| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAccepted-AOC | ₹26.1 L Quoted ₹26.7 L | L1 | Accepted-AOC LOWEST |
| 2 | L2₹28.3 LRejected-AOC AT VINDHANE POST DIGHODE TAL PANVEL DIST RAIGAD | RAIGAD | MAHARASHTRA | ₹28.3 L | L2 | Rejected-AOC Other than lowest |
| Sl No | Description | Qty | Unit | ESS KAY BUILDER L1 | Sai Construction Co. L2 |
|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster of any thickness from wall's/ceiling including raking out joints hacking for key scrubbing down with water and dispose off debries out side the premises where directed complete. | 420 | Square meter | 48 ₹20,160 | 40 ₹16,800 |
| 2.00 | Material and labour 12 mm thick rendering on fair faces of brick work or concrete surfaces in cement mortar 1:6, finsihed the surfaces even and fair without using extra cement. | 100 | Square meter | 180 ₹18,000 | 200 ₹20,000 |
| 3.00 | Material and labour 15mm thick rendering on fair faces of brick work or concrete surfaces in cement mortar 1:4, finishing the surface fair and even with water proofing compound complete all as specified and directed.(Note water proofing compound will be measured and paid separately) | 300 | Square meter | 140 ₹42,000 | 210 ₹63,000 |
| 4.00 | Material and labour 5mm thick rendering on concrete surfaces in cement mortar 1:3 , as in ceiling, finsihed the surfaces even and smooth without using extra cement complete all as specified and directed. | 20 | Square meter | 190 ₹3,800 | 200 ₹4,000 |
| 5.00 | Material and labour for Preparing of new plastered surface and applying two coats cement base paints on walls complete as specified | 150 | Square meter | 50 ₹7,500 | 40 ₹6,000 |
| 6.00 | Material & Labour for preparation of newly plastered wall surface and applying two coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and exterior paint of required shade @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm complete. | 150 | Square meter | 60 ₹9,000 | 100 ₹15,000 |
| 7.00 | Material and Labour for preparation of newly plastered surfaces over 2mm wall care putty to make surface smooth and applying two coats of oil bound distemper on walls all as specified. | 50 | Square meter | 60 ₹3,000 | 60 ₹3,000 |
| 8.00 | Material & Labour for preparation of newly plastered wall surface and applying two cotas of Acrylic Smooth exterior paint of required shade,applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primerapplied @ 2.20 kg/10 sqm complete. | 50 | Square meter | 80 ₹4,000 | 90 ₹4,500 |
| 9.00 | Material and Labour for preparation of new plastered surfaces and applying three coats of white wash on ceiling complete all as specified. | 20 | Square meter | 25 ₹500 | 12 ₹240 |
| 10.00 | Material and labour preparing old decorated plastered/unplastered wall surfaces including cornices by brooming down with steel wire brushes and scraping down smokes, spots etc applying one coat of oil bound distemper over 3mm wall care putty to make surface smooth complete. | 500 | Square meter | 36 ₹18,000 | 40 ₹20,000 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
4 May 2026, 6:00 pmClosed
GE Amritsar
Garrison Engineer Amritsar Cantt PIN-143001
CERTAIN REPAIR TO CENTRAL INSTITUTES UNDER AGE B/R-II AT AMRITSAR CANTT
2026_MES_758256_1
GE/ASR-13/2026-27
Open Tender
Civil Works
180 days
GE Amritsar
Class D category a i
8 documents required · 8 mandatory
₹500
GE Amritsar
₹60,000
2 Jul 2026
28 Mar 2026
11 May 2026
28 Mar 2026
4 May 2026
20 Apr 2026
28 Mar 2026 - 4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Taking down cement plaster of any thickness from wall's/ceiling including raking out joints hacking for key scrubbing down with water and dispose off debries out side the premises where directed complete. | - | Square meter | - | - |
| - | Material and labour 12 mm thick rendering on fair faces of brick work or concrete surfaces in cement mortar 1:6, finsihed the surfaces even and fair without using extra cement. | - | Square meter | - | - |
| - | Material and labour 15mm thick rendering on fair faces of brick work or concrete surfaces in cement mortar 1:4, finishing the surface fair and even with water proofing compound complete all as specified and directed.(Note water proofing compound will be measured and paid separately) | - | Square meter | - | - |
| - | Material and labour 5mm thick rendering on concrete surfaces in cement mortar 1:3 , as in ceiling, finsihed the surfaces even and smooth without using extra cement complete all as specified and directed. | - | Square meter | - | - |
| - | Material and labour for Preparing of new plastered surface and applying two coats cement base paints on walls complete as specified | - | Square meter | - | - |
| - | Material & Labour for preparation of newly plastered wall surface and applying two coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and exterior paint of required shade @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm complete. | - | Square meter | - | - |
| - | Material and Labour for preparation of newly plastered surfaces over 2mm wall care putty to make surface smooth and applying two coats of oil bound distemper on walls all as specified. | - | Square meter | - | - |
| - | Material & Labour for preparation of newly plastered wall surface and applying two cotas of Acrylic Smooth exterior paint of required shade,applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primerapplied @ 2.20 kg/10 sqm complete. | - | Square meter | - | - |
| - | Material and Labour for preparation of new plastered surfaces and applying three coats of white wash on ceiling complete all as specified. | - | Square meter | - | - |
| - | Material and labour preparing old decorated plastered/unplastered wall surfaces including cornices by brooming down with steel wire brushes and scraping down smokes, spots etc applying one coat of oil bound distemper over 3mm wall care putty to make surface smooth complete. | - | Square meter | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
TENDER13.pdf
Tender Documents • 1.71 MB
BOQ_849305.xls
BOQ • 2.33 MB