Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | -35.90% | ₹2.2 L | L1 | Admitted-Finance |
| 2 | L2₹2.4 L+₹10,894.15 (4.85%)Admitted-Finance | -32.79% | ₹2.4 L+₹10,894.15 (4.85%) | L2 | Admitted-Finance |
| 3 | L3₹2.6 L+₹35,029.42 (15.6%)Admitted-Finance | -25.90% | ₹2.6 L+₹35,029.42 (15.6%) | L3 | Admitted-Finance |
| 4 | L4₹2.7 L+₹48,725.92 (21.7%)Admitted-Finance | -21.99% | ₹2.7 L+₹48,725.92 (21.7%) | L4 | Admitted-Finance |
| 5 | L5₹3.0 L+₹73,211.49 (32.6%)Admitted-Finance | -15.00% | ₹3.0 L+₹73,211.49 (32.6%) | L5 | Admitted-Finance |
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
17 Aug 2026, 6:00 pmClosed
XEN Hyd Division Gandoh
XEN Hyd Division Gandoh
construction of zonal tank at Gwaloo NHO Mool Raj Gowari Pyt Shingini with HDPE pipes under District Capex Budge 2026-27 (JKSSR 2022
2026_PHE_320224_6
e NIT 02 of 2026-27
Open Tender
Civil Works
Percentage
XEN Hyd Division Gandoh
construction of zonal tank at Gwaloo NHO Mool Raj Gowari Pyt Shingini with HDPE pipes under District Capex Budge 2026-27 (JKSSR 2022
2 documents required · 2 mandatory
₹500
Yes
Xen Hyd Division Gandoh
₹7,000
Yes
21 Aug 2026
10 Aug 2026
18 Aug 2026
10 Aug 2026
17 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/work in excavation in 70% all kind of soil and 30% ordinary rock | 121 | Cum | 612.95 | ₹74,166.95 |
| 2 | Providing and laying in position cement concrete in 1:4:8 mix with 20mm nominal size of aggregate | 1.96 | Cum | 5,202.9 | ₹10,197.68 |
| 3 | Providing and laying in position cement concrete in 1:1.5:3 mix for Bed Fillets | 1.6 | Cum | 7,788.4 | ₹12,461.44 |
| 4 | Providing and laying in position cement concrete in 1:1.5:3 mix for Walls | 7.7 | Cum | 9,395.7 | ₹72,346.89 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 mix | 0.91 | Cum | 9,821.85 | ₹8,937.88 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars | 201 | kg | 123.2 | ₹24,763.2 |
| 7 | 12mm thick cement sand plaster in 1:4 mix | 38 | Sqm | 353.1 | ₹13,417.8 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for ; Under 20 cm wide section edges | 9.2 | Meter | 262.15 | ₹2,411.78 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for ; walls | 38 | Meter | 628.95 | ₹23,900.1 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for ; Slab | 6.25 | Meter | 718.2 | ₹4,488.75 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_1063823.xls
BOQ • 0.34 MB
corringedum.pdf
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .