| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 214 1 POONTHOTTA STREET SANKARNAGAR TIRUNELVELI 7 | TIRUNELVELI | TAMIL NADU | 627001 | ₹1.2 Cr | L1 | Accepted-AOC ACCEPTED |
| 2 | Rejected-Technical NO 151 6A POLIPET NEW BUS STAND NORTH POLIPET THOOTHUKUDI 628 002 | TUTICORIN | TAMIL NADU | 628002 | - | - | Rejected-Technical Rejected |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
27 Jun 2025, 3:00 pmClosed
COMMISSIONER TIRUNELVELI
S.N.HIGH ROAD MAIN OFFICE TIRUNELVELI CORPORATION
Package 9 Providing B.T.Surface at Shenbagampilai otrai , Shenbagam pillai otrai cross street South Mount Road , Sn Sannathi Road Vedhanthiri nagar sreet , West, North street , East Bazar, Kumaran Main Street in ward no 21,22,23,25,26
2025_MAWS_571258_1
15/2025-26/9
Open Tender
Civil Works - Roads
Works
90 days
S.N.HIGH ROAD MAIN OFFICE TIRUNELVELI CORPORATION
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.2 L
28 Jul 2025
19 Jun 2025
27 Jun 2025
19 Jun 2025
27 Jun 2025
19 Jun 2025
Amount
Charges for cutting the BT/CC surface to 5 to 7 cm depth using milling machine, conveying the milled waste materials to at least for 5 Km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen items etc., complete as per the direction of the departmental officersetc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Earth work excavation and deposting on bank with an intial lead of 10m& initial liftm of 2m in hard siff clay , stiff black cotton , hard red earth shales , murram , gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil asper standard specification 20.B including refilling charges
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials table 400-13 with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORT&H Specification Rev-5
Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications
Providing and laying Prime Coat using emulsion distributor over WMM surface using 7Kg of Emulsion Bitumen (SS1) per 10sqm for preparatory to another bituminous construction overit, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat using emulsion distributor over WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying tack coat of 2kgs/10 sqm over the BT surface treated with binder using 2 kgs of bituminous Emulsion (RS) for 10square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications
consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0..25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of al lmaterials to CMP site ,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hotmix plant20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uni form thickness of 50mm with paver to the specifi degrades and cross sections and compacted by Vibratory /Pneumatic Rollert othere quired density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory/ Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous concrete to 40mm/30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .