Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance | -15.00% | ₹2.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.0 Cr+₹39.7 L (15.2%)Admitted-Finance | -2.05% | ₹3.0 Cr+₹39.7 L (15.2%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 Cr+₹42.9 L (16.5%)Admitted-Finance | -1.01% | ₹3.0 Cr+₹42.9 L (16.5%) | L3 | Admitted-Finance |
Tender Value
₹3.1 Cr
EMD Value
₹17.3 L
Closing Date
13 May 2026, 3:00 pmClosed
CHIEF ENGG NAGAR NIGAM MEERUT
NNM
Work of upgradation of Ward-10 Kanha Gaushala Partapur
2026_NNMEE_1143511_2
144/SNV-2T/2026
Open Tender
Civil Works
Fixed-rate
90 days
MEERUT
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
MUNICIPAL COMMISSIONER NAGAR NIGAM
₹17.3 L
6 Jun 2026
29 Apr 2026
13 May 2026
29 Apr 2026
13 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BOUNDARY WALL Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. all kind of soil | 1,224.37 | Cum | 135.63 | ₹1,66,064.63 |
| 2 | Providing and laying of PCC 1:4:8 grade in foundation & pilnth with proper compecting. | 88.23 | Cum | 5,205.22 | ₹4,59,258.91 |
| 3 | Brick work with common burnt clay F.P.S. (non modular) bricks of class 150 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) | 261.63 | Cum | 6,958.09 | ₹18,20,425.3 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and reinforcement - 1:1.5:3 (1 cement : 154 coarse sand (zone-ill) : 3 graded stone
aggregate 20 mm in footing | 92.23 | Cum | 8,292.47 | ₹7,64,784.66 |
| 5 | in plinth beam | 51.71 | Cum | 8,292.47 | ₹4,28,762.16 |
| 6 | in Column upto plinth | 51.27 | Cum | 8,292.47 | ₹4,25,189.14 |
| 7 | Above Plinth Beam a) in Column | 43.43 | Cum | 8,292.47 | ₹3,60,160.22 |
| 8 | b) in Top Beam | 23.78 | Cum | 8,292.47 | ₹1,97,230.59 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 300.78 | Sqm | 299.65 | ₹90,130.04 |
| 10 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 620.46 | Sqm | 562.7 | ₹3,49,133.97 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
NNMT2.pdf
Tender Documents • 3.93 MB
BOQ_2136115.xls
BOQ • 1.05 MB
2.pdf
Additional Documents • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .