Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
15 Jul 2022, 3:00 pmClosed
Project Director, DRDA, Virudhunagar
DRDA, Collectorate Complex, Virudhunagar
Providing Infrastructure facilities in Schools and construction of other public utilities - 14 nos. in AGAMT-II-2021-22 Village panchayats of Sivakasi Block in Virudhunagar District in Package no.SVK-4.
2022_RDTN_237316_61
C9/5832/2021 dated 18.06.2022
Open Tender
Civil Works
Works
180 days
Sivakasi Block
Two Cover System. Refer tender document.
5 documents required · 5 mandatory
₹0
₹1.9 L
DRDA, Collectorate Complex, Virudhunagar
16 Sept 2022
29 Jun 2022
15 Jul 2022
29 Jun 2022
15 Jul 2022
6 Jul 2022
6 Jul 2022
Amount
Part-1:- Construction of Panchayat Office Building at Chokkampatti Village and Panchayat.
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundationdigging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Ist Depth 0.00 -0.30m
II nd Depth 0.30 -0.60m
III rd Depth Above 0.60m
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Cement concrete 1:3:6 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and filling with filling sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc, complete For Foundation
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc., complete.
Reinforced cement concrete 1:11/2:3 mix using 20 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., - Below Basement
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., - Slab and Beam
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by we
Paving the Floor with Vitrified tiles in CM 1:3 20mm thick
Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing the walls with new Glazed tiles of size 150 x150 x6 mm laid in CM 1:2 ,10 mm thick and pointig with white cement using 0.40 Kg/Sq.m. including finishing the joint and pointing flush with ties surface
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Fabrication and supply of mild steel Door of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Door 1.10 x 2.10 m
Door 1.00 x 2.10 m
Toilet door 0.75 X 1.80 m
Fabrication and supply of mild steel Window of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Window 1.20 x 1.30 m
Window 1.50 x 1.30 m
Towards cost and supply of Rolling shutter of size 1.20X2.10m
Grill Gate of size 1.20X2.10m
Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall )
Painting two coats with approved Exterior Emulsion Painting all cost and conveyance of labour charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Painting two coat of new iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Labour charges for fixing of Steel Door including all labour charges etc. complete.
Door 1.10 x 2.10m
Door 1.00 x 2.10 m
Door 0.75 x 2.10m
Labour charges for fixing of Steel Window including all labour charges etc. complete.
Window 1.20 x1.30
Window 1.50 x1.30
Supplying and delivery of Indian Water Closet including P Trap set all cost of labour charges etc.,
Supplying and delivery of European Water Closet including P Trap set all cost of labour charges etc.,
Supply and delivery of wash basin
32mm UPVC Pipe
Nalli (including Coupling, bend etc.,)
Electrification
Light point SD22
Supplying and fixing Tube light SD88
Supply and fixing CFL SD80
Supply and fixing CFL Head SD83
Fan point SD22
Supply and fixing Fan SD106
Plug point 3x3 SD139
Meter board SD125
DAP switch SD142
GI service pipe SD69
Runoff wire SD64
Part-2:- Constriction of Panchayat Office at Kothaneri in Kothaneri Panchayat.
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete.
Collection and supply of M-Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Below GL
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcAbove GL
Reinforced cement concrete 1:11/2:3 mix using 20mm HBG Metal including cost & conveyance of all materials.
Supplying and fabrication of steel of RCC works including all cost and conveyance and all labour charges such as cutting bending tying and placed in position etc., complete.
Plastering with CM 1:5 12mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete.
Plastering with CM 1:3 10mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete.
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratioof 32:12.5 including cost and conveyance of all materials to site and all labourcharges for mixing , laying ,and finishing etc complete for 10 cum
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by we
Paving the Floor with Vitrified tiles in CM 1:3 20mm thick
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including
Dadooing Wall Tiles with in CM1:2 mix including all charges etc complete
Supplying and Fixig of door size 1.10x2.10 m
Supplying and fixing of Door size 0.75x1.80
Cost and supply of Window size1.20x1.30 m
Cost and supply of Window size1.50x1.30 m
Cost and of Rolling shutter
Cost and of Grill gate
Supplying & Fixing of Jolly including cost & Conveyance etc., complete
Distempering into two coat with best approved colour including labour charge etc., complete.
Emulsion Painting into two coats with using best quality and approved Emulsion paint over one coat of Cement paint primex including all cost and conveyance etc., complete.
Painting two coats over new iron works using ready mixed enamel paintincluding cost and conveyance of paint and all labour charges etc complete
Fixing of steel door including all materials and labour charges etc., complete
Fixing of steel window including all materials and labour charges etc., complete
Supply and fixing in position of best Indian make White glazed earthernware Oriya Pan Indian water closet including all cost etc., complete
Supply and fixing in position of best with European water closet with cistern tank including all accessories etc., complete
Supply and fixing in position of wash basin of size 550x400 mm with pedestal including all accessories etc., complete
32 mm UPVC pipe
1000 sintex with pipe arrangements
Nalli
Electrification
Light point SD22
Supplying and fixing Tube light SD88
Supply and fixing CFL SD80
Supply and fixing CFL Head SD83
Fan point SD22
Supply and fixing Fan SD106
Plug point 3x3 SD139
Meter board SD125
DAP switch SD142
GI service pipe SD69
Runoff wire SD64
Part-3:- Construction of Panchayat Office Building in Kumilankulam Village & Panchayat
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete.
Collection and supply of M-Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Below GL
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcAbove GL
Reinforced cement concrete 1:11/2:3 mix using 20mm HBG Metal including cost & conveyance of all materials.
Supplying and fabrication of steel of RCC works including all cost and conveyance and all labour charges such as cutting bending tying and placed in position etc., complete.
Plastering with CM 1:5 12mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete.
Plastering with CM 1:3 10mm thick including cost and conveyance of all materials, watering, curing and all other incidental charges etc., complete.
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratioof 32:12.5 including cost and conveyance of all materials to site and all labourcharges for mixing , laying ,and finishing etc complete for 10 cum
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by we
Paving the Floor with Vitrified tiles in CM 1:3 20mm thick
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including
Dadooing Wall Tiles with in CM1:2 mix including all charges etc complete
Supplying and Fixig of door size 1.10x2.10 m
Supplying and fixing of Door size 0.75x1.80
Cost and supply of Window size1.20x1.30 m
Cost and supply of Window size1.50x1.30 m
Cost and of Rolling shutter
Cost and of Grill gate
Supplying & Fixing of Jolly including cost & Conveyance etc., complete
Distempering into two coat with best approved colour including labour charge etc., complete.
Emulsion Painting into two coats with using best quality and approved Emulsion paint over one coat of Cement paint primex including all cost and conveyance etc., complete.
Painting two coats over new iron works using ready mixed enamel paintincluding cost and conveyance of paint and all labour charges etc complete
Fixing of steel door including all materials and labour charges etc., complete
Fixing of steel window including all materials and labour charges etc., complete
Supply and fixing in position of best Indian make White glazed earthernware Oriya Pan Indian water closet including all cost etc., complete
Supply and fixing in position of best with European water closet with cistern tank including all accessories etc., complete
Supply and fixing in position of wash basin of size 550x400 mm with pedestal including all accessories etc., complete
32 mm UPVC pipe
1000 sintex with pipe arrangements
Nalli
Electrification
Light point SD22
Supplying and fixing Tube light SD88
Supply and fixing CFL SD80
Supply and fixing CFL Head SD83
Fan point SD22
Supply and fixing Fan SD106
Plug point 3x3 SD139
Meter board SD125
DAP switch SD142
GI service pipe SD69
Runoff wire SD64
Paver Block
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Supplying and erecting centering shuttering including necessary supports for plane
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and
Providing and laying and compacting graded stone aggregate toWMM Specification
Collection and supply of Stone Dust and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Providing and Laying of Interlocking Concrete Block (Surface Textured) Pavements having thickness 60mm and compacted over a thin bedding sand layer of 25 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Specification of Rural roads-2014 and Technical specification clause 1504.
Part-4:- Construction of Panchayat Office Building at Nedungulam Panchayat.
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundationdigging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Ist Depth 0.00 -0.30m
II nd Depth 0.30 -0.60m
III rd Depth Above 0.60m
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Cement concrete 1:3:6 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and filling with filling sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc, complete For Foundation
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc., complete.
Reinforced cement concrete 1:11/2:3 mix using 20 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., - Below Basement
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., - Slab and Beam
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by we
Paving the Floor with Vitrified tiles in CM 1:3 20mm thick
Ceramic tiles flooring laying with new ceramic tiles of size 300x300x6 mm laid in C M 1:3 inculding cost of white cement and labour charges etc
Dadooing the walls with new Glazed tiles of size 150 x150 x6 mm laid in CM 1:2 ,10 mm thick and pointig with white cement using 0.40 Kg/m2 including finishing the joint and pointing flush with ties surface
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Fabrication and supply of mild steel Door of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Door 1.10 x 2.10 m
Door 1.00 x 2.10 m
Toilet door 0.75 X 1.80 m
Fabrication and supply of mild steel Window of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Window 1.20 x 1.30 m
Window 1.50 x 1.30 m
Towards cost and supply of Rolling shutter of size 1.20X2.10m
Grill Gate of size 1.20X2.10m
Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall )
Painting two coats with approved Exterior Emulsion Painting all cost and conveyance of labour charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Painting two coat of new iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Labour charges for fixing of Steel Door including all labour charges etc. complete.
Door 1.10 x 2.10m
Door 1.00 x 2.10 m
Door 0.75 x 2.10m
Labour charges for fixing of Steel Window including all labour charges etc. complete.
Window 1.20 x1.30
Window 1.50 x1.30
Supplying and delivery of Indian Water Closet including P Trap set all cost of labour charges etc.,
Supplying and delivery of European Water Closet including P Trap set all cost of labour charges etc.,
Supply and delivery of wash basin
32mm UPVC Pipe
Nalli (including Coupling, bend etc.,)
Electrification
Light point SD22
Supplying and fixing Tube light SD88
Supply and fixing CFL SD80
Supply and fixing CFL Head SD83
Fan point SD22
Supply and fixing Fan SD106
Plug point 3x3 SD139
Meter board SD125
DAP switch SD142
GI service pipe SD69
Runoff wire SD64
Part-5:- Construction of Public Distribution Shop at Pallapatti Muthuramalingapuram colony Village in pallapatti Panchayat
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete.
Collection and supply of M-Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Refilling the basement with Excavated earth other than sand complying the Standard Secifications
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., - Slab and Beam
Reinforced cement concrete 1:11/2:3 mix using 20 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by we
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Supplying and Fixig of door size 1.10x2.10 m
Supplying and fixing of Door size 0.75x1.80
Cost and supply of Window size0.9x1.30 m
Cost and supply of Window size0.75x0.9m
Cost and of Rolling shutter
Supply and fixing ventilator
Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall )
Painting two coats with approved Exterior Emulsion Painting all cost and conveyance of labour charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Painting two coat of new iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Fixing of steel door including all materials and labour charges etc., complete
Fixing of steel window including all materials and labour charges etc., complete
Fixing for Rolling shutter including labour charges etc.,
Supply and fixing in position of best Indian make White glazed earthernware Oriya Pan Indian water closet including all cost etc., complete
Light point SD22
Supply and fixing CFL Head SD83
Fan point SD22
Plug point 3x3 SD139
Part-6:- Construction Anganwadi Building in Nehru colony Village at Pallapatti Panchayat
Earth work excavation in hard stiff clay soil with initial lead and lift as per SS 20B for foundation as per SL. No.148
Cement concrete 1:4:8 mix using 40m BSS metal including cost and conveyance of all materials, watering, curing and compacting concrete and all other incidental charges etc., complete.
Brick work in CM 1:5 mix using third class country bricks of size 8 3/4 x 4 1/4 x 2 3/4 including all cost and conveyance of materials and labour charges etc., complete.
Collection and supply of M-Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Column
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Grade Beam
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Plinth Beam
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Above Plinth Beam
Reinforced cement concrete 1:11/2:3 mix using 20 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and finshed with Cement mortor 1:4 -20mm thick plastering including cost and conveyance of all materials to site and all labour charges etc complete
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by we
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying and Fixig of door size 1.10x2.10 m
Supplying and fixing of Door size 1.00x2.10
Supplying and fixing of Door size 0.75x1.80
Cost and supply of Window size1.20x1.30 m
Ventilator
Supply and fixing of Jolly including all cost and conveyance etc, complete
Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall )
Painting two coats with approved Exterior Emulsion Painting all cost and conveyance of labour charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Painting two coat of new iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Fixing of steel door including all materials and labour charges etc., complete
Fixing of steel window including all materials and labour charges etc., complete
Baby friendly Toilet
Supply and fixing in position of best with European water closet with cistern tank including all accessories etc., complete
Supply and fixing in position of wash basin of size 550x400 mm with pedestal including all accessories etc., complete
32 mm UPVC pipe
500sintex with pipe arrangements
25mm pvc pipe
Nalli
Light point SD22
Supplying and fixing Tube light SD88
Supply and fixing CFL SD80
Supply and fixing CFL Head SD83
Fan point SD22
Supply and fixing Fan SD106
Plug point 3x3 SD139
Meter board SD125
GI service pipe SD69
Runoff wire SD64
Part-7:- Construction School Toilet for Girls PUMS school at Pallapatti village and panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Centering charges for sides and soffits of R.C.C.works including labour etc., complete as per standard specification.
Supplying and fabrication of steel for R.C.C. works including all cost and conveyance of materials, labour charges such as cutting, bending, tying and placing in position, etc., complete as per standard specification.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Dadooing in CM 1:2 mix using any colour glazed tiles including all charges etc., complete
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by we
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Towards the cost and supply of IWC with foot rest and P-Trap EWC with 10 litres tank including all charges etc., complete
Supply and fixing of MS pipes and fittings etc
Supply and fixing of Galvalume sheet - 0.47mm thick include all charges etc
Supply and fixing of steel door of size 0.75 x 1.80m
Supply and fixing of RCC Jolly of size 0.60 x 0.3m
Supply and fixing of 1000 liter capacity PVC tank
Supply and fixing of 3 Tap point Include GI pipes,PVC pipes and specials including all charges fro Water supply arrangements
Part-8:- Construction of Girls Toilet in PUMS School at sengamalantchiyarpuram panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Centering charges for sides and soffits of R.C.C.works including labour etc., complete as per standard specification.
Supplying and fabrication of steel for R.C.C. works including all cost and conveyance of materials, labour charges such as cutting, bending, tying and placing in position, etc., complete as per standard specification.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Dadooing in CM 1:2 mix using any colour glazed tiles including all charges etc., complete
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by we
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Towards the cost and supply of IWC with foot rest and P-Trap EWC with 10 litres tank including all charges etc., complete
Supply and fixing of MS pipes and fittings etc
Supply and fixing of Galvalume sheet - 0.47mm thick include all charges etc
Supply and fixing of steel door of size 0.75 x 1.80m
Supply and fixing of RCC Jolly of size 0.60 x 0.3m
Supply and fixing of 1000 liter capacity PVC tank
Supply and fixing of 3 Tap point Include GI pipes,PVC pipes and specials including all charges fro Water supply arrangements
Part-9:- Constrcution of Girls Toilet in kangakulam PUPS School at sengamalantchiyarpuram panchayat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Centering charges for sides and soffits of R.C.C.works including labour etc., complete as per standard specification.
Supplying and fabrication of steel for R.C.C. works including all cost and conveyance of materials, labour charges such as cutting, bending, tying and placing in position, etc., complete as per standard specification.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Dadooing in CM 1:2 mix using any colour glazed tiles including all charges etc., complete
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by we
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Towards the cost and supply of IWC with foot rest and P-Trap EWC with 10 litres tank including all charges etc., complete
Supply and fixing of MS pipes and fittings etc
Supply and fixing of Galvalume sheet - 0.47mm thick include all charges etc
Supply and fixing of steel door of size 0.75 x 1.80m
Supply and fixing of RCC Jolly of size 0.60 x 0.3m
Supply and fixing of 1000 liter capacity PVC tank
Supply and fixing of 3 Tap point Include GI pipes,PVC pipes and specials including all charges fro Water supply arrangements
Part-10:- Constrcution of Panchayat Office Building in Sithamanaickenpatti Village & Panchayat
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundationdigging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Ist Depth 0.00 -0.30m
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc., complete.
Supplying and filling with filling sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc, complete For Foundation
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., - Below Basement
Reinforced cement concrete 1:11/2:3 mix using 20 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Paving the Floor with Vitrified tiles in CM 1:3 20mm thick
Dadooing the walls with new Glazed tiles of size 150 x150 x6 mm laid in CM 1:2 ,10 mm thick and pointig with white cement using 0.40 Kg/m2 including finishing the joint and pointing flush with ties surface
Fabrication and supply of mild steel Door of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.
Door 1.10 x 2.10 m
Toilet door 0.75 X 1.80 m
Window Size 1.20x1.30M
Window Size 1.50x1.30M
Cost of Rolling Shutter
Cost of Grill Gate
Supply and fixing of Jolly including all cost and conveyance etc, complete
Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall )
Painting two coats with approved Exterior Emulsion Painting all cost and conveyance of labour charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Painting two coat of new iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Labour charges for fixing of Steel Door including all labour charges etc. complete.
Labour charges for fixing of Steel Window including all labour charges etc. complete.
Supplying and delivery of Indian Water Closet including P Trap set all cost of labour charges etc.,
Supplying and delivery of European Water Closet including P Trap set all cost of labour charges etc.,
Supply and delivery of wash basin
Part-11:- Construction of Anganwadi building in Sithurajapuram village and Panchayat.
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundationdigging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Collection and supply of gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Reinforced cement concrete 1:11/2:3 mix using 20 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc., complete.
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Column
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Grade Beam
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Plinth Beam
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Above Plinth Beam
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Paving the Floor with scratch proof ceromic tiles of any colour and any size includind all cost and conveyance etc,..
Dadooing the walls with new Glazed tiles of size 150 x150 x6 mm laid in CM 1:2 ,10 mm thick and pointig with white cement using 0.40 Kg/Sq.m. including finishing the joint and pointing flush with ties surface
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and finshed with Cement mortor 1:4 -20mm thick plastering including cost and conveyance of all materials to site and all labour charges etc complete
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Exterior Emulsion Painting all cost and conveyance of labour charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall )
Supply and Deliver of Door 0.75x1.80
Supply and Deliver of Door 1.10x2.10
Supply and Deliver of Door 1.10x2.10
Supply and Deliver of Window 1.20x1.30M
Jolly 0.60x0.45M
Supply and Delivery of Baby Friendly Water Closet
Supply and Delivery of European water Closet
Supply and Delivery of Ventilator
Painting two coat of new iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Labour charges for fixing the steel doors including all cost and conveyance etc,, complete
Labour charges for fixing the Window doors including all cost and conveyance etc,, complete
Electrification
Light point SD22
Supplying & Fixing of Tube Light SD88
CFL at toilet SD80
CFL Bulk Head SD83
Fan Point SD22
Supplying & Fixing of Fan SD106
Plug Point (3x3) SD139
Run Off SD64
meter board SD125
GI service pipe SD69
Water Supply
32mm UPVC Pipe
S&D Of 500 litrs Capacity Sintex Tank
25 mm PVC pipes
Tap Point (Nalli, Bend, Coupling including all Charges)
Part-12:- Constrcution of Public Distribution Shop at OPRnagar Pudur village in Viswanatham Panchayat
Earth work excavation for foundation in all soils and sub soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Filling in well gravel with well rammed, watered and consolidated complying with standard specifications etc., complete.
Supplying and filling foundation and basement with filling sand layers not more than 15 cm thick, well rammed, watered and compacted complete complying with standard specification.
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Brick work in CM 1:5 mix using country bricks ground moulded of size 83/4"x41/4"x21/4" for the following including curing etc., complete complying with standard specifications. Rate for 10m3
Supplying and fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standard specification.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Column
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Grade Beam
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Above Plinth Beam
Reinforced Cement concrete 1:11/2:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Paving the floor with Kotta Green tiles of size 60cm X 60cm X 1.8 to 2 cm thick in Cement mortar 1:3 etc., complete complying with standard specifications and as directed by the departmental officers.
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Paving the Floor with Vitrified tiles in CM 1:3 20mm thick etc complete
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with colour glazed tiles of size 300x200x6 mm of best quality including cost and conveyance of all materials to site and all labour charges etc complete.
Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight of cement including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Distembering two coats including cost and conveyance of all materials to site and all labour charges etc comoplete
Emulsion two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete
Painting two coats over new iron works such as steel door, windows, ventilators, window bars, balustrades etc., with best approved colour over the existing priming coat etc., complete complying with standard specifications and as directed by the departmental officers.
Supply and Fixing of Cuddapah slab for Shelf including cost and conveyace of allmaterials to site complete
Supply and Delivery of Rolling shutterD RS (2.10x2.40)m (5.04x2150=10836)
Supply and Delivery of Rolling shutterD RS (1.80x2.40)m (4.32x2150=9288)
Supply and Delivery of Door 1.00m x 2.10m
Supply and Delivery of Door 0.90m x 2.10m
Supply and Delivery of Window (1.00x1.30)m
Supply and Delivery of Ventilator (0.90x0.60)m
Labour charge for fixing the steel Door including all labour charges etc,,complete
Labour charge for fixing the steel windows including all labour charges etc,,complete
Electrification
Wiring with 2x1.5 sqmm (22/0.3) PVC insulated SC unsheathed copper conductor cable of 1100V grade in suitable heavy gauge MS conduit pipe on wall and ceiling with MS accessories with switch box with 5A F.T. switch inflush with wall and covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for light point.
Wiring with 2x1.5 sqmm (22/0.3) PVC insulated SC unsheathed copper conductor cable of 1100V grade in suitable heavy gauge MS conduit pipe on wall and ceiling with MS accessories with switch box with 5A F.T. switch inflush with wall and covered with hylum sheet of 3mm thick with painting of suitable colour with continuous earth wire connection of 14 SWG TC wire for Fan point (For electronic Regulator)
Wiring with 2x1.5sqmm (22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100 V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories, in flush with wall, with 150mm x 100mm x 113mm TW switch box with 3 mm thick Hylem sheet cover for 5 A 3 pin non inter lockingWall socket with 5A Flush type switch with continuous earth wire connection of 14 SWG TC wire and making good of the concealed portion with suitable colour for concealed PVC plug point.
Supply and fixing of TNEB meter Board suitable for 32A Three Phase service connection with 3 Nos. 32A Fuse unit (500V) 32A neutral link and earth link (1" x 1/8" Copper flat) on TW plank of size 600mm x 450mm x 19mm with supporting TW reepers of 1" thick an either side with painting with suitable bolt and nuts for fixing the TW plank on wall with earth connection and inter connection with 7/20 PVC insulated copper wire from EB meter to fuse unit.
Supply and fixing of 1200mm sweep AC Ceiling fan complete with stepped electronic 300w regulator with 300mm down rod on the existing clamps (crompton make).
Supply and run of 4 x 6 sq.mm (84/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V on 7/20 GI bearer wire for service connection mains
Towards the cost of Provision for EB deposit including all cost & conveyance etc., complete.
Supply and fixing of WT bulk head fitting with guard (Philips / Bajaj / Crompton / K. Lite) suitable for11W CFL lamp with CFL
Supply and fixing of 32 Amps DP Switch of 500 V with metal clad with fuse and neutral (Side Handle) on suitable TW Board , with earth connection only
Supply and run of 4 x 6 sq.mm (84/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V grade in 32mm dia GI pipe (Class 'B') suitably bent at both ends with necessary angle iron up right and end supports for mains
Supply and fixing of single box type 4'40 W flu fitting complete with copper choke and condensor with TW round blocks on wall or ceiling with flu tube with PVC unsheathed Copper leads from terminals to the fitting.
Water Supply
Earth work excavation for in all soils classification SS20B including refilling the trenches after PVC line laying etc complete
Refilling with excavated earth etc complete
63 mm PVC Pipe (4KSC)
IWC (S.NO 177 ii)
15mm brass tap (S.NO 159)
500 litre sintex
Part-13:- Construction of Girls Toilet in PUMS at Zaminsalwarpatty village and panchayat.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete
Centering charges for sides and soffits of R.C.C.works including labour etc., complete as per standard specification.
Supplying and fabrication of steel for R.C.C. works including all cost and conveyance of materials, labour charges such as cutting, bending, tying and placing in position, etc., complete as per standard specification.
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc
Dadooing in CM 1:2 mix using any colour glazed tiles including all charges etc., complete
Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by we
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Painting two coats over new iron works using ready mixed enamel paint including cost and conveyance of paint and all labour charges etc complete
Towards the cost and supply of IWC with foot rest and P-Trap EWC with 10 litres tank including all charges etc., complete
Supply and fixing of MS pipes and fittings etc
Supply and fixing of Galvalume sheet - 0.47mm thick include all charges etc
Supply and fixing of steel door of size 0.75 x 1.80m
Supply and fixing of 1000 liter capacity PVC tank
Part-14:- Construction of Anganwadi Building at Zaminsalwarpatty village and panchayat.
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundationdigging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Refilling the basement with Excavated earth other than sand complying the Standard Secifications
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Reinforced cement concrete 1:11/2:3 mix using 20 mm HBG metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc., complete.
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Column
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Grade Beam
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Plinth Beam
Supplying and erecting centering shuttering including necessary supports for planesurface in foundation and basement and in all floors for R C C column footingcolumn plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc Above Plinth Beam
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Paving the Floor with scratch proof ceromic tiles of any colour and any size includind all cost and conveyance etc,..
Dadooing the walls with new Glazed tiles of size 150 x150 x6 mm laid in CM 1:2 ,10 mm thick and pointig with white cement using 0.40 Kg/Sq.m. including finishing the joint and pointing flush with ties surface
Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and finshed with Cement mortor 1:4 -20mm thick plastering including cost and conveyance of all materials to site and all labour charges etc complete
Finishing the top of roof with one course of PRESSED TILES of size 23cmx23cmx2cm laid over in CM 1:3 12mm thick etc comlete
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Exterior Emulsion Painting all cost and conveyance of labour charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall )
Supply and Deliver of Door 0.75x1.80
Supply and Deliver of Door 1.10x2.10
Supply and Deliver of Door 1.10x2.10
Supply and Deliver of Window 1.20x1.30M
Supply and Delivery of Ventilator
Supply and Delivery of Baby Friendly Water Closet
Supply and Delivery of European water Closet
Painting two coat of new iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Labour charges for fixing the steel doors including all cost and conveyance etc,, complete
Labour charges for fixing the Window doors including all cost and conveyance etc,, complete
Supply and fixing of cuddapah slab 20-30mm tk including all cost and conveyance
Electrification
Light point SD22
Supplying & Fixing of Tube Light SD88
CFL at toilet SD80
CFL Bulk Head SD83
Fan Point SD22
Supplying & Fixing of Fan SD106
Plug Point (3x3) SD139
Run Off SD64
GI service pipe SD69
meter board SD125
DPIC Switch
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P MARIAMMAL
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .