials / stone crushed aggregates / brick aggregates / river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to all complete.
Providing weep hole (100mm) A.C. in walls including packing brick bats or boulder of approved quality and size at the backsides of walls etc all complete.
(C) REOVERY AND RECONSTRUCTION OF ROAD FROM GLERNBURN TO SINGRITAM KARKI DHURA GAON LENGTH 1.5KM UNDER TAKDAH ENGINEERING DIVISION Earth work in excavation of foundation trenches or drains,in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom,bailing out water as required complete .(b) Depth of excavation dditional depth beyond 1500 mm and up to 3000mm but not requiring shoring.
Labour for laying 150 mm to 200 mm boulder soling including rough `-- Do -- -- Do - without rolling but including ramming.
Cost of Stone Boulder 150 mm of N. Bengal variety delivered and stack at site
Plum concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150mm and above,placed in position as directed excluding shuttering if any.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-Charge
Providing and laying of Filter media with granular materials / stone crushed aggregates / brick aggregates / river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to all complete.
Providing weep hole (100mm) A.C. in walls including packing brick bats or boulder of approved quality and size at the backsides of walls etc all complete.
(D) REOVERY AND RECONSTRUCTION OF MINERAL SPRING YANKS ROAD UNDER TAKDAH ENGINEERING DIVISION Earth work in excavation of foundation trenches or drains,in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom,bailing out water as required complete .(b) Depth of excavation dditional depth beyond 1500 mm and up to 3000mm but not requiring shoring.
Labour for laying 150 mm to 200 mm boulder soling including rough `-- Do -- -- Do - without rolling but including ramming.
Cost of Stone Boulder 150 mm of N. Bengal variety delivered and stack at site
Plum concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150mm and above,placed in position as directed excluding shuttering if any.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-Charge
Providing and laying of Filter media with granular materials / stone crushed aggregates / brick aggregates / river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to all complete.
Providing weep hole (100mm) A.C. in walls including packing brick bats or boulder of approved quality and size at the backsides of walls etc all complete.
(E) REOVERY AND RECONSTRUCTION OF ROAD FROM GLERNBURN FATAK TO SIKARI DHURA LENGTH 2.5KM UNDER TAKDAH ENGINEERING DIVISION Surface finish work Earth work in excavation of foundation trenches or drains,in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom,bailing out water as required complete .(b) Depth of excavation dditional depth beyond 1500 mm and up to 3000mm but not requiring shoring.
Labour for laying 150 mm to 200 mm boulder soling including rough `-- Do -- -- Do - without rolling but including ramming.
Cost of Stone Boulder 150 mm of N. Bengal variety delivered and stack at site
Plum concrete work with 40% cement concrete with 30 mm down graded stone metal and 60% stone boulder of size 150mm and above,placed in position as directed excluding shuttering if any.
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-in-Charge
Providing and laying of Filter media with granular materials / stone crushed aggregates / brick aggregates / river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to all complete.
Providing weep hole (100mm) A.C. in walls including packing brick bats or boulder of approved quality and size at the backsides of walls etc all complete.
CROSS DRINAGE WORKS Earthwork in excavation for foundation of structures as per technical specification including setting out removing spreading or stacking spoils with in a lead of 150 m as directed and including trimming the sides of trenches ..all complete as per direction of E-I-C.
Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
Hire & Labour charges all complete for slab of culvert and cross drain upto 3 mtr. Clear span ……….. Etc.
Providing formwork and staging including Hire & Labour charges for the same as required for foundation concrete works of. For walls, parapets etc
Providing formwork and staging including Hire & Labour charges for abutment and its components, retaining wall height up to 3 mtr.
Providing and laying Design Mix concrete for reinforced work in any part of bridge…..all complete. M-25Design Mix
Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications.
Plum Concrete work with cement concrete(1:3:6) with 30mm down graded stone metal 40% and stone boulders of size 150mm above placed in position as directed excluding shuttering
Plaster with sand & cement motar including rounding of corners or chamfering corners as directed and including raking out joints 15mm th.plaster in 4:1 cement motar
Providing and laying of Filter media with granular materials/stone crushed aggregates/brick aggregates /river bed materials satisfying the requirements laid down in clause 2504.2.2 of MoRT&H Specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
Providing weep hole (150 X 75mm) in walls including packing brick bats or boulder of approved quality and sizeat the backsides
Add 18 % GST
Add 1 % Laboaur Cess
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.70 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.19 MB
TenderForm2.pdf
Tender Documents • 0.94 MB
BOQ_2436240.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .