| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC | ₹2.8 Cr | L1 | Accepted-AOC Accepted L1 |
| 2 | L2₹2.8 Cr+₹32,041.92 (0.11%)Rejected-Finance HOUSE NO 20 BAGHARBARI VIDYANAGAR 2 PANJABARI GUWAHATI ASSAM 781037 | KAMRUP METRO | ASSAM | 781037 | ₹2.8 Cr+₹32,041.92 (0.11%) | L2 | Rejected-Finance Rejected as L2 |
| 3 | L3₹2.9 Cr+₹5.0 L (1.75%)Rejected-Finance VILL DONGARKUCHI P O SONKUCHI P S BARPETA DIST BARPETA ASSAM 781301 | BARPETA | ASSAM | 781301 | ₹2.9 Cr+₹5.0 L (1.75%) | L3 | Rejected-Finance Rejected as L3 |
| 4 | L4₹3.1 Cr+₹27.6 L (9.73%)Rejected-Finance | ₹3.1 Cr+₹27.6 L (9.73%) | L4 | Rejected-Finance Rejected as L4 |
| 5 | L5₹3.2 Cr+₹37.0 L (13.1%)Rejected-Finance C O NARAYAN TALUKDAR KAILASHPUR FATASHIL HOUSE NO NIL CITY TOWN GUWAHATI P O BHARALUMUKH P S BHARALUMUKH DISTRICT KAMRUP METRO PIN 781009 | KAMRUP METRO | ASSAM | 781009 | ₹3.2 Cr+₹37.0 L (13.1%) | L5 | Rejected-Finance Rejected as L5 |
| Sl No | Description | Qty | Unit | Sri Gunajit Nath L1 | JOGESH DAS L5 | FAYZAL HOQUE L3 | Dhaneswar Kalita L2 | Ajay Kumar L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed. | 165 | each | 1,400 ₹2,31,000 | 1,400 ₹2,31,000 | 1,580.35 ₹2,60,757.75 | 1,556.35 ₹2,56,797.75 | 1,200 ₹1,98,000 Lowest |
| 2.00 | Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department) | 40 | Meter | 1,100 ₹44,000 Lowest | 1,200 ₹48,000 | 1,265.77 ₹50,630.8 | 1,246.54 ₹49,861.6 | 1,100 ₹44,000 Lowest |
| 3.00 | Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. | 50 | Meter | 12,000 ₹6,00,000 | 12,000 ₹6,00,000 | 12,828.48 ₹6,41,424 | 12,633.6 ₹6,31,680 | 10,000 ₹5,00,000 Lowest |
| 4.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (i) upto 3 m Depth | 275.68 | Cum | 60 ₹16,540.8 Lowest | 127 ₹35,011.36 | 72.5 ₹19,986.8 | 70.37 ₹19,399.6 | 127 ₹35,011.36 |
| 5.00 | Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm) | 371.8 | Metre | 11,000 ₹40,89,800 Lowest | 14,000 ₹52,05,200 | 14,275.91 ₹53,07,783.34 | 13,997.1 ₹52,04,121.78 | 14,000 ₹52,05,200 |
| 6.00 | Levelling course for Pile Cap | 16.06 | Cum | 5,152 ₹82,741.12 Lowest | 6,000 ₹96,360 | 5,495.74 ₹88,261.58 | 5,412.25 ₹86,920.74 | 5,500 ₹88,330 |
| 7.00 | Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. RCC Grade M35 Using Batching Plant, Transit Mixer and Concrete Pump | 272.65 | Cum | 7,500 ₹20,44,875 | 8,500 ₹23,17,525 | 7,073.42 ₹19,28,567.96 | 6,966 ₹18,99,279.9 Lowest | 8,000 ₹21,81,200 |
| 8.00 | Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) | 61.52 | tonne | 75,000 ₹46,14,000 | 75,000 ₹46,14,000 | 60,529.96 ₹37,23,803.14 | 59,610.5 ₹36,67,237.96 Lowest | 75,000 ₹46,14,000 |
| 9.00 | Pile load test on single vertical pile in accordance with IS:2911(Part-IV).
a). Initial and Routine load test. | 1,000 | tonne | 300 ₹3,00,000 Lowest | 450 ₹4,50,000 | 352.3 ₹3,52,300 | 346.65 ₹3,46,650 | 400 ₹4,00,000 |
| 10.00 | b) Lateral load test | 100 | tonne | 1,000 ₹1,00,000 Lowest | 6,500 ₹6,50,000 | 5,866.96 ₹5,86,696 | 5,777.8 ₹5,77,780 | 6,500 ₹6,50,000 |
Tender Value
₹3.1 Cr
EMD Value
₹6.1 L
Closing Date
8 Dec 2025, 2:00 pmClosed
CE(EAP), PWRD, Fatasil Ambari, Ghy.
O/o the CE(EAP), PWRD, Fatasil Ambari, Ghy.
CE/EAP/ARRBP/OCB/Bridge1/Barpeta/10B Construction of Bridge in Barpeta district i) Br. No. 3/1 on Dabaliapara to Baniarapara Road
2025_PWRDW_48953_3
EAP/ARRBP/716719/07
Open Tender
Civil Works - Bridges
Item Rate
720 days
Barpeta District
Please refer Tender documents.
7 documents required · 7 mandatory
₹6,000
₹6.1 L
Yes
O/o the CE(EAP), PWRD, Fatasil Ambari, Ghy.
8 Sept 2026
29 Nov 2025
8 Dec 2025
29 Nov 2025
8 Dec 2025
29 Nov 2025
29 Nov 2025 - 1 Dec 2025
1 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour for taking out old piles of timber bridge with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed. | 165 | each | 100 | ₹16,500 |
| 2 | Labour for dismantling all members of the timber bridge (excluding piles) with necessary scaffolding, jati bamboos, jumper ropes etc, complete and stacking them at suitable places as directed (all members will be under custody of the contractor till taken over by the department) | 40 | Meter | 100 | ₹4,000 |
| 3 | Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. | 50 | Meter | 10 | ₹500 |
| 4 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. B . Mechanical Means, (I) Without dewatering (i) upto 3 m Depth | 275.68 | Cum | 10 | ₹2,756.8 |
| 5 | Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm) | 371.8 | Metre | 10 | ₹3,718 |
| 6 | Levelling course for Pile Cap | 16.06 | Cum | 10 | ₹160.6 |
| 7 | Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. RCC Grade M35 Using Batching Plant, Transit Mixer and Concrete Pump | 272.65 | Cum | 10 | ₹2,726.5 |
| 8 | Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications. TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent) | 61.52 | tonne | 10 | ₹615.2 |
| 9 | Pile load test on single vertical pile in accordance with IS:2911(Part-IV).
a). Initial and Routine load test. | 1,000 | tonne | 10 | ₹10,000 |
| 10 | b) Lateral load test | 100 | tonne | 10 | ₹1,000 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
LOT.pdf
Additional Documents • 0.54 MB
LOF.pdf
Additional Documents • 0.67 MB
Technical_specification_Barpeta_10B.pdf
Additional Documents • 0.73 MB
ESMP_Barpeta_10B.pdf
Additional Documents • 1.68 MB
AnnexureX.pdf
Additional Documents • 0.18 MB
SBD_Barpeta_10B.pdf
Tender Documents • 4.96 MB
BOQ_77696.xls
BOQ • 0.32 MB
Volume_II_Drawings_Barpeta_10B.pdf
Additional Documents • 10.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .