Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC B 313 CHINAR WOODLAND CHUNA BHATTI KOLAR ROAD BHOPAL | BHOPAL | BHOPAL | MADHYA PRADESH | ₹5.8 L | L1 | Accepted-AOC Accepted due to being lowest rate. |
| 2 | L2₹6.2 L+₹35,740.14 (6.16%)Rejected-Finance EWS 236 RUSALLI HOUSING BOARD COLONY KAROND BHOPAL | BHOPAL | BHOPAL | MADHYA PRADESH | ₹6.2 L+₹35,740.14 (6.16%) | L2 | Rejected-Finance Rate quoted more than L1. |
| 3 | L3₹6.2 L+₹44,161.66 (7.61%)Rejected-Finance | ₹6.2 L+₹44,161.66 (7.61%) | L3 | Rejected-Finance Rate quoted more than L1. |
| 4 | L4₹6.3 L+₹51,419.24 (8.86%)Rejected-Finance 84 C SECTOR ZIYA COLONY KAROD BHOPAL | BHOPAL | BHOPAL | MADHYA PRADESH | ₹6.3 L+₹51,419.24 (8.86%) | L4 | Rejected-Finance Rate quoted more than L1. |
| 5 | L5₹6.7 L+₹87,364.78 (15.0%)Rejected-Finance A 12 AASRA AVENUE KAMLA NAGAR PIPLANI BHOPAL 462022 | BHOPAL | BHOPAL | MADHYA PRADESH | 462022 | ₹6.7 L+₹87,364.78 (15.0%) | L5 | Rejected-Finance Rate quoted more than L1. |
Tender Value
₹6.8 L
EMD Value
₹13,694
Closing Date
18 Oct 2022, 5:30 pmClosed
EXECUTIVE ENGINEER
Executive Engineer PWD E/M, Division No. 1, Shed No. 11A Bara Dafater Jawahar Chowk Bhopal
For Comprehensive Maintenance and Operation of 1 Nos D.G Set (160 KVA) (Crompton Greeves) and AMF Panel for One Year at TB Hopsital Eid Gha Hills Bhopal.
2022_PWDRB_224755_1
51/TS/2022-2023 E/M/Bpl/e-tendering (1st Call)
Open Tender
Electrical Works
Percentage
365 days
Bhopal
As Per Tender Document
10 documents required · 10 mandatory
₹2,000
₹13,694
9 Dec 2022
30 Sept 2022
20 Oct 2022
30 Sept 2022
18 Oct 2022
30 Sept 2022
eProcurement System Government of Madhya Pradesh Created By: Aby George Created Date/Time: 02-Nov-2022 01:24 PM Tender Title: For Comprehensive Maintenance and Operation of 1 Nos D.G Set 1st Call. P. A. C. 684677.00 Non SOR, Completion period 365 Days (i/c rainy season) Tender ID: 2022_PWDRB_224755_1
Tender Inviting Authority : EXECUTIVE ENGINEER P.W.D. (E/M) DIVISION NO. 1, BHOPAL
Name of Work : For Comprehensive Maintenance and Operation of 1 Nos D.G Set (160 KVA) (Crompton Greeves) and AMF Panel for One Year at TB Hopsital Eid Gha Hills Bhopal. 1st Call. P. A. C. 684677.00 Non SOR, Completion period 365 Days (i/c rainy season)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 DUSHYANT SHUKLA(GSTN-23BNXPS5665J1Z2) 684677.00 -15.21 580537.63 Five Lakh Eighty Thousand Five Hundred and Thirty Seven
2.00 FAEEM MOHD SEIKH(GSTN-23ATCPM0311R1ZT) 684677.00 -7.70 631956.87 Six Lakh Thirty One Thousand Nine Hundred and Fifty Six
3.00 CONDUCTIVITY ENGINEEARS(GSTN-23ACIPB3550C1ZD) 684677.00 -8.76 624699.29 Six Lakh Twenty Four Thousand Six Hundred and Ninty Nine
4.00 RAHMAN KHAN(GSTN-23BJKPK3608NIZ0) 684677.00 -9.99 616277.77 Six Lakh Sixteen Thousand Two Hundred and Seventy Seven
5.00 M/S Abhishek Electrical Works(GSTN-NA) 684677.00 -2.45 667902.41 Six Lakh Sixty Seven Thousand Nine Hundred and Two
Lowest Amount Quoted BY: DUSHYANT SHUKLA(580537.63)
BOQ Summary Details Tender Title: For Comprehensive Maintenance and Operation of 1 Nos D.G Set 1st Call. P. A. C. 684677.00 Non SOR, Completion period 365 Days (i/c rainy season) Tender ID: 2022_PWDRB_224755_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 DUSHYANT SHUKLA 580537.63 L1
2 RAHMAN KHAN 616277.77 L2
3 CONDUCTIVITY ENGINEEARS 624699.29 L3
4 FAEEM MOHD SEIKH 631956.87 L4
5 M/S Abhishek Electrical Works 667902.41 L5
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .