Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹47.7 LAdmitted-Finance | -33.72% | ₹47.7 L | L1 | Admitted-Finance |
| 2 | L2₹52.6 L+₹4.8 L (10.2%)Admitted-Finance | -26.99% | ₹52.6 L+₹4.8 L (10.2%) | L2 | Admitted-Finance |
| 3 | L3₹52.9 L+₹5.2 L (10.8%)Admitted-Finance | -26.56% | ₹52.9 L+₹5.2 L (10.8%) | L3 | Admitted-Finance |
| 4 | L4₹53.2 L+₹5.5 L (11.5%)Admitted-Finance | -26.08% | ₹53.2 L+₹5.5 L (11.5%) | L4 | Admitted-Finance |
| 5 | L5₹53.3 L+₹5.6 L (11.6%)Admitted-Finance | -26.00% | ₹53.3 L+₹5.6 L (11.6%) | L5 | Admitted-Finance |
Tender Value
₹72 L
EMD Value
₹1.4 L
Closing Date
20 May 2026, 4:00 pmClosed
Er. Layaqit Ali (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
Please Refer to BOQ.
2026_PWDJK_309480_4
e-NIT No.09 of 2026-27 Dated 07-05-2026
Open Tender
Civil Works
Percentage
120 days
SURANKOTE
Please Refer to Technical Bid as per Conditions of e-NIT.
2 documents required · 2 mandatory
₹1,600
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹1.4 L
11 Jun 2026
7 May 2026
21 May 2026
7 May 2026
20 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in all kinds of soil. | 100.95 | Cum | 479.3 | ₹48,385.34 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) Crushed . | 22.27 | Cum | 5,202.9 | ₹1,15,868.58 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement-All work upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | 26.5 | Cum | 7,788.4 | ₹2,06,392.6 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | 78.36 | Cum | 6,591.25 | ₹5,16,490.35 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level in 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) crushed. | 33.93 | Cum | 5,733.6 | ₹1,94,541.05 |
| 6 | Damping/filling of stones/Boulders including cost of stones in horizontal on level. | 39.53 | Cum | 937.4 | ₹37,055.42 |
| 7 | Brick work with common burnt clay (non-modualar) bricks of class designation 75 in foundation and plinth in Cement mortar 1 :6 ( 1 cement : 6 coarse sand) & Extra for brick work in superstructure above plinth level upto floor V level. (By manual means). | 87.99 | Cum | 9,027.2 | ₹7,94,303.33 |
| 8 | Half brick masonry with bricks of class designation 75 in foundations and plinth in Cement mortar 1 :4 ( 1 cement : 4 coarse sand) & Extra for half Brick masonry in superstructure above plinth level upto floor V level. | 45.21 | Sqm | 1,106.9 | ₹50,042.95 |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size). | 8.91 | Cum | 9,395.7 | ₹83,715.69 |
| 10 | Providing and laying Reinforced Cement Concrete 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in suspended floors, balconies, landings and staircase having upto 15° slope. excluding cost of centering and shuttering , all work upto floor V level. | 64.31 | Cum | 9,821.85 | ₹6,31,643.17 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.13 MB
BOQ_1001933.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .