Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹3.0 L
EMD Value
₹5,900
Closing Date
16 Jul 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RNB Divn Budgam
Engineering complex Budgam
Construction of Cement concrete drain at (Abobaker colony) Govt. Degree college road Beeru.
2020_PWDJK_99979_2
NIT_No_30_MDB_2020-21
Open Tender
Civil Works
Item Wise
15 days
Beeru
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer RNB Divn Budgam
₹5,900
17 Jul 2020
8 Jul 2020
17 Jul 2020
8 Jul 2020
16 Jul 2020
8 Jul 2020
120 days
Amount
Earth work in excavation in all kinds of soil by Mechnical Means upto the required depth incl. ramming of the bed dressing of the sides, disposal of excavated materials by Mechanical Transport incl. all leads, lifts, loading , unloading and T&P required complete incl. dewatering if any.
Providing and laying stone soling (hand packed) incl. ramming, dressing , watering incl. cost and carriage of all materials involved complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shutttering. All work upto plinth level 1:4:8 (1 cement:4 coarse sand:8 graded stone aggregate 40mm nominal size (crushed) incl. cost and carriage of all materials involved complete
P/L in position specified grade of cement concrete excluding the cost of centering, shuttering finishing and reinforcement. All work upto plinth level. 1:2:4(1cement:2 coarse sand : 4 graded stone agg. 20 mm size) incl. carriage of all materials involved complete
Centring and shuttering incl. strutting, proping etc and removal of form work
In foundations, footings, bases of columns for mass concrete,landings Balconies & acces plate form.
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone agg)finished with a floating coat of neat cement incl. cement slurry, but incl. the cost of nosings of steps etc. complete. 50mm thick with 20 mm nominal size stone agg. Crushed incl. carriage of all materials involved complete
Providing and laying of MS pipes pipes for cross drainages incl. excavation of trenches upto required depth and jointing of pipes with cement slurry and jute yarn incl. all carriages and providing of proper cushion over the pipe surface complete (pipes to be laid at different spots) incl. cost of pipes complete incl. dewatering if any.(Pipes shall be supplied departmentally)
Structural steel work in built up section incl. cutting, hoisting, fiixing in position and applying a primer coat of approved steel primer all complete.
M/S ABDUL QAYOOM LONE
M/S DANISH HASSAN WAZA
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .