| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹17.9 LAccepted-Finance | L-1 | Accepted-Finance Lowest | |
| 2 | L-2₹19.7 L+₹1.8 L (10.3%)Rejected-Finance JHARIA BENIGANJ HARDOI | BENIGANJ | HARDOI | UTTAR PRADESH | L-2 | Rejected-Finance Highest | |
| 3 | L-3₹19.9 L+₹2.0 L (11.3%)Rejected-Finance | L-3 | Rejected-Finance Highest | |
| 4 | L-4₹21.2 L+₹3.3 L (18.6%)Rejected-Finance | L-4 | Rejected-Finance Highest | |
| 5 | L-5₹23.1 L+₹5.2 L (29.1%)Rejected-Finance | L-5 | Rejected-Finance Highest |
Tender Value
₹30 L
EMD Value
₹30,000
Closing Date
27 Dec 2021, 4:00 pmClosed
SE EWC Gorakhpur
Office of the SE EWC, Mohaddipur Gorakhpur
Shifting of HT/LT line at Thana Sahjanwa to Railways Station and R.O.B Sahjanwa road
2021_PVVNV_656915_1
03/EWC(G)/2021-22
Open Tender
Electrical Works
Item Wise
90 days
Sahjanwa Town
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EWC Gorakhpur
₹30,000
5 Jan 2022
15 Dec 2021
28 Dec 2021
15 Dec 2021
27 Dec 2021
15 Dec 2021
Amount
Carriage of following materials from store centre Gorakhpur to Sahjanwa Thana to Railway Station and ROB Road Sahjanwa
ST poles 9/ 11 MTR
Petty stock materials
11 KV ‘XLPE’ Cable 3x 185 mm²
11 KV ‘XLPE’ Cable 3x 70 mm²
LT ABC Cable (3x120+1x95+1x16)mm2
LT PVC 1 X 400 mm 2,LT PVC 3.5 X 400 mm 2
LT ABC Single phase cable ,LT PVC 4X16 mm 2
ACSR Weasel Conductor.
ACSR Dog Conductor.
Providing and fixing of following materials in the shifting of line at Sahjanwa thana to Station Road as per site required as per Resspo
Installation of LT Clamp with nut bolt & LT Schacle insulator on poles with materials.
Installation of 3 Phase D.B. Box For LT Line (I Hook, suspension ,dead-end,A-Clamp, Pearsing etc materials for installation of DB box & for hanging the LT ABC Cables on the poles in all span) (all 3 Phase D.B. Box For LT Line materials which will not be provided by the store and which are nessasary to do the work,have to be provided.)
Installation of Alluminium Lug 3x185mm2,Alluminium Lug 3x240/400 mm2 .
Installation of Holding clamps for Dropper,top channel, etc .
Installation of LT ABC Cable hanging clamp with complete acessories .
Erection of Single Pole on ST Pole 11 mtr For overhead Composite HT/LT line as per Scheudule with all fitting as per RESSPO including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories (MS Channel cross arm 100x50x2240mm (top channel) with clamp ,Painting of poles, number plate,danger board with clamp, barbed wire ,Painting, packing piece,LT CLAMP with schackle insulater for ST Pole 5 No, F-Bracket ,MS Channel X-arm clamp for ST pole, etc. Provided by contracter as per Resspo) . The work includes carriage & handling of all materials from site store to pit site. (all materials which will not be provided by the store and which are nessasary to do the work,have to be provided.)
Erection of Double Pole on ST Pole 11 mtr for 11 KV as per Scheudule with all fitting as per RESSPO including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories (Painting of poles, M.S. angle iron bracing clamps , top channel clamps, number plate,danger board with clamp,E Bracket, barbed wire ,Painting, packing piece etc. Provided by contracter as per Resspo) . (all materials which will not be provided by the store and which are nessasary to do the work,have to be provided.)
Erection of Single Pole on ST Pole 11 mtr For overhead LT line as per Scheudule with all fitting as per RESSPO including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories (Painting of poles, number plate,danger board with clamp, barbed wire ,Painting, packing piece,LT CLAMP with schackle insulater for ST Pole 5 No/LT ABC Hanging clamp etc. Provided by contracter as per Resspo) .(all materials which will not be provided by the store and which are nessasary to do the work,have to be provided.)
Erection of Single Pole on ST Pole 9 mtr For overhead LT line as per Scheudule with all fitting as per RESSPO including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories (Painting of poles, number plate,danger board with clamp, barbed wire ,Painting, packing piece,LT CLAMP with schackle insulater for ST Pole 5 No/LT ABC Hanging clamp etc. Provided by contracter as per Resspo) . (all materials which will not be provided by the store and which are nessasary to do the work,have to be provided.)
Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 11 KV Line road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, including supply, cutting, fabrication and fixing of guarding channel 75 x 40 x 3010 mm with clamps nut & bolts etc. as per drawing (all materials which will not be provided by the store and which are nessasary to do the work,have to be provided.)
Grouting of stay rods after providing stay clamp for ST Pole as per RESSPO (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension .
Making Sectional T-off with clamp after providing 11KV Sectional T-off with clamp,F/E Braket with complete work on poles.
Jointing charges of 11 KV ‘XLPE’ C/J Kit 3x185/70 mm² Outdoor.
Jointing charges of 11 KV ‘XLPE’ C/J Kit 3x185/70 mm² Straight through
Shifting of Existing 250/400 KVA T/F Installation upto energisation of T/F as per Schedule after safe Dismentling of existing 250/400 KVA T/F with safely for Re-erection and shifted on new plinth/Double pole by crane /hydra with complete earthing as per RESSPO Norms with all materials (Providing all materials like Copper L/Z Clamp For 400 KVA T/F, LT Clamp with nut bolt,dropper, Alluminium Lug & PG Clamp required size,11 KV Dropper 2 no, all Holding clamps for Dropper,top channel, for installation of T/F etc all materials which will not be provided by the store and which are nessasary to do the work,have to be provided)Fixing of all materials
Laying, spreading, lifting and final sagging of 3 phases of ACSR Dog conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp(provding item) for Dog as per requirement in 03 Nos. conductor in parallel. The work includes carriage & handling of all materials from site store to pit site.
Laying, spreading, lifting and final sagging of 3 phases 5 Wire of ACSR Dog conductor & Neutral on Weasal conducter in accordance with profile and sag chart including binding, Jumpering with fixing of LT PVC Spacer for proper gap in conducters in every span 4 Nos minimum required.
Disconnection and Reconnection of Existing LT cable connection in the path of Shifting of line as per follwoing details.
L.T. and Domestic Consumer connection cable.
Commercial and Power Consumer Connection cable.
Construction of 250/400 KVA Transformer plinth suitable size for shifting of existing plinnth mounted Distribution Transformer as per required size with as per RESSPO Norms
Laying of 11 KV ‘XLPE’ cable in air after providing 4” dia. G.I. pipe 3m long and all clamps with Complete work.
Laying of 11 KV 3x185/70 mm² ‘XLPE’ cable(D/C) by digging pit & making trench in Proper size(1M depth x0.7M wide) below ground level by fixing bricks(4½˝)on both side of trench wall and 9˝ brick work at the centre of the trench along the cable.Fixing brick slab on top after filling sand around both the cable including cost of bricks and sand as per site required.
Laying of 11 KV 3x185/70 mm² ‘XLPE’ cable(D/C) by HDD Methed as per site required.
Laying of 3.5X400 mm2, 1 x400 mm2 mm² LT cable by digging pit & making trench in Proper size(1M depth x0.7M wide) below ground level by fixing bricks(4½˝)on both side of trench wall and 9˝ brick work at the centre of the trench along the cable.Fixing brick slab on top after filling sand around both the cable including cost of bricks and sand/HDD Methed/Hanging on Poles as per site required.
Laying/Hanging of LT ABC Cable 3.5x120 mm² with all required complete work after providing LT ABC Hanging Clamp as per RESSPO as per site requred.
Laying/Hanging of LT ABC Cable single phase cable all required complete work providing LT ABC Hanging Clamp and DB Box after providing as per RESSPO Norms required quantity as per RESSPO as per site requred. (all materials which will not be provided by the store and which are nessasary to do the work,have to be provided.)
Fabrication of STP 11 mtr To 13 mtr as per RESSPO. (all materials which will not be provided by the store and which are nessasary to do the work,have to be provided.)
Extra cost for drilling horizontal hole 2 Mtr below the road & inserting 6” dia. M.S. Pipe for passing of LT/HT cable different size for Road /Pulliya Crossing at different places in the path of Laying of cable.
Providing and Laying HDPE Pipe 4 inch (PN-6)for passing of LT/HT cable different size in the path of lineshifting at different places after digging of road/on Poles as per site required.
Provoding and fixing of MS cable ladder as required design for rising of 11 KV cable to 11/0.4 KV T/F with grouting and earthing complete in all respect( providing all MS channel/Angle required size, cable clamp with nut bolt)
Safe Dismentling of existing LT ABC cable of different sizes and Re-laying on poles with complete work
Dismentling charges of existing Single Pole 9 mtr. ST Pole.
Dismentling charges of existing Single PCC Pole 8.5 mtr.
Dismentaling of old HT/LT Lines
Shifting,Loading Carriage & Unloading of old and damaged 11 KV Line materials from work site to JE Dump store Gorkahpur Distt. Gorakhpur.
Shifting,Loading Carriage & Unloading of old and damaged 11 KV Line materials from JE Dump store to store centre Gorkahpur Distt. Gorakhpur.
Carriage of Store Materials for Atal awasiya Yojna, Sahjanwa.Shifting ,loading ,Carriage & unloading of following materials from store centre Gorakhpur to work site .
ST/PCC pole
Petty stock materials
ACSR Conducter
Execution of work at ATAL Avasiya Vidyalaya Campus, Sahjanwa, Gorakhpur
Erection of Single Pole on ST Pole 9 mtr For overhead LT line with all fitting as per RESSPO including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories (Painting of poles, number plate,danger board with clamp, barbed wire ,Painting, packing piece,LT CLAMP with schackle insulater for ST Pole 5 No etc. Provided by contracter as per Resspo) .
Erection of Single Pole on PCC 8.5 mtr For overhead LT line as per RESSPO with all fitting as per RESSPO including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories (Number plate,danger board with clamp, barbed wire ,Painting, packing piece,LT CLAMP with schackle insulater for 8.5 Mtr PCC Pole 5 No etc. Provided by contracter as per Resspo) .
Laying, spreading, lifting and final sagging of 3 phases 5 Wire of ACSR weasal/Dog conductor in accordance with profile and sag chart including binding, Jumpering with fixing of LT PVC Spacer for proper gap in conducters in every span 4 Nos minimum required complete in all respect.
Grouting of stay rods after providing stay clamp for ST Pole as per RESSPO (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension .
Disconnection and Reconnection of Existing LT cable connection in the path of Shifting of line .
Dismentling of existing LT Line conducter safely & re-stringing LT Line complete in all respect if required
Dismentling charges of existing Single Pole 9 mtr. ST Pole.
Dismentling charges of existing Single PCC Pole 8.5 mtr.
Dismentaling of old HT/LT Lines
Shifting,Loading Carriage & Unloading of old and damaged 11 KV Line materials from work site to JE Dump store Gorkahpur Distt. Gorakhpur.
Shifting,Loading Carriage & Unloading of old and damaged 11 KV Line materials from JE Dump store to store centre Gorkahpur Distt. Gorakhpur.
M/s Anil kumar singh
ARK ENGINEERING
Naresh Agarwal constructions Pvt Ltd
M/S SHUKLA ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .