Tender Value
₹90.5 L
EMD Value
₹1.8 L
Closing Date
17 Jul 2026, 2:30 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Capital (Works)
ELEC. TRD
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or V whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
(a) The tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or One similar work each costing not less than the amount equal to 60% of advertised value of the tender. (b) (i) In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.
Defination of Similar Work :- Any Over Head Equipment (OHE) /Power Supply Installation (PSI) /Auxiliary Transformer (AT) work on 25 KV AC Railway Traction for new line electrification or addition and alteration involving Supply, Erection, Testing and Commissioning of any Railway System in India carried out on Zonal Railways/Construction/RE/RVNL Works or Public listed Company subject to conditions in the GCC with regard to public listed companies vide para 10.1 of GCC April 2022.
20 conditions · 5 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Until a formal agreement is prepared and executed, acceptance of this tender shall constitute a binding contract between us subject to modifications, as may be mutually agreed to between us and indicated in the letter of acceptance of my/our offer for this work.
I/We also hereby agree to abide by the Indian Railways Standard General Conditions Of Contract, with all correction slips up-to- date and to carry out the work according to the Special Conditions of Contract and Specifications of materials and works as laid down by Railway in the annexed Special Conditions/Specifications, Schedule of Rates with all correction slips up to date for the present contract
I/We have read the various conditions to tender attached hereto and agree to abide by the said conditions
I/We also agree to keep this tender open for acceptance for a period of 60 days from the date fixed for opening the same
I/We offer to do the work for Sr.Divisional Electrical Engineer, TRD, Salem Division, Salem, at the rates quoted in the attached schedule and hereby bind myself/ourselves to complete the work in all respects within the period of completion stipulated in the tender document, from the date of commencement of work of the tender.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking
However, Railways shall have the right to incorporate any such condition quoted by us, in the contract, at their discretion, if contract is placed on us.
The Tenderer should submit a copy of GST/PAN and NEFT Form.
GCC 2022- All GCC clauses (updated including with all correction slips on date) are applicable.
Salem Division - Provision of BM with current sensing in Branch line for quick isolation from main line
SA-TRD-2026-27-160-4
SA-TRD-2026-27-160-4
Open
Works - General
6 Months
Salem, Tamil Nadu
₹0
₹1.8 L
17 Jul 2026
19 Jun 2026
3 Jul 2026
91 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 90,48,914 | ||
| — | 2.00 | — | — | ||
| Preparation of design and drawings for switching stations | — | — | — | 87,254 | |
| — | 30.00 | — | — | ||
| Concrete for foundation & trench other than hard soil & rock | — | — | — | 2,38,500 | |
| — | 3.00 | — | — | ||
| Reinforced concrete for foundation & trench | — | — | — | 28,740 | |
| — | 10.00 | — | — | ||
| Supply without Insulator and erection of a suspension (9 Tonne) Insulator | — | — | — | 23,950 | |
| — | 18.00 | — | — | ||
| Supply without Insulator and erection of 25kV Post Insulator | — | — | — | 30,672 | |
| — | 4.00 | — | — | ||
| Supply without Insulator & erection of 25 kV D.O. Fuse switch | — | — | — | 56,240 | |
| — | 3.50 | — | — | ||
| Erection of special fabricated and galvanised steel structures other than Portals & traction-Masts not covered under items 3(b)(i) & 3(b)(ii). | — | — | — | 35,175 | |
| — | 3.50 | — | — | ||
| Supply of special fabricated and galvanised steel structures other than Portals & traction-Masts not covered under items 3(b)(i) & 3(b)(ii). | — | — | — | 4,73,200 | |
| — | 5.00 | — | — | ||
| Cable trench covers | — | — | — | 17,500 | |
| — | 4.00 | — | — | ||
| Erection of of 25kV P.T(Type-II) | — | — | — | 5,172 | |
| — | 4.00 | — | — | ||
| Supply of of 25kV P.T(Type-II) | — | — | — | 5,63,236 | |
| — | 4.00 | — | — | ||
| Erection of 25Kv C.T. (1500/750/5A) | — | — | — | 5,048 | |
| — | 4.00 | — | — | ||
| Supply of 25Kv C.T. (1500/750/5A) | — | — | — | 7,33,576 | |
| — | 160.00 | — | — | ||
| Erection of Current transformer circuits 110V DC & 240V AC supply circuits. (2x4 sqmm copper) | — | — | — | 4,000 | |
| — | 160.00 | — | — | ||
| Supply of Current transformer circuits 110V DC & 240V AC supply circuits. (2x4 sqmm copper) | — | — | — | 33,440 | |
| — | 180.00 | — | — | ||
| Erection of Potential transformer and 240V AC Supply Circuits.(2x2.5 sqmm copper) | — | — | — | 4,500 | |
| — | 180.00 | — | — | ||
| Supply of Potential transformer and 240V AC Supply Circuits.(2x2.5 sqmm copper) | — | — | — | 26,280 | |
| — | 100.00 | — | — | ||
| Erection of Earth leads 50 mm x 6 mm mild steel laid in the ground. | — | — | — | 8,900 | |
| — | 100.00 | — | — | ||
| Supply of Earth leads 50 mm x 6 mm mild steel laid in the ground. | — | — | — | 21,600 | |
| — | 150.00 | — | — | ||
| Erection of Earth leads 50mm x 6mm mildsteel flat laid exposed. | — | — | — | 11,400 | |
| — | 150.00 | — | — | ||
| Supply of Earth leads 50mm x 6mm mildsteel flat laid exposed. | — | — | — | 32,400 | |
| — | 15.00 | — | — | ||
| Erection of 8 SWG G.I. wire for earthing | — | — | — | 390 | |
| — | 15.00 | — | — | ||
| Supply of 8 SWG G.I. wire for earthing | — | — | — | 465 | |
| — | 10.00 | — | — | ||
| Erection of copper jumpers | — | — | — | 8,220 | |
| — | 10.00 | — | — | ||
| Supply of copper jumpers | — | — | — | 3,210 | |
| — | 30.00 | — | — | ||
| Erection of copper strips for equipment earthing | — | — | — | 3,360 | |
| — | 30.00 | — | — | ||
| Supply of copper strips for equipment earthing | — | — | — | 28,320 | |
| — | 80.00 | — | — | ||
| Erection of : Aluminum bus-bars 36mm x 28 mm | — | — | — | 54,400 | |
| — | 80.00 | — | — | ||
| Supply of : Aluminum bus-bars 36mm x 28 mm | — | — | — | 8,640 | |
| — | 18.00 | — | — | ||
| Erection of Aluminum bus-bar connectors:-Bus terminal (6480) | — | — | — | 1,188 | |
| — | 18.00 | — | — | ||
| Supply of Aluminum bus-bar connectors:-Bus terminal (6480) | — | — | — | 84,114 | |
| — | 8.00 | — | — | ||
| Erection of Aluminum bus-bar connectors:-Bus splice (6490) | — | — | — | 528 | |
| — | 8.00 | — | — | ||
| Supply of Aluminum bus-bar connectors:-Bus splice (6490) | — | — | — | 41,320 | |
| — | 8.00 | — | — | ||
| Erection of Aluminum bus-bar connectors:-Bus tee connector (6500) | — | — | — | 472 | |
| — | 8.00 | — | — | ||
| Supply of Aluminum bus-bar connectors:-Bus tee connector (6500) | — | — | — | 41,680 | |
| — | 6.00 | — | — | ||
| Erection of Aluminum bus-bar connectors:-Terminal connector 36/20 (6530) | — | — | — | 354 | |
| — | 6.00 | — | — | ||
| Supply of Aluminum bus-bar connectors:-Terminal connector 36/20 (6530) | — | — | — | 28,206 | |
| — | 6.00 | — | — | ||
| Erection of Aluminum bus-bar connectors:-Tap connector (6520) | — | — | — | 396 | |
| — | 6.00 | — | — | ||
| Supply of Aluminum bus-bar connectors:-Tap connector (6520) | — | — | — | 28,206 | |
| — | 6.00 | — | — | ||
| Erection of Aluminum bus-bar connectors:-Terminal connector Bolted Type (6830-1) | — | — | — | 354 | |
| — | 6.00 | — | — | ||
| Supply of Aluminum bus-bar connectors:-Terminal connector Bolted Type (6830-1) | — | — | — | 22,308 | |
| — | 10.00 | — | — | ||
| Supply of 9 Tonne insulator | — | — | — | 50,400 | |
| — | 18.00 | — | — | ||
| Supply of 25 kV Post Insulator | — | — | — | 1,11,600 | |
| — | 1.00 | — | — | ||
| Supply, Erection, commissioning and Testing of control and relay panel for one BM as per RDSO SpecNo.TI/SPC/PSI/PROTCT/ 6072 (wall Mount panel) | — | — | — | 14,40,000 | |
| — | 1.00 | — | — | ||
| Supply, Erection, commissioning and Testing of relay panel for 3 lines having only protection relays (Feeder Protection Relay, Delta I Protection Relay and Master Trip Relay) as per RDSO Spec No. TI/SPC/PSI/PROTCT/ 6072 | — | — | — | 46,50,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Instruction_to_tenderersTRD.pdf
ATTACHMENT
LISTOFSTANDARDDRAWINGSANDSPECIFICATIONS.pdf
ATTACHMENT
GCCApril2022ACS11andeBGaccepantcewithformat_compressed.pdf GCC 2022 ACS 11
ATTACHMENT
TenderBookletBMCurrentSensingonBranchLineforquickisolation.pdf Tender Booklet
ATTACHMENT
AnnexureVasperGCC2022.pdf
ATTACHMENT
1GCCApril2022.pdf
ATTACHMENT
GCCApril2022ACS11andeBGaccepantcewithformat_compressed.pdf
ATTACHMENT
TenderBookletBMCurrentSensingonBranchLineforquickisolation.pdf
ATTACHMENT
RevisedTenderBookletBMCurrentSensingquickisolation.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .