Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | ZEN TECHNOLOGIES LIMITEDLikely winner L1₹2.4 CrQualified B 42 INDUSTRIAL ESTATE SANATH NAGAR HYDERABAD TELANGANA 500018 | MEDCHAL MALKAJGIRI | TELANGANA | 500018 | L1 | Qualified MII | |
| 2 | L2₹2.5 Cr+₹8.8 L (3.61%)Qualified 2 22 261 2 4TH FLOOR ABOVE G PULLA REDDY SWEETS A S RAJU NAGAR KUKATPALLY KUKATPALLY HYDERABAD RANGAREDDI TELANGANA 500072 | MEDCHAL MALKAJGIRI | TELANGANA | 500072 | L2 | Qualified MSE, MII, Category: General | |
| 3 | Disqualified | - | Disqualified MSE, MII, Category: General | |
| 4 | Disqualified | - | Disqualified MSE, MII, Category: General | |
| 5 | Disqualified 1002 OPAL SQUARE S G BARVE ROAD WAGLE ESTATE THANE MAHARASHTRA 400604 | THANE | MAHARASHTRA | 400604 | - | Disqualified MSE, MII, Category: General |
Tender Value
₹2 Cr
EMD Value
₹6 L
Closing Date
10 Aug 2026, 4:00 pmClosed
Containerized Tubular Shooting Range
9463441
GEM/2026/B/7660223
Two Packet Bid
40 Feet Container,Smart Target System,Visual System,Master Control Unit,Firer Cabin,Bullet Containm
Ranchi, Jharkhand
Total value wise evaluation
BOQ
5 documents required · 5 mandatory
3 yrs
₹1 Cr
₹4 Cr
80%
₹6 L
5 Oct 2026
20 Jul 2026
10 Aug 2026
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) | Spec |
|---|---|---|---|---|---|---|---|
| 1 | 40 Feet Container | The CTSR should be designed by
using standard 40 ft High cube ISO
Container 40 ft x 8 ft x 9.6 ft | 1 | Nos | Ranchi | 60 | - |
| 2 | Smart Target System | Smart Target System
CTSR should have feature of a
Smart Target System where the targets
Should be projected on location of hit
And miss LOMAH system located at
the Target End Targets may be any
Standard scoring target pop up targets.
The Robust and smart Target Application
software should allow varying the target
Ranges from 10 to 300 mtr inside
The container It should also be able
To facilitate different type of exercises
Such as Grouping Static timed exercise
And Annual Range Course or any
Other Practice as desired by the user
It should display the point of hit
On the target within an accuracy
Of 5 mm or better | 2 | Nos | Ranchi | 60 | |
| 3 | Visual System | Each firing lane of CTSR should be
equipped with display unit which
Enabled the firer to monitor and
Control the targets and exercise in
That lane. The FDU to be capable to
Perform the following activities.
Give shot location on the target.
Give possible score aggregate Score.
Indicate mean point of Impact.
Indicate type of exercise in progress.
Show group size and MPL.
Furnishing X and Y coordinate of
the shorts.
Lane operating status.
Grouping and zeroing.
Zoom in and zoom out and panning
Of the target on the screen.
Exercise replay. | 2 | Nos | Ranchi | 60 | |
| 4 | Master Control Unit | CTSR should be equipped with control
Station for firing point Officer JCO
through which practice fire can be
regulated and various simulation can be
Practiced. Control station to have
Facility to communicate with the firer
And instruct him to carry out necessary
Corrective action to improve the firing.
It should also to have centralise
Control to start or stop the firing practice. | 1 | Nos | Ranchi | 60 | |
| 5 | Firer Cabin | CTSR to have minimum two Independent
Firing booths with facility to fore from
Standing kneeling and lying position.
The firing booth to be acoustically treated
By using acoustic form rubber tiles for easy
of maintenance of CTSR. Each booth to be
equipped with firing booth display unit
Interactive audio interface to be communicate
With the instructor and CC cameras to
Record the total firing session.
Suitable fresh Laminar air flow to be
Provided on each line to meet the
Range ventilation requirements.
Each booth should have independent
Doors equipped with toughened glass
To monitor the firing practice by
Instructor from outside the should
Serve as entry exit the emergency exit
In case of any accident. | 2 | pieces | Ranchi | 60 | |
| 6 | Bullet Containment Trap | The bullet containment trap should be made
Up by using AR500 armour steel plates and
Should be placed behind the target to collect
All the bullets fired. The Bullet containment
Trap should be manufactured in such a way
That to replace and reverse the primary impact
Plates to any position should increase the life
Of the system The system should be
Positioned in a 10 feet acoustically treated
Container with provision to easily enter and
Carry out target maintenance activities
The container should be designed in such
A way to quickly attach with the 40 feet
CTSR container The bullets contacted
The angular plates should be guided into a
deceleration chamber where the velocity
Of projectile will reduce to zero and
collected at the Tins provided at bottom
The bullet containment trap should easily
Give a life of 1 point 5 to 2 lakhs of rounds with
Minimum maintenance activities | 2 | Nos | Ranchi | 60 | |
| 7 | Range Tube | The tubes used in the CTSR to be made out
Of bullet proof material with a minimum
Thickness of 10 mm. The tubes to be such
That the ricochet problem is eliminated. | 2 | Nos | Ranchi | 60 | |
| 8 | Ventilation System | The CTSR to be equipped with suitable
Ventilation System to meet the all indoor
firing range Requirements. The ventilation
system to provide fresh air at firer end.
Filtration of the Exhaust air to be carried out
minimum by HEPA filters. Also it should have
Suitable Mechanism to indicate when filter
Change is required. | 1 | Nos | Ranchi | 60 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9463441.pdf
GEM_BID • 0.14 MB
ctsr_specification_2026-06-12-21-27-54_a64e2b5828a9602440d3b26cb60f9d9f.pdf
BOQ • 2.15 MB
ctsr_boq_item_sample_file_-3_2026-06-12-21-27-54_66ea5f447c4427988498333660fb4aae.csv
BOQ • 0.00 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .