| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 Cr+₹4.8 L (3.44%)Rejected-Finance | ₹1.4 Cr+₹4.8 L (3.44%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.4 Cr+₹5.4 L (3.88%)Rejected-Finance | ₹1.4 Cr+₹5.4 L (3.88%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | J P INFRATECH L2 | ARUN KUMAR GUPTA L3 | M/S SATT SAHIB CONSTRUCTION CO L1 |
|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick bushes and throney Jungle including disposal with all cost of labour and T&P etc. (Per Sqm) | 67,000 | Sqm | 5 ₹3,35,000 Lowest | 5.09 ₹3,41,030 | 5 ₹3,35,000 Lowest |
| 2.00 | Providing beldar for remooving Tree branches from Structures / cleaning ghat i/c all cost of labour and T&P etc (Per No) | 600 | Mandays | 450 ₹2,70,000 | 439.41 ₹2,63,646 Lowest | 450 ₹2,70,000 |
| 3.00 | Earth work in Removing Thecks from Canal bed including disposal with all cost of material, labour and T&P etc. complete the work . (Per CuM) | 7,150 | Cum | 195 ₹13,94,250 | 217.28 ₹15,53,552 | 150 ₹10,72,500 Lowest |
| 4.00 | Providing and laying Boulder apron for Canal Bed Protection including cost of boulder and T&P etc complete. | 685 | Cum | 1,800 ₹12,33,000 | 1,785.77 ₹12,23,252.45 Lowest | 1,840 ₹12,60,400 |
| 5.00 | 15 mm thick Cement Plaster 1:4 CM including all cost of material, labour and T&P etc. (Per SqM) | 2,525 | Sqm | 195 ₹4,92,375 Lowest | 204.67 ₹5,16,791.75 | 210 ₹5,30,250 |
| 6.00 | Providing & Laying C.C. Grade M-20 Nominal Mix 1:2:4 including all cost of material, labour and T&P etc. (Per CuM) | 180 | Cum | 6,200 ₹11,16,000 Lowest | 6,211.88 ₹11,18,138.4 | 6,400 ₹11,52,000 |
| 7.00 | Providing and Laying Ist Class Brick Work in 1:4 Cm i/c. all cost of matrial, labour and T&P etc. | 125 | Cum | 5,600 ₹7,00,000 | 5,561.01 ₹6,95,126.25 Lowest | 5,700 ₹7,12,500 |
| 8.00 | Providing & Laying RBM i/c. all cost of material, labour and T&P etc complete. | 775 | Cum | 1,290 ₹9,99,750 Lowest | 1,383.22 ₹10,71,995.5 | 1,400 ₹10,85,000 |
| 9.00 | Supplying & Laying of coloured compressed cement concrete Tile in Lining in double layer with 15 mm sandwich plaster I 1:3 on slope incluing all cost of material ,labour T&p etc. (Per Sqm) | 5,280 | Sqm | 1,375 ₹72,60,000 | 1,334.72 ₹70,47,321.6 | 1,300 ₹68,64,000 Lowest |
| 10.00 | Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701 | 11 | Sqm | 4,000 ₹44,000 Lowest | 4,171 ₹45,881 | 4,300 ₹47,300 |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
8 Sept 2025, 2:00 pmClosed
SE GNSM Meerut
Office of SE GNSM Meerut
As per the NIT
2025_UPIDC_1070146_3
04/SE/2025-26
Open Tender
Civil Works
Piece-work
18 days
Haridwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
₹3.0 L
Office of SE GNSM Meerut
17 Oct 2025
1 Sept 2025
8 Sept 2025
1 Sept 2025
8 Sept 2025
1 Sept 2025
3 Sept 2025
Amount
Cleaning thick bushes and throney Jungle including disposal with all cost of labour and T&P etc. (Per Sqm)
Providing beldar for remooving Tree branches from Structures / cleaning ghat i/c all cost of labour and T&P etc (Per No)
Earth work in Removing Thecks from Canal bed including disposal with all cost of material, labour and T&P etc. complete the work . (Per CuM)
Providing and laying Boulder apron for Canal Bed Protection including cost of boulder and T&P etc complete.
15 mm thick Cement Plaster 1:4 CM including all cost of material, labour and T&P etc. (Per SqM)
Providing & Laying C.C. Grade M-20 Nominal Mix 1:2:4 including all cost of material, labour and T&P etc. (Per CuM)
Providing and Laying Ist Class Brick Work in 1:4 Cm i/c. all cost of matrial, labour and T&P etc.
Providing & Laying RBM i/c. all cost of material, labour and T&P etc complete.
Supplying & Laying of coloured compressed cement concrete Tile in Lining in double layer with 15 mm sandwich plaster I 1:3 on slope incluing all cost of material ,labour T&p etc. (Per Sqm)
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and Technical Specification Clause 1701
Making Bundha from E.C. Bags for Diversion of water including all E.C. bags filled with local Earth including cost of all material, labour and T&P etc. Complete.Rate per No
Dewatering from foundation of abutments and wing walls (with pump capacity 4000 lit per Hr.) including wages of operator and fuel including supply of all material, labour and T&P etc. required for proper completion of the work.Rate per Hour
Providing and fixing of P.V.C. water stopper (ISI Mark) I.S.15058/12200, size 300X10mm white colour including all cost of material, labour and T&P etc. Complete Rate Per RM
J P INFRATECH (BID ID -5519549)
ARUN KUMAR GUPTA (BID ID -5519563)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .