| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.0 LAccepted-AOC | ₹11.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.1 L+₹17,846.93 (1.63%)Rejected-AOC 9998E OPP KAMARAJ POLYTECHNIC COLLEGE PAZHAVILAI | ₹11.1 L+₹17,846.93 (1.63%) | L2 | Rejected-AOC L2 |
| 3 | L3₹11.3 L+₹34,756.56 (3.17%)Rejected-AOC | ₹11.3 L+₹34,756.56 (3.17%) | L3 | Rejected-AOC L3 |
| 4 | L4₹11.6 L+₹62,959.81 (5.74%)Rejected-AOC | ₹11.6 L+₹62,959.81 (5.74%) | L4 | Rejected-AOC L4 |
| 5 | L5₹11.6 L+₹63,920.55 (5.83%)Rejected-AOC | ₹11.6 L+₹63,920.55 (5.83%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Manikandan L7 | Alexandar C L11 | D JOHN L10 | SRI SAKTHY CONSTRUCTION L13 | S M CONSTRUCTION L8 | S SUYAMBUTHURAI L3 | GREEN FARM AGENCIES L2 | M J B CONSTRUCTIONS L5 | RAVICHANDRAN L12 | KRK CONSTRUCTION L4 | S SRINIVASAN(WORKS CONTRACTOR) L1 | SIVALINGAM CONTRACTOR L9 | p.kannan L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away for AC Sheet roofing without roof timbers etc. complete complying with standard specification. | 154.8 | M2 | 16.63 ₹2,574.32 | 17.54 ₹2,715.19 | 176.7 ₹27,353.16 | 18 ₹2,786.4 | 16.44 ₹2,544.91 | 15.69 ₹2,428.81 | 14.8 ₹2,291.04 Lowest | 18 ₹2,786.4 | 18 ₹2,786.4 | 16 ₹2,476.8 | 16 ₹2,476.8 | 18 ₹2,786.4 | 16.06 ₹2,486.09 |
| 2.00 | Dismantling, clearing away for Wrought and put-up Framed Timbers in roofs / floors | 0.85 | M3 | 698.1 ₹593.39 | 736.1 ₹625.69 | 741.7 ₹630.45 | 790 ₹671.5 | 690.17 ₹586.64 | 658.44 ₹559.67 | 649.69 ₹552.24 Lowest | 682 ₹579.7 | 757 ₹643.45 | 675 ₹573.75 | 750 ₹637.5 | 794 ₹674.9 | 674.3 ₹573.16 |
| 3.00 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of Brick / stone masonry in Cement mortar walls under 3m high | 4.25 | M3 | 217.51 ₹924.42 | 74.98 ₹318.67 Lowest | 283.2 ₹1,203.6 | 300 ₹1,275 | 263.58 ₹1,120.22 | 251.46 ₹1,068.71 | 246.72 ₹1,048.56 | 252 ₹1,071 | 289 ₹1,228.25 | 257.8 ₹1,095.65 | 280 ₹1,190 | 81 ₹344.25 | 257.51 ₹1,094.42 |
| 4.00 | Dismantling and clearing away for Plain cement concrete etc complete. | 1.35 | M3 | 457.8 ₹618.03 | 482.72 ₹651.67 | 486.4 ₹656.64 | 500 ₹675 | 452.6 ₹611.01 | 431.79 ₹582.92 | 419.42 ₹566.22 Lowest | 440 ₹594 | 496 ₹669.6 | 442.7 ₹597.65 | 480 ₹648 | 520 ₹702 | 442.19 ₹596.96 |
| 5.00 | Dismantling, clearing away for floor finish and dadooing walls in cement mortar with glazed tiles etc complete. | 107.8 | M2 | 26.21 ₹2,825.44 Lowest | 60.83 ₹6,557.47 | 61.2 ₹6,597.36 | 63 ₹6,791.4 | 57.04 ₹6,148.91 | 54.41 ₹5,865.4 | 49.34 ₹5,318.85 | 57 ₹6,144.6 | 62 ₹6,683.6 | 55.8 ₹6,015.24 | 60 ₹6,468 | 66 ₹7,114.8 | 55.72 ₹6,006.62 |
| 6.00 | Supplying and filling in foundation, basement, etc with conveyed earth-5KMR in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 9.9 | M3 | 792 ₹7,840.8 | 343.15 ₹3,397.19 | 1,652.3 ₹16,357.77 | 400 ₹3,960 | 318.55 ₹3,153.65 | 303.9 ₹3,008.61 | 275.5 ₹2,727.45 Lowest | 321.5 ₹3,182.85 | 349 ₹3,455.1 | 311.59 ₹3,084.74 | 350 ₹3,465 | 394 ₹3,900.6 | 311.22 ₹3,081.08 |
| 7.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for foundation and flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 7 | M3 | 5,720 ₹40,040 | 4,870.06 ₹34,090.42 | 4,960 ₹34,720 | 5,400 ₹37,800 | 4,348.93 ₹30,442.51 | 4,148.98 ₹29,042.86 Lowest | 4,276.48 ₹29,935.36 | 4,500 ₹31,500 | 4,900 ₹34,300 | 4,253.95 ₹29,777.65 | 5,100 ₹35,700 | 5,800 ₹40,600 | 4,248.95 ₹29,742.65 |
| 8.00 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 2.5 | M2 | 968 ₹2,420 | 1,004.6 ₹2,511.5 | 511.9 ₹1,279.75 Lowest | 1,000 ₹2,500 | 941.91 ₹2,354.78 | 898.61 ₹2,246.53 | 888.19 ₹2,220.48 | 930 ₹2,325 | 1,033 ₹2,582.5 | 921 ₹2,302.5 | 900 ₹2,250 | 800 ₹2,000 | 920.26 ₹2,300.65 |
| 9.00 | Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). In Ground Floor. | 0.15 | M3 | 7,744 ₹1,161.6 | 7,478.71 ₹1,121.81 | 7,898 ₹1,184.7 | 800 ₹120 Lowest | 7,062.31 ₹1,059.35 | 6,737.66 ₹1,010.65 | 6,694.33 ₹1,004.15 | 6,900 ₹1,035 | 7,752 ₹1,162.8 | 6,908 ₹1,036.2 | 7,900 ₹1,185 | 8,000 ₹1,200 | 6,899.96 ₹1,034.99 |
| 10.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) Above Plinth / Basement level | 0.09 | Qtl | 94.91 ₹8.54 Lowest | 8,626.85 ₹776.42 | 8,588.5 ₹772.97 | 9,100 ₹819 | 8,260.11 ₹743.41 | 7,880.34 ₹709.23 | 7,641.02 ₹687.69 | 8,000 ₹720 | 9,067 ₹816.03 | 8,079.7 ₹727.17 | 9,000 ₹810 | 8,500 ₹765 | 8,070.22 ₹726.32 |
Tender Value
Refer Docs
EMD Value
₹13,700
Closing Date
31 Jul 2026, 3:00 pmClosed
Executive Engineer, PWD.,
Executive Engineer, PWD., Buildings Construction and Maintenance Division, Nagercoil
Special Repairs to O.P. Block, Roof, Floor, Joineries, Water Supply and Sanitary Works and Painting Works in Government Primary Health Centre at Rajakkamangalamthurai in Kanniyakumari District.
2026_PWD_686333_1
e-Tender Notice No. 2(3) / C.8.1 / 230M / 2026-27 Dt.14.07.2026
Open Tender
Civil Works - Buildings
Lump-sum
Rajakkamangalam Thurai
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,700
21 Aug 2026
16 Jul 2026
31 Jul 2026
16 Jul 2026
31 Jul 2026
16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling, clearing away for AC Sheet roofing without roof timbers etc. complete complying with standard specification. | 154.8 | M2 | 18.9 | ₹2,925.72 |
| 2 | Dismantling, clearing away for Wrought and put-up Framed Timbers in roofs / floors | 0.85 | M3 | 793.3 | ₹674.31 |
| 3 | Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of Brick / stone masonry in Cement mortar walls under 3m high | 4.25 | M3 | 302.96 | ₹1,287.58 |
| 4 | Dismantling and clearing away for Plain cement concrete etc complete. | 1.35 | M3 | 520.23 | ₹702.31 |
| 5 | Dismantling, clearing away for floor finish and dadooing walls in cement mortar with glazed tiles etc complete. | 107.8 | M2 | 65.56 | ₹7,067.37 |
| 6 | Supplying and filling in foundation, basement, etc with conveyed earth-5KMR in layers of not more than 150mm thick layers well watered, rammed with surface vibrator and consolidated including conveyance charges etc. complete complying with standard specification and as directed by the departmental officers. | 9.9 | M3 | 366.15 | ₹3,624.88 |
| 7 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for foundation and flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers | 7 | M3 | 5,310.44 | ₹37,173.08 |
| 8 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 2.5 | M2 | 1,082.66 | ₹2,706.65 |
| 9 | Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). In Ground Floor. | 0.15 | M3 | 8,119.91 | ₹1,217.99 |
| 10 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) Above Plinth / Basement level | 0.09 | Qtl | 9,494.38 | ₹854.49 |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
TD1365Rajakkamangalamthurai.pdf
Tender Documents • 1.61 MB
BOQ_825012.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .