Tender Value
₹3.6 Cr
EMD Value
₹5.4 L
Closing Date
22 Jul 2025, 10:30 pmClosed
Bengaluru Water Supply And Sewerage Board
Work of P&L 1400mm dia RCC NP-3 sewer pipe line from Saraswathi Vidyanikethan School, Jai Maruthinagar to 6th A main, JC Nagar, Kurubarahalli (near Sandeep bar) inside SWD-V202 further linked to Mailasandra STP.(3rd Call)
BWSSB/2024-25/WS/WORK_INDENT1308/CALL-3
BWSSB/2024-25/WS/WORK_INDENT1308/CALL-3
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
BWSSB Chief Engineer WWM West Bengaluru
₹5,000
₹5.4 L
24 Jun 2025
24 Jun 2025
23 Jul 2025
11 Jul 2025
11 Jul 2025
Work of P&L 1400mm dia RCC NP-3 sewer pipe line from Saraswathi Vidyanikethan School, Jai Maruthinagar to 6th A main, JC Nagar, Kurubarahalli (near Sandeep bar) inside SWD-V202 further linked to Mailasandra STP.
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever nec...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricadin...
Depth exceeding 1.5 m, but not exceeding 3 m
Earth work excavation for pipeline trenches by mechanical means as per
drawing and technical specifications, including setting out, construction
of shoring, strutting, barricading, caution lights, b...
Depth exceeding 1.5 m, but not exceeding 3 m
Earth work excavation for pipeline trenches by mechanical means as per
drawing and technical specification, including setting out, construction of
shoring, strutting, cost of blasting materials, bar...
Depth exceeding 1.5 m, but not exceeding 3 m
Excavation of Hard Rock by diamond rope cutting method using diamond rope,line draw machine,making holes by drilling machine for breaking the block by means of hydraulic breakers/splitters without a...
Providing and installing sheet piling for both sides of the trenches for following depths with mild steel sheets of not less than 6.5mm thick, stronger knife edge, recessed spreader sockets, 3 inch si...
Providing and Filling in foundation with granite / trap broken metal 100mm and down size with approved M-Sand including hand packing, ramming, watering including cost of all materials and labour with ...
Supplying S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work sit...
RCC NP3 Class pipe of 300mm dia.
Excavating of ramming/jacking/driving pit and receiving pit of size
5.00m(length) x 3.00m (breadth), up to 6.00 m depth in all soil strata
including shoring and strutting including cutting of Asphal...
Installation of product pipe by manual jacking method - Manufactur ing, providing, transporting, rolling, lowering, laying & jointing, testing, commissioning of ERW (Electric Resistance Welded), SAW (...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50m, and lift upto 1.5m i...
Spreading of Stone Dust : Supplying and providing stone dust in the station yard or wherever required including watering, ramming, consolidating and dressing. The rate includes the cost of material, l...
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever nec...
Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Additionalities for Formwork
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu/Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading, dang...
For Every 0.1m depth 2.00 to 3.00m
Constructing Pre-cast RCC Machinehole 1.8 m internal dia. , 3.0M depth
& SFRC cover & fram
For Every 0.1m depth 3.00 to 4.00m
Constructing Pre-cast RCC Machinehole 1.8 m internal dia. , 4.0M depth
& SFRC cover & fram
Dismantling the damaged or collapsed Machinehole ,conical in shape, and reconstructing the same for the same dimensions, with machine made wire cut brick in CM 1:4 with ordinary portland cement etc. a...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
Providing, filling and laying of sand bags filled with sand / clay for diversion of sewage during execution of work.
Dewatering the sewage / storm water by using reqired HP submersible pump for the diversion of storm / sewage during the execution of work. Considering for one Pump.10 hp pump
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .